PRODUCTS & PLATFORMS OVER PROGRAMS,
PROJECTS, & PROCESSESPresented by Kevin Burns Nov. 6, 2016
[email protected], @kevinbburns 1
Before we begin
• Write down a question you want answered or a challenges you want a solution for.
• We’ll discuss these at the end if not covered in the presentation.
[email protected], @kevinbburns 2
My history/experience
[email protected], @kevinbburns 6
The short answer…
Programs, projects, and processes have a shorter life expectancy than Products (services) and Platforms.
Programs, projects, and processes are often expected to end whereas products (services) and platforms are not expected to end.
If we focus too intensively on the programs, projects and processes we run the risk of creating fragility in our products (services) and platforms.
Prioritize the qualitative aspects of the product (services) and platforms over the programs, projects, and processes.
Why are Products (services) and Platforms more important than Progs, Projs, and Processes?
[email protected], @kevinbburns 7
Problem: Programs & Projects vs Products & Platform Structure Challenge
Organizing talent around progs and projs vs products (services) and platforms causes the following problems/challenges.
• Inefficient coordination of work when it crosses application domains. Queuing contention happens at time of implementation vs upstream in planning phase.
• Learning curve required to ramp-up on unfamiliar product (service) and application domain.
• Lack of quality ownership within a given domain if we’re constantly shifting domains. Projects are tech debt factories.
• Inability to stabilize throughput potential (teams need to be stable in their app domains to produce constant throughput potential and delivery efficiency)
• Queuing contention related to code merges and updates are more difficult under project model.
• Project code branches exacerbate code merge challenge.
• App domains with multiple backlogs (i.e. support and project) causes contention at implementation phase instead of planning phase.
• Prioritization problems cause too much context shifting.
PerformingForming Storming Norming
Every time we assemble new teams, teams go through the ‘change process’, i.e., they have to figure-out how to work as a cohesive [email protected], @kevinbburns 9
PerformingForming Storming Norming
Let’s reduce the impact of ‘the change process’ by creating stable product (service) or domain teams, i.e., teams that stay together to deliver incremental service value within their application domain of expertise.
[email protected], @kevinbburns 10
Solution: Products & Platforms OVER Progs & Projs
Structure talent around product (service) and platform domains (application or service domains).
• Product (service) and Tech leads within the product domains support decomposition of large-scale initiatives (programs/projects).
• Solution decomposition fills product (service) domain work queues (aka stable delivery team backlogs), i.e., progs/projs funnel stories with unique development needs to the appropriate teams.
• Create one backlog within a product capability domain (support and prog/proj stories (work items) get prioritized/sequenced into a single product capability backlog)
• Product (service) leadership reconciles contention challenges upstream of stable delivery team implementation through ranking and optimal work sequencing exercises.
• Solution decomposition and work sizing exercises inform prioritization and contention reconciliation challenges.
• Code quality increases as team members take more ownership of their app domain.
• Planning becomes easier as teams take ownership of their throughput potential (velocity).
• Team performance increases as teams mature through forming, storming, and norming phases of Satirmodel.
In In In In In In
Team A
Team B
Team C
Team D
Progs / Projs 1 Progs / Projs 2 Progs / Projs 3
Product (service) capability delivery teams are challenged with multiple competing support and project priorities as they iteratively deliver and deploy software. This can cause inefficient context shifting and churn in solutioning and delivery process. This can also lead to fragility and tech debt within the code-base. Consider more intentional focus on prog/proj prioritization/ranking, decomposition, and optimal work sequencing across stable platform service delivery teams. Consider Work-In-Progress agreement limits/targets to support efficient delivery.
Rn Rn Rn
Stories filling iteration queues
Platform Service Area Release Planning
A
Stable AgileTeam
PO BA
SQE SME
SM
B
Stable AgileTeam
C
Stable AgileTeam
D
Stable AgileTeam
E
Stable AgileTeam
F
Stable AgileTeam
G
Stable AgileTeam
H
Stable AgileTeam
I
Stable AgileTeam
J
Stable AgileTeam
Platform 1 Platform 2 Platform 3 Platform 4 Platform 5
Prog /Proj 2Prog/Proj 1 Prog / Proj 3
Service Area and Tech Lead Solution Team members are challenged with multiple competing project priorities as they iteratively deliver and deploy software. This can cause inefficient context shifting and churn in solutioning and delivery process. This can also lead to fragility and tech debt within the code-base. Consider Work-In-Progress agreement limits/targets to support efficient delivery.
