    1/60

    Vacuum Dewatered Flooring

    Mr. Kandavel Raja P

  • 8/8/2019 Miscellaneous Works- Kvel

    2/60

    Vacuum Dewatered Flooring

    Its a special type of concreting in which water is expelledfrom concrete which reduces the capillary pores and

    increases the early strength of the concrete. This process

    of expulsion of water from concrete increases its density,water impermeability & resistance to abrasion. This process

    of concreting used in industrial flooring, parking areas etc..

  • 8/8/2019 Miscellaneous Works- Kvel

    3/60

    Vacuum Dewatered Flooring

  • 8/8/2019 Miscellaneous Works- Kvel

    4/60

    TOOLS AND EQUIPMENTS

    Trowels Leveling Trowels

    Straight Edge Sprit Level

    Dumpy Level Measuring Tape

    Gum Boot Hammer

    Wheel Barrow Guide channel

    Vacuum Dewatering machine

    Suction mat & Filter pad

    Power Trowel

    Floor Vibrator / Vibrator

  • 8/8/2019 Miscellaneous Works- Kvel

    5/60

    SAFETYTOOLS

    Hand Gloves Concrete Boots

    Industrial Pins

  • 8/8/2019 Miscellaneous Works- Kvel

    6/60

    VDF Concrete Preparatory works

    All the latest GFC drawings should be available.

    Different Levels for Soil, Soling & PCC has to be worked out

    based on the slope if any and marked in all the columns for

    reference.

    Incase of Backfilled soil, the surface should be compacted

    layer by layer so that it can take further load without failure

    Ensure the proper consolidation of the sub grade.

    Electrical / Plumbing Lines to be laid & Checked.

  • 8/8/2019 Miscellaneous Works- Kvel

    7/60

    VDF Concrete Preparatory Works

    Soling has to be laid as required and filled with Quarry Dust

    A layer of LDPE Sheets is to be provided over the sub grade

    and then PCC of thickness as per drawing is laid and cured for

    min 3 Days

    This PCC Creates a leveled sub strata which will facilitate easy

    and proper laying of reinforcement works.

  • 8/8/2019 Miscellaneous Works- Kvel

    8/60

    VDF Concrete Preparatory Works

    Expansion Joints to be provided at the junction of existing

    structure like columns, Retaining walls etc..

    It has been to provided to allow the VDF concrete to work

    Structural Expansion joint is also to be provided

  • 8/8/2019 Miscellaneous Works- Kvel

    9/60

    VDF Concrete Preparatory works

    In case of any openings / Drains, Angles or Krebs

    withA

    ngles has to be placed.Execution plan has to be made considering of vehicle

    movement, avoid more preparatory works.

  • 8/8/2019 Miscellaneous Works- Kvel

    10/60

    VDF Concrete Execution

    PCC Area should be cleaned & free from soil particles

    It has been suggested a LDPE Sheets to be provided over the

    PCC surface based on site condition.

    Reinforcement has to be placed with Cover blocks as per

    drawings.

    Button Marks / Bull fixing has to be done at required intervals.

    Guard rails / Channels has to be placed rigid at the sides of the

    bays keeping the top at required Finish level.

    Shuttering has to be done to avoid slurry leakages.

  • 8/8/2019 Miscellaneous Works- Kvel

    11/60

    VDF Concrete Execution

  • 8/8/2019 Miscellaneous Works- Kvel

    12/60

    VDF Concrete Execution

    Specified grade of concrete has to be poured with the slump of

    100mm 10mm.

    Cube Samples to be taken as per BIS Norms

    Concrete has to be leveled & Compacted by using Pocker / Needle

    Vibrators. Compaction is very essential especially at the edges of the

    bays

    Essential to combine this vibration with surface/ screed vibration.

    The Dewatering Process Starts immediately after surface

    vibration.

  • 8/8/2019 Miscellaneous Works- Kvel

    13/60

    VDF Concrete Execution

    Vacuum equipment comprising of 3 equipment, Suction mat

    top cover, Filter Pad & Dewatering Pump.

    Filter Pads are placed on the Fresh Concrete leaving about 4

    inches of concrete exposed on all the sides.

    The Top cover is then placed on the Filter pads and rolled out

    till it cover the strip of exposed concrete on all sides.

    The Top cover is then connected to the Dewatering Pump

    through a suction hose and the pump is started.

  • 8/8/2019 Miscellaneous Works- Kvel

    14/60

    VDF Concrete Execution

  • 8/8/2019 Miscellaneous Works- Kvel

    15/60

    VDF Concrete Execution

    The dewatering operation takes approx. 1 min per centimeter

    thickness of the Floor.

