mission
DESCRIPTION
Mission. To be the only one-stop-shop for all Highway Management needs in the minds of customers by constantly innovating new products and services with breakthrough technology to fill gaps even before they are discovered by others... thus exceeding all expectations. Vision. - PowerPoint PPT PresentationTRANSCRIPT
To be the only one-stop-shop for all Highway Management needs in
the minds of customers by constantly innovating new products and
services with breakthrough technology to fill gaps even before they
are discovered by others... thus exceeding all expectations.
Mission
Our ultimate goal is to grow, evolve and be known as India’s First
Next Generation Highways Management Company that will transform
the Indian Highways Management Industry by providing world-class
products and unmatched services
Vision
Group Companies
BE Highway and Parking Automation
BE Software Solutions Pvt. Ltd.
BE Office Automation Pvt. Ltd.
BE Documentation Pvt. Ltd.
Our Experience
S. No Name of PlazaNumber of
LanesClient Scope of Work
1. Mahuvan (NH – 2) 12 Intertoll Operations
2. Moradabad (NH – 2) 12 Intertoll Operations
3. Bilaspur (NH – 8) 12 Intertoll Operations
4. Manoharpur (NH – 8) 10 Intertoll Operations
5. Palwal (NH – 2) 12 Intertoll Operations
6. Ahmedabad – Ahmedabad Baroda Expressway 12 NHAI Operations
7. Baroda – Ahmedabad Baroda Expressway 12 NHAI Operations
8. Nadiad - Ahmedabad Baroda Expressway 6 NHAI Operations
9. Anand - Ahmedabad Baroda Expressway 6 NHAI Operations
10. Audha - Ahmedabad Baroda Expressway 4 NHAI Operations
11. Vasad Toll Plaza (NH – 8) 6 NHAI O & M
12. Manglej Toll Plaza (NH – 8) 8 NHAI O & M
Our Experience
S. No Name of PlazaNumber of
LanesClient Scope of Work
13. Chalthan Toll Plaza (NH – 8) 8 NHAI O & M
14. Bhagwada Toll Plaza (NH – 8) 12 NHAI O & M
15. Samakhiyali Toll Plaza (Gujrat) 8 NHAI Operations
16. Palwal Toll Plaza (NH – 2) 12 NHAI O & M
17. Moradabad Toll Plaza (NH – 24) 12 NHAI O & M
18. Katoghan Toll Plaza (NH – 2) 4 NHAI O & M
19. Varanasi Toll Plaza (NH – 2) 8 NHAI Operations
20. Jaipur GVK Expressway (BOT) NH – 8 12 GVK O & M
21. Kishangarh GVK Expressway (BOT) NH – 8 12 GVK O & M
22. Barabanki Toll Plaza (Lucknow) 6 NHAI Operations
23. Mahuvan Toll Plaza (NH – 2) 12 NHAI O & M
24. Pune Paud Toll State Toll BOT 4 HCC Operations
Our Experience
S. No Name of PlazaNumber of
LanesClient
Scope of Work
25. DS Construtions Km 24 (NH – 8) 32 DSC Operations
26. DS Construtions Km 42 (NH – 8) 16 DSC Operations
27. Dasna Toll Plaza ( NH - ) 8 NHAI O & M
28. Baretha Toll Plaza (NH – 2) 6 NHAI Operations
29. Bhiladi Toll Plaza (NH – 14) 8 NHAI Operations
28. Baretha Toll Plaza (NH – 2) 6 NHAI Operations
29. Bhiladi Toll Plaza (NH – 14) 8 NHAI Operations
30. Varahi Toll Plaza (NH – 15) 8 NHAI O & M
31. Madetha Toll Plaza (NH – 15) 8 NHAI Operations
32. Murena Gwalior Toll Plaza (NH – 3) 4 NHAI Operations
Integrate Parking, Access, Security & Revenue Control
for Small, Medium and Large Installations
BE Toll Management System
Security
Special Features
Reports
Internet Accessibility
Main Modules of Toll Management Software
Security
Role based accessibility
Encrypted password management
User rights management
User based interface view
Special Features(1)
Supporting multiple database systems
Role based accessibility
Supporting two types of user display
Advertisements (Display advertisement in free time)
Shift management
Supporting several types of passes/cards
Support Tally Accounting software
Barcode scanner/ Smartcard reader/RFID Tags reader
Configurable lane
Configurable look and feel
Offline Work capability
Online reports
Biometric Enabled (For login to the system)
Special Features(2)
Internet Accessibility
Reports can be viewed through Web Interface using internet from any
Geographic Location.
Method of Payments (MOP)
Cash
Daily pass (Paper slip)
Monthly pass (Smart card/RFID Tag)
Customized pass (Smart card/RFID Tag)
Exempted pass (Paper slip)
Vehicle Classes
Car / Jeep / Van
LCV
Bus/Truck
MAV(>2Axle)including earth moving equipments and Heavy construction Machinery
System Performance (in terms of time)
Semi automatic toll lane (Cash) 300 vehicle/hour
Automatic Toll lane (with smart Card) 400 vehicle/ hours
Electronic Toll Collection (with RFID Tag) 1400 vehicle / Hours
Toll Plaza Architecture
Office Computer
Server
Lane 1 Booth
Lane 2 Booth
Lane 3 Booth
internet
Web Interface (admin reports / top-up recharge)
Toll Plaza Complex
System Architecture and Configuration
Lane Computer
Printer
Camera
Exit Loop
Barrier
TrafficSignal
RFID Reader
Smart Card Reader
BarcodeScanner
Lane Signal
Presence Loop
Veh
icle
To serve through LAN
Monthly Fee statements
Weekly traffic census
Weekly report for weigh Stations
Revenue Report
Traffic Count Report
AVC accuracy report
Discrepancy Report
Operator Efficiency Report
Daily Pass Report
Exempt Report
Reports
Hardware Integration
1. Automatic Boom Barrier
2. IP Based Camera
3. Thermal Printer
1
2
3
Hardware Integration
4. Barcode Scanner
5. User Fare Display (UFD)
6. Liquid Crystal Display (LCD) Panel
4
5
6
7. Overhead Light Signal (OHLS)
8. Traffic Lights
9. Touch Screen
10. Cash Drawer
Hardware Integration
7
8
9
10
Equipments – Control Centre
Central Database Server
Backup Server
Workstation Computer
Smart Card Reader/Writer
Printer
System Integration
Hardware Installation
Software Installation – Fast and Easy
Database Installation
Lane Configuration
Why BEHPA
A Dedicated Inhouse Team of Professionals.
Only Indian Highway/Parking Management Company to have offices in US and Europe
International Tie-ups and Accreditations
Strong Relations with NHAI
Strong Liaison Network (Police, Civil Administration, Media, Politicians etc.)
Strong Infrastructure
Financially Sound
100% Compliances (No Dues till Date)
PAN India Presence
Trained & Certified Professionals
State-of-art Communication & IT Infrastructure
CONTACT US
BE Highway & Parking Automation1, Mini Market,
Near Nanakpura Gurudwara,Motibagh, New Delhi – 110021
Call at: 011-24677478
.. Thank You ..