Solution Team Solution TeamSolution Team Solution Team Solution Team
Service Area Release Planning
LSE Arch
PO BA
SQE SME
SM
LSE Arch
PO BA
SQE SME
SM
LSE Arch
PO BA
SQE SME
SM
LSE Arch
PO BA
SQE SME
SM
LSE Arch
Multi-month
Monthly
2-weeks
Leadership T-Shirt Sizing
X-S 1 SprintS <1 monthM 1-3 monthsL 3-9 monthsX-L >9 months
Team Planning-Poker Fibonacci Sizing
(1,2,3,5,8,13,20,50,100)
Team task hours to capacity (2,4,6)
Solution Decomposition Sizing Pattern
[email protected], @kevinbburns 15
[email protected], @kevinbburns 16
Lean, XP, Scrum & Kanban
[email protected], @kevinbburns 17
Who?
[email protected], @kevinbburns 19
Socratic Method• Cooperative argumentative dialogue, based on
asking and answering questions to stimulate critical thinking
• Method of hypothesis elimination
• How can we validate what we don’t know?
• How can we turn unknowns into knowns?
• Help team members arrive at their own conclusions based on Q&A. Don’t give answers away, rather, ask questions that guide team members to the right answer.
Frederick Taylor's scientific
management consisted of four principles:
1. Scientific study of tasks.2. Develop employees rather than
passively leaving them to train themselves.
3. Provide detailed instruction and supervision
4. Divide work equally between managers and workers
Servant leadership is both a leadership philosophy and set of leadership practices. Traditional leadership generally involves the accumulation and exercise of power by one at the “top of the pyramid.” By comparison, the servant-leader shares power, puts the needs of others first and helps people develop and perform as highly as possible.
1. Server others: How can I help?2. Promote Teamwork over Individual heros3. Doers know best how to improve4. Remove barriers to improvement/progress
Robert K. Greenleaf
Edward Deming
Statistical process control and PDSA (Plan-Do-Study-Act)
1. Appreciate the system
Are you aware of your constraints?
2. Understanding variation
How dynamic is your environment?
3. Psychology
Are you safe?
4. Epistemology
How are you developing knowledge?
• Originally known as “just-in-time production” and later as the Toyota Production System (TPS)
• Created by Kiichiroo Toyoda and Taiichi Ohno to improve how Toyota operated
• Objectives are to: • Eliminate waste• Design out inconsistency• Design out overburdening the
system
• Lean Manufacturing
[email protected], @kevinbburns 24
Why?
[email protected], @kevinbburns 25
• Continuous improvement
• Respect for people, psychological safety
• Long-term philosophy
• Add value to the organization by developing your people and partners
• Continuously solving problems drives organizational learning
Lean Principles
[email protected], @kevinbburns 26
What & How?
[email protected], @kevinbburns 27
Extreme Programming (XP)
• Pair-programming
• Rapid application development (RAD)
• Experimentation
• Prototype
[email protected], @kevinbburns 28
Scrum Events
• Plan
• Daily Standup
• Demo and Review
• Retrospective
Iteratively and incrementally deliver value
[email protected], @kevinbburns 29
• Based on Toyota’s “just-in-time production” concept
• Japanese word for “visual signal” or “card”
• Used to show a sequence of events with instructions on the cards, when used in manufacturing
• Enables inventory control with visibility into the full system to find areas of improvement
Kanban
[email protected], @kevinbburns 30
Kanban Software Development• Cards move across a Kanban board as the team works on them
• Emphasizes continuous delivery without over burdening the team
• Three basic principles:
• Workflow (continuous)
• Work In Progress limit (WIP)
• Flow (cycle-time)
[email protected], @kevinbburns 31
Kanban Board Example 1
[email protected], @kevinbburns 32
Kanban Board Example 2
[email protected], @kevinbburns 33
Kanban Board Example 3
[email protected], @kevinbburns 34
Task Board Example 1
[email protected], @kevinbburns 35
Task Board Example 2
[email protected], @kevinbburns 36
Kanban Board Example 4
[email protected], @kevinbburns 37
When?
[email protected], @kevinbburns 38
Do any of these sound familiar?
• “We’ve done Scrum for a long time now and our process improvement has levelled off. How can we take our process to the next level?”