    The Dewatered concrete is compacted and dried to such an extent

    that it is possible to walk on concrete without leaving any footprints.

    Finishing Operation will be done by using Floating Disc. This ensures

    after mixing the sand & Cement particles, further compaction & closing

    the pores on the surface.

    Trowelling is done with trowelling blades in order to further improve

    the wear resistance, minimize dusting & obtain Smoother Finish.

  • 8/8/2019 Miscellaneous Works- Kvel

    16/60

    VDF Concrete Execution

    Finishing Operation will be done by using Power Floating

    It comprises two steps

    Power Float Disc. This ensures proper leveling, further compaction &

    closing the pores on the surface.

    Power Troweling is done with troweling blades in order to further

    improve the wear resistance, minimize dusting & obtain Smoother/

    Mirror Finish.

  • 8/8/2019 Miscellaneous Works- Kvel

    17/60

    VDF Concrete Execution

    Loading or Stepping on

    concrete should be avoided,

    before initial set of finished

    concreteTouch up with mortar should

    be avoided which will be peal off

    as and when it is loaded

    Heavy Vibrations should beavoided in the vicinity of the

    VDF Area

  • 8/8/2019 Miscellaneous Works- Kvel

    18/60

    VDF Concrete Grooves on the Floors

    A Groove of 3mm thick &

    60mm deep has to be made on

    the Floor

    It should be made after 10 hrsor before 48 hrs of finishing.

    The grooves at internal can be

    left open & External has to be fill

    by bitumen.It Acts as an Expansion Joint /

    Control Joint

  • 8/8/2019 Miscellaneous Works- Kvel

    19/60

    VDF Concrete - Benefits

  • 8/8/2019 Miscellaneous Works- Kvel

    20/60

    VDF Concrete - Benefits

  • 8/8/2019 Miscellaneous Works- Kvel

    21/60

    VDF Concrete - Benefits

  • 8/8/2019 Miscellaneous Works- Kvel

    22/60

    VDF Concrete Benefits

    Through the vacuum treatment, it is possible to reduce the water

    content in the concrete by 15 25% which greatly increases the

    compressive strength.

    Thus, by lowering the water/ cement ratio, the tendency of

    shrinkage and subsequent cracking is greatly reduced.

  • 8/8/2019 Miscellaneous Works- Kvel

    23/60

    VDF Concrete Benefits

    Thus by removing excess water from concrete, the concrete attains

    its high density which results greater durability compared to the

    ordinary concrete.

    The operational convenience offers, can be very simply put as

    pouring concrete having higher water/ cement ratio giving excellent

    workability and removing the excess water immediately after surface

    vibration, resulting in a zero slump concrete.

  • 8/8/2019 Miscellaneous Works- Kvel

    24/60

    VDF Concrete Benefits

    Saving in cement since the compressive strength of the pavement is

    increased giving flexibility to adopt either leaner mix or design a slab

    of lesser thickness giving the required strength.

    Very high output exceeding 100 200 sq. meters. in a day (depending

    upon the configuration of Vacuum De watering System and other site

    conditions like concrete mixing and pouring speed).

  • 8/8/2019 Miscellaneous Works- Kvel

    25/60

    VDF Concrete Benefits

    Single panel without joints up to 100 sq. meters. (depending on

    design specifications)

    Very high splitting strength.

    Monolithic, Shrinkage free pavements.

    Controlled and uniform surface finish.

  • 8/8/2019 Miscellaneous Works- Kvel

    26/60

    26

    Finished surface of VDF

  • 8/8/2019 Miscellaneous Works- Kvel

    27/60

    27

    EQUIPMENTS

  • 8/8/2019 Miscellaneous Works- Kvel

    28/60

    28

    Check List for on - site Inspection

    Sl

    NO

    ITEM YES NO Remarks

    1.

    2.

    3.

    4.

    5.

    .

    Name, date and number of the

    drawing

    PRE - VDF CHECKS

    Has the surface been cleaned,

    rammed and well compacted?

    Have the guiding channels been

    placed according to the vibrator plate

    length?

    Are the guiding channels rigid?

    Has the slope been maintained as per

    the requirements?

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

  • 8/8/2019 Miscellaneous Works- Kvel

    29/60

    29

    6.

    7.

    8.

    9.

    10.

    11.

    12.

    13.

    Are the required tools available?

    CHECKS DURING VDF

    Is the concrete as per design mix?

    If the area is too large ,has it been dividedaccordingly, to do concreting alternatively?

    Has the concreting been done evenly and

    leveled with vibrating machine?

