mjpn-pgas-3514-mp-pr-020_permanent cathodic protection installation procedure_e_reva (1) 2.docx
DESCRIPTION
constructionTRANSCRIPT
PT. Perusahaan Gas Negara (Persero) Tbk.
PELAKSANAAN KERJASAMA PENINGKATAN KEHANDALANJARINGAN UNTUK PENYALURAN GAS WILAYAH PASURUAN
MOJOKERTO
Contract No.055600.PK/HK.02/PMO/2014
PT. ConnusaEnergindo PT. PGAS Solution
PERMANENT CATHODIC PROTECTION INSTALLATION PROCEDUREDocument No. Rev. Date
Page 1 of 12MJPN-PGAS-3514-MP-PR-020 A 27/02/2015
A Issued For Review 27-02-2015 JK HMD AK
REV DESCRIPTION DATE PREPARED CHECKED APPROVED REVIEWED APPROVED
PGAS SOLUTION PMC PGN
PT. PerusahaanGas Negara
(Persero) Tbk.
PT. PGAS Solution
PERMANENT CATHODIC PROTECTION INSTALLATION PROCEDUREDocument No. Rev.
Page 2 of 11MJPN-PGAS-3514-MP-PR-020 A
PT. ConnusaPT. Perusahaan
Gas Negara(Persero) Tbk.
TABLE OF CONTENTS
1.0 SCOPE ..........................................................................................................................................32.0 OBJECTIVE ..................................................................................................................................33.0 REFERENCE ............................................................................................................................... 34.0 DEFINITIONS ...............................................................................................................................35.0 RESPONSIBILITY ....................................................................................................................... 36.0 PROCEDURE INSTALLATION .................................................................................................4
6.1 Man Power.............................................................................................................................46.2 Tools....................................................................................................................................... 5
6.3 Trenching For CP..................................................................................................................6
6.4 Sacrificial Anode Installation............................................................................................... 7
6.5 Instalation...............................................................................................................................9
6.6 Direct Burial Cathodic Protection Cable............................................................................9
6.7 Cable Connections To Steel Pipe...................................................................................... 10
7.0 HEALTH SAFETY & ENVIROMENT ........................................................................................11
8.0 ATTACHMENT .............................................................................................................................12
Thermit Welding Process Instruction........................................................................................12
JSA.................................................................................................................................................12
NACE Level 2 Certificate............................................................................................................12