• “Our needs and priorities shift on a daily basis”
• “We don’t like fixed-length, fixed-commitment iterations”
• “We are spending too much time planning and estimating”
[email protected], @kevinbburns 39
Scrum vs. KanbanScrum Kanban
Process tool based in Lean and Agile principles
Process tool based in Lean and Agile principles
Empirical process Empirical process
Plans work in time-boxes called Sprints with prescribed activities at beginning and end of each Sprint
Is a flow-based model with no prescribed ceremonies. Team can choose to do ceremonies whenever they deem necessary
Places a WIP limit on the amount of work to be completed in a Sprint (Sprint Backlog based on Velocity)
Places WIP limits on each workflow state
3 specific roles No specific roles
Prescribes sizing work items which is then measured as Velocity
Measures lead time (time it takes for item to go through the entire workflow) without sizing work items
Source: http://www.infoq.com/minibooks/kanban-scrum-minibook [email protected], @kevinbburns 40
Don Reinertsen’s Seven Big Ideas2nd Generation Lean Product Development
1. Understand your economics
2. Manage your queues
3. Exploit variability
4. Enable smaller batches
5. Control WIP and start rates
6. Prioritize based on economics
7. Accelerate feedback
[email protected], @kevinbburns 41
Guidelines for decision-making
• Set strategic goals/guidelines for decision-making so low-level tactical decision can be decentralized while still being aligned within strategic goals/objectives.
• While good intentioned, centralized decision-making is often slow and suboptimal because it lacks the context of all the variable at play at tackle level
Don Rienertsen’s 2GLPD [email protected], @kevinbburns 42
2. Manage Your Queues
• Many product developers assume higher utilization leads to faster development.
• They neither measure nor manage the invisible queues in their process.
• Consequently, they underestimate the true cost of overloading their processes.
• Such overloads severely hurt all aspects of development performance.
Don Rienertsen’s [email protected], @kevinbburns 43
Effect of Capacity Utilization
10 20 30 40 50 60 70 80 90 100
05
10
15
20
Qu
eue
Size
% Capacity Utilization
Don Rienertsen’s [email protected], @kevinbburns 44
Managing Queues
Cost of Excess Delay
Total Cost
Dollars
Excess Product Development Resources
Minimize Total Cost to Maximize Profits
Don Rienertsen’s [email protected], @kevinbburns 45
Why Queues Matter
• Queues Create…
– Longer cycle time
– Lower Quality
– More variability
– Increased risk
– More overhead
– Less motivation
Managing queues is the key to improving product development economics
Don Rienertsen’s [email protected], @kevinbburns 46
3. Exploit Variability
• Manufacturing wants reduced variability
• Product development needs variability in order to innovate
• We need to understand what makes variability valuable and manage our process to create these conditions
• We need a development process that functions in the presence of variability
Don Rienertsen’s [email protected], @kevinbburns 47
Asymmetric Payoff and Option Pricing
Expected Price Payoff vs Price
Expected Payoff
Exp
ecte
d P
ayo
ff
Price
PricePrice
Pro
bab
ility
Payo
ff
Strike Price
Strike Price
Don Rienertsen’s [email protected], @kevinbburns 48
Higher Variability Raises the Payoff
Exp
ecte
d P
ayo
ff
Price
Strike Price
Payoff SD = 15
Payoff SD = 5
Option Price = 2, Strike Price = 50, Mean Price – 50, Standard Deviation = 5 and 15
Don Rienertsen’s 2GLPD [email protected], @kevinbburns 49
4. Enable Smaller Batches
• When work products are invisible, batch sizes are invisible
• When batch sizes are invisible, product developers pay little attention to them
• Many companies institutionalize large batch sizes
• Batch size reduction is attractive because it is fast, easy, cheap, granular, leveraged, and reversible
• It is a great starting point for LPD
Batch Size Queues Cycle Time
X 0.5
X 0.5
X 0.5
Don Rienertsen’s 2GLPD [email protected], @kevinbburns 50
Drawing Review Process
200
10 Weeks
20
1 Week
Unreviewed Drawings
Large Batch Small Batch
Don Rienertsen’s 2GLPD [email protected], @kevinbburns 51
Benefits of Small Batch Testing
Higher ValidityFewer Open
Bugs
Faster Cycle Time
Early Feedback
Less Debug Complexity
More Efficient Debugging
More Uptime
Smaller Change
Fewer Status Reports
Less Requirement Changes
Faster Learning