    Has the sucking mat been spread evenly to

    facilitate maximum withdrawal of water?Is the pump pressure maintained constant

    throughout?

    Has the sucking mat been spread evenly to

    cover any undulations?

    Has the floating started immediately afterspreading of mortar?

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

  • 8/8/2019 Miscellaneous Works- Kvel

    30/60

    30

    14.

    15.

    16.

    17.

    18.

    Has the floating been done evenly?

    Has the drying process been done along with

    Floating to get a mirror finish?

    POST-VDF CHECKS

    Has curing been done ,either with a curing

    compound or7 days of curing?

    Have the guiding channels been removed

    carefully without damaging edges of concrete

    after24 hours?Is the finished floor, level?

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

  • 8/8/2019 Miscellaneous Works- Kvel

    31/60

    31

    MESH FIXING

  • 8/8/2019 Miscellaneous Works- Kvel

    32/60

    32

    Have you ever noticed a crack in between the door

    Frames & the Masonry / concrete walls?

    WHY?

  • 8/8/2019 Miscellaneous Works- Kvel

    33/60

    33

    DEFINITION & PURPOSE

    Due to different coefficients of thermal expansion of

    concrete and block masonry, cracks may develop at their

    junction, after plastering is completed. This can beprevented by fixing GI expanded metal rolls (rhombus

    shaped mesh) of desired width over these junctions.

  • 8/8/2019 Miscellaneous Works- Kvel

    34/60

    34

    S/N NAME USE

    1. Hammer To drive the nails into the walls

    2. Masons trowel To apply mortar on the expanded

    mesh.3. Safety goggles To protect the eyes from flying

    debris

    4. Safety gloves To protect the hands during nail

    fixing5. Measuring tape To measure any distance

    6. Hammer drilling machine

    To drill holes in concrete elements

    Expanded Metal Fixing - Tools

  • 8/8/2019 Miscellaneous Works- Kvel

    35/60

    35

    1. Hammer 2. Mason Trowel

    Expanded Metal Fixing - Tools

  • 8/8/2019 Miscellaneous Works- Kvel

    36/60

    36

    3. Safety goggles 4. Safety Gloves

    Expanded Metal Fixing - Tools

  • 8/8/2019 Miscellaneous Works- Kvel

    37/60

    37

    5. Measuring Tape 6. Hammer Drilling

    Machine

    Expanded Metal Fixing - Tools

  • 8/8/2019 Miscellaneous Works- Kvel

    38/60

    38

    PROCESS

  • 8/8/2019 Miscellaneous Works- Kvel

    39/60

    39

    1.Nail rhombus mesh rolls over the blockwork and

    concrete junctions with steel nails/ wooden plug and

    nails.

  • 8/8/2019 Miscellaneous Works- Kvel

    40/60

    40

    2. This strip has to be plastered and cured for minimum of 3

    days before the entire wall is plastered.

  • 8/8/2019 Miscellaneous Works- Kvel

    41/60

    41

    3. fixed over the junction with 1 lay wise nails & GI washer

    of20

    mm round of1mm thick.

    The nails shall be driven into the RCC beams/columns after

    drilling a hole and over brick/block masonry directly. The nails

    shall be staggered and folded to secure the mesh reinforcement.

  • 8/8/2019 Miscellaneous Works- Kvel

    42/60

    42

    4. Cement mortar 1:3 proportion shall be laid over the mesh to a

    thickness to curb the mesh and not exceeding plastered wall

    thickness and imprint shall be made over it to create bond withthe plastering to be done. This will be cured for three days prior

    to commencing plastering.

  • 8/8/2019 Miscellaneous Works- Kvel

    43/60

    43

    INSPECTION METHODOLOGY

    Ensure metal meshes are properly stretched and nailed

    with GI square washer, with sufficient overlap.

    Plastering on these surfaces to be done precisely with

    no protruding surface/edgesEnsure right width of plastering mesh has been used

    depending On the height of adjustor course.

    Establish if proper curing has been done.

    Inspection to be done at the joints to ensure no cracksat joints/plaster..

  • 8/8/2019 Miscellaneous Works- Kvel

    44/60

    44

    INSPECTION METHODOLOGY

  • 8/8/2019 Miscellaneous Works- Kvel

    45/60

    45

    INSPECTION METHODOLOGY

  • 8/8/2019 Miscellaneous Works- Kvel

    46/60

    46

    Check List for on - site Inspection

    Sl NO ITEM YES NO Remarks

    1.

    2.

    3.

    4.

    Name, date and number of the

    drawing

    PRE - EXECUTION CHECKS

    Has the area been prepared forexecuting the work?