Lower Cost Changes
Cheaper Debugging
Cheaper Testing
Less Non-Value-Added
Better Code
Cheaper Correction
Better Economics
Don Rienertsen’s 2GLPD [email protected], @kevinbburns 52
Setting Batch Size
Transaction Cost
Cost
Items per Batch
Economic Batch Size
1 2 3 4 5 6 7 8 9 10
05
10
15
20
Total Cost
Don Rienertsen’s 2GLPD
[email protected], @kevinbburns 53
5. Control WIP and Start Rates
• Many developers incorrectly assume that the sooner they start work, the sooner they will finish it
• They are constantly tempted to start too much work
• This dilutes resources and causes long transit time through their processes
• A long transit time hurts efficiency, quality and responsiveness
Don Rienertsen’s 2GLPD [email protected], @kevinbburns 54
Little’s Formula
• By constraining WIP in development processes we can control cycle time
• This approach, which is known as Lean Kanban, is currently growing rapidly in software development
MeanResponseTime = MeanNumberInSystem / MeanThroughput
Don Rienertsen’s 2GLPD [email protected], @kevinbburns 55
Control Number of Active Projects
1234
1
2
3
4
COD Savings of Proj 1 & 2 Late Start Advantages for Proj 3 & 4
Time to Deliver
Time to Deliver Time to Deliver
Don Rienertsen’s 2GLPD [email protected], @kevinbburns 56
Avoid Long Planning Horizons
• The further out you plan, the less likely your forecast will be accurate
• Don’t do detailed analysis on things beyond a quarter
• Market conditions change everyday, this can change requirements
• Changing requirements cause churn (waste)
Don Rienertsen’s 2GLPD [email protected], @kevinbburns 57
Use Visual WIP Control Boards
Ready Queue Coding Ready to Test Testing Done
WIP constraints = 10
13
14
15
16
11
10
9
8
7
6
5
4
3
2
112
?
Don Rienertsen’s 2GLPD [email protected], @kevinbburns 58
6. Sequence Work Correctly
• The sequence in which work is processed is called the queuing discipline
• By changing the queuing discipline we can reduce the cost of a queue without decreasing the size of the queue
• Since manufacturing has homogeneous flows it always uses FIFO (First-In-First-Out)
• For the non-homogeneous flows of product development other approaches have better economics
Don Rienertsen’s 2GLPD [email protected], @kevinbburns 59
Use FIFO for Homogeneous Flow
First-In First-Out
Cost of
Delay
12
3A
BTime
Co
st
Delay CostLast-In First-Out
Cost of
Delay1
23A
BTime
Co
stProject Duration Cost of Delay
1 3 3
2 3 3
3 3 3
Don Rienertsen’s 2GLPD [email protected], @kevinbburns 60
Weighted Shortest Job First (WSJF) for Non-homogenous flow
High Weight First
Cost of
Delay
1
23
AB
Time
Co
st
Delay Cost
Low Weight First
Cost of
Delay
A
B
Time
Co
st
Project Duration Cost of Delay
Weight = COD/Duration
1 1 10 10
2 3 3 1
3 10 1 0.1
1
23
160 796 % Reduction in COD
Don Rienertsen’s 2GLPD [email protected], @kevinbburns 61
Culture Survey
Text ‘kevinburns785’ to ‘22333’, and then type A, B, C, D
[email protected], @kevinbburns 63
[email protected], @kevinbburns 64
[email protected], @kevinbburns 65
[email protected], @kevinbburns 66
[email protected], @kevinbburns 67
[email protected], @kevinbburns 68
Westrum Model: How orgs process info
Pathological Bureaucratic Generative
Power oriented Rule oriented Performance oriented
Low cooperation Modest cooperation High cooperation
Messengers shot Messengers neglected Messengers trained
Responsibilities shirked Narrow responsibilities Risks are shared
Bridging discouraged Bridging tolerated Bridging encouraged
Failure scapegoating Failure justice Failure inquiry
Novelty crushed Novelty problems Novelty implemented
How do we learn?
What helps us learn?
How psychologically safe is our environment?
Coaching, Mentoring, Learning
Child vs Adult learning style
Children (Pedagogy) Adults (Andragogy)
Rely on others to decide what is important to be learned
Decide for themselves what is important to learn
Accept info being presented at face value Need to validate the info based on their beliefs and experience
Expects what they are learning to be useful in their long-term future
Expects what they are learning to be immediately useful
Have little or no experience upon which to draw – are relatively “clean slates”
Have much experience upon which to draw –may have fixed viewpoints.
Little ability to serve as a knowledgeableresource to teacher or fellow classmates
Significant ability to serve as a knowledgeable resource to trainer and fellow learners.
Four Types of Learners
Learner Tactics
Visual Learners prefer to see info and to visualize the relationships between ideas
Give them charts and graphics, make your presentation highly visual and show relationships between your points
Auditory learners prefer to hear info rather than reading it or seeing it displayed visually
Give them a chance to repeat your points back to you by asking questions, calling for audience participation
Reading/Writing learners prefer to interact with text more than hearing or seeing it graphically
Give them written quizzes or a chance to write what they are learning and give them handouts to read.
Kinesthetic learners prefer hands-onexperiential learning; they learn best by doing.
Give them exercises that get them out of their seat and into role play type exercises.
Scientific Management vs Servant Leadership
Scientific Managers Servant Leaders
Study tasks of others Help others complete their tasks
Develop employees Promote teamwork over individual heros
Provides detailed instruction and supervision
Doers know best how to improve, help find way forward
Divide work nearly equally between managers and doers
Remove barriers to improvement/progress and facilitate teamwork
Leading Minds
The Zen Master
1. Lead from the inside-out2. Bench the ego3. Let each player discover his own destiny4. The road to freedom is a beautiful system5. Turn the mundane into the sacred6. One breath = one mind7. The key to success is compassion8. Keep your eye on the spirit, not on the scoreboard9. Sometimes you have to pull out the big stick10. When in doubt, do nothing11. Forget the ring
Edward Deming
Measure impact, validate learning, pivot, adjust
Statistical process control and PDSA (Plan-Do-Study-Act)
1. Appreciate the system
Are you about your constraints?
2. Understanding variation
How dynamic is your environment?
3. Psychology
Are you safe?
4. Epistemology
How are you developing knowledge?
Lean Startup
Build Measure
Learn
Value
Use a scientific method to learn
[email protected], @kevinbburns 81
Shu Ha Ri
• Shu, the student copies techniques without adapting them.
• Learn
• Ha, the student reflects on what’s been learned and breaks free
from traditions.
• Practice
• Ri, the student is now a practitioner extending the art.
• Innovate
Teams are motivated by…
1. Distinct vision and mission, a view of future state OKR = Objectives and Key Results
2. Foster personal growth and career developmentDo we foster a learning culture?
3. Recognize good performance on a regular basis, celebrate success Did we achieve our Key Results?
4. Listen to employee comments, complaints, ideas and take action where appropriate.Do you have a generative env?How psychologically safe is your evn?Are you a Server Leader or a Scientific Manager (or both)?
5. Encourage and empower employees to be self-directedAre you encouraging experimentation?
Quotes
“Control leads to compliance; autonomy leads to engagement.” Daniel Pink
“Treat them like volunteers” Mary Poppendieck
“The Team is the Product Owner” Mary Poppendieck
“Quality tends to fan out like waves” Robert M. Pirsig
Exercise: Coaching Attributes
1. Everyone writes their top coaching attributes on individual posted notes
2. We take turns putting them on the board into themes
3. We rank them in terms of important/value in our work environment
4. We discuss how to put them into practice
Exercise: Great Coaching Practices
1. Everyone writes their top coaching practices on individual posted notes
2. We take turns putting them on the board into themes
3. We rank them in terms of important/value in our work environment
4. We discuss how to put them into practice
Exercise: Agile Principles Survey
1. Conduct an Agile Principles Survey
2. Review and discuss results
3. Where are we doing well vs not so well?
4. What can we do to improve low preforming areas?
What are your biggest challenges?
Let’s have a collaborative discussion about your biggest challenges.
Wrap-up questions
• What did you learn today that you want to try?
• Is there anything blocking you from trying it?
• When will you try it?
Thank you!
[email protected]@sagesw.com
#kevinbburns
Please take a moment to fill out the evaluation.
[email protected], @kevinbburns 90
How to find Educational Session Evaluation
1. Open the Government IT Symposium Guidebook app on your mobile device.
2. Click on the menu bar on the top of the homepage.
3. Find and click on “Agenda & Educational Sessions” within the menu.
4. Scroll and find Session ______ (fill in your session title here)
5. Click on the Session and scroll to the bottom of the page to find “Educational Session Survey” and fill out the survey!
If you haven’t already downloaded our mobile app, below are the instructions on how to download the app: https://guidebook.com/g/itsym
1. Visit the above URL on your device
2. Tap the “download” button to get the free Guidebook app
3. Open Guidebook and look for the guide: Government IT Symposium
[email protected], @kevinbburns 91