    Has the packing between beam

    /column and top most level of

    blockwork complete?

    Has hacking been done on the beam?

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

  • 8/8/2019 Miscellaneous Works- Kvel

    47/60

    47

    5.

    6.

    7.

    8.

    9.

    10.

    Is the mesh of the required size and

    thickness?

    Are the required tools and safety equipments

    (scaffolding) available?CHECKS DURING EXECUTION

    Is the mesh evenly distributed between the

    beams and blockwork?

    Is the mesh provided throughout the length of

    the wall?If Overlapping has to be done, has an overlap

    of 10cms been provided?

    POST-EXECUTION CHECKS

    Is the mesh rigid?

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

  • 8/8/2019 Miscellaneous Works- Kvel

    48/60

    48

    CORNER BEAD FIXING

  • 8/8/2019 Miscellaneous Works- Kvel

    49/60

    49

    Corner beads are fixed at all exposed edges of walls where

    plastering is to be done. It helps to protect the corner from

    breaking or chipping off due to minor impacts.A

    lso, itgives a good finished surface after plastering and painting.

    CORNER BEAD FIXING

  • 8/8/2019 Miscellaneous Works- Kvel

    50/60

    50

    TOOLS AND EQUIPMENTS

    S.N NAME USE

    1. Masons Trowel To apply the mortar for the corner beads

    2. Spirit level To check the verticality of the corner bead after they arefixed.

    3. Measuring Tape For distance measuring purpose

    4. Plum bobs To check the verticality of the corner bead after they arefixed.

    5. Aluminium straightedge

    To check the straightness of the corner bead.

    6. Measurement box To measure the quantities of aggregates on volumetricbasis

    7. Spade For mortar mixing

    8. M S Sheet For mortar mixing

  • 8/8/2019 Miscellaneous Works- Kvel

    51/60

    51

    CORNER BEAD

  • 8/8/2019 Miscellaneous Works- Kvel

    52/60

    52

    PROCESS

  • 8/8/2019 Miscellaneous Works- Kvel

    53/60

    53

    Metal corner beads to befixed before internal

    plastering to maintain

    vertical levels.

    CORNER BEAD

  • 8/8/2019 Miscellaneous Works- Kvel

    54/60

    54

    Corner beads shall be initially

    fixed over plaster dabs in

    neat cement plaster paste

    on both sides of the

    corner bead. Place the

    straight edge against both

    sides of the bead to checkthe straightness .Also

    Plumb bob shall be used

    to ensure vertical plumb.

    CORNER BEAD

  • 8/8/2019 Miscellaneous Works- Kvel

    55/60

    55

    The curved edge of the bead should project the finished surface ofplaster slightly to form a smooth external curve . After completingthe alignment after 48 hours of curing the bead shall be filled with 1:2cement sand mortar ,and cured for 3 days

  • 8/8/2019 Miscellaneous Works- Kvel

    56/60

    56

    INSPECTION METHODOLOGY

    Ensure the corner bead is inplumb, use spirit levels andplumb bob along with bull

    marking.

  • 8/8/2019 Miscellaneous Works- Kvel

    57/60

    57

    Ensure the corner bead is

    well packed with absolutely

    no gaps.

    Ensure the Cement Mortar is

    cured for min 3 days

    Ensure the Corner bead is

    flawless with no cracks or

    dents around the installed

    bead.

    INSPECTION METHODOLOGY

  • 8/8/2019 Miscellaneous Works- Kvel

    58/60

    58

    CheckList for on - site Inspection

    SlNO

    ITEM YES NO

    Remarks

    1.

    2.

    3.

    4.

    Name, date and number of thedrawing

    PRE - EXECUTION

    CHECKS

    Has the area been prepared forexecuting the work?

    Has the bull marking been done?

    No damages on the cornerbeads?

    [ ]

    [ ]

    [ ][ ]

    [ ]

    [ ]

    [ ][ ]

  • 8/8/2019 Miscellaneous Works- Kvel

    59/60

    59

    5.

    6.

    7.

    8.

    9.

    10.

    11.

    Is the block work at right angles?

    Are the required tools and safety equipments

    (scaffolding) available?CHECKS DURING EXECUTION

    Is the corner bead plumb?

    Is the packing between corner beads and

    blockwork done with rich cement mortar 1:2?

    POST-EXECUTION CHECKSIs the button mark and corner beads in line

    and at right angles?

    Has curing been done for 3 days?

    Are the corner beads rigid?

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

    [ ]

  • 8/8/2019 Miscellaneous Works- Kvel

    60/60

    60