Minutes of meeting held on the 20thJanuary 2014
Date 20th
January 2014Time 2pm4pm
Meeting The meeting was organised by the project manager (Utsav Dhakal)
Present Client: Harith Mbos
Senior Manager: Dean Walker
Peer reviewer x2- Daniel Coutinho, Abraham Smith
End User x2- Tomas Taujanskas, Abimbola Osidele
Subject Handover and Final Review
Agenda Item (number) Details of Notes from meeting
Apology All members of the meeting were able to attend the meeting on
time, so it wasnt applicable to anyone else as everyone else was
on time so the meeting went smoothly without any interruption.
Matters arising The product and the user guides have now been completely
finished and the project is drawing to a close with this and the
final last meeting so there are no matters that arose at this point
in time so the Project Manager asks all members of the meeting if
there are any matters arising but there is a response of a
unanimous no.
Handover Presentation In this section of the meeting the Project Manager(Myself)
showed all members including the Client the final completed
Multimedia Product Hp Laptop flash product and the two user
guides (Technical and Novice). I presents the multimedia on an
interactive white board showing all members the multimedia
product going through every single page and showing every
interactive feature that it has, for all members to see for the first
time together, I then passed the interactive pen round so that all
members could have a brief experience of navigating and using
the product. The project then explains every stage of the
development and ever motion tween, button and multimedia
aspect that I had kept into the product referencing the feedback
they was given to me in the various different emails and meetings
showing how each stakeholder helped me shape and form this
final product. Once every member of the meeting have had a brief
go of using the multimedia product including the end users I thenhanded out a printed copy of the Novice guide to each and every
-
8/12/2019 Minutes7 (Handover)
2/3
Minutes of meeting held on the 20thJanuary 2014
member of the meeting reading out load what it said, when I
finished reading the Novice guide I then did the exact same thing
for the Technical guide reading out load step by step how I was
able to use action script to enhance the multimedias interactivity.
After showing all members of the meeting the all of the
deliverables I then asked if they had any questions, and everyone
agreed that they did not have any questions and they could
continue to the next stage of the meeting.
Final Review This section is the main purpose of the meeting focusing on the
subject of the meeting the final review of the Multimedia
Product, the subject of the meeting was based on the review of
both the project throughout the entire time from the initial
brainstorm to the final testing of the final product covering all
areas of development and also all methods of communicationoutside of meetings, the second area that is being reviewed and
the main purpose of this meeting is the final multimedia product.
The review is to see how well the Stakeholders preformed their
roles in the project most importantly focusing on how well the
product was carried out by the Project Manager (Myself),
additional to this the review will highlight the resources used and
whether or not they were the correct resources to used and
whether or not they were used to their maximum potential. I
started the final review by presenting the final version of the
product. This way they all would be able to navigate around the
multimedia product one last time so that they will have clear
evidence of what to review. I then gave a final explanation of the
product for each of the members around the product showing
every detail of every page and also showing them the final
deliverable of the project. I talked on brief on basic technical user
guide of how to install. During the process of talking I showed
everyone how I was able to uses action script to create more
interactive features in the multimedia product.
After this section of the meeting took place the I then proceeded
to the topic of reviewing the entire project the main purpose of
the meeting, to being this the Client (Harith Mbos) firstly handed
out to all the stakeholders a copy of the evaluation of our
performance, explaining to all the members of the meeting that
this was an overall evaluation of the product as well as my
performance throughout the project.
The Senior Manager was the last to give his comments of the
overall review of the project. After all members of the meeting
had given their views of the Project Manager and the project as a
-
8/12/2019 Minutes7 (Handover)
3/3
Minutes of meeting held on the 20thJanuary 2014
whole the last section of the meeting was to discuss any possible
improvement that could be made if they were to redo this course,
it was agreed that all members of the meeting thought that too
much time was spent on the design production stage and perhaps
they should have just done all of the product designs should have
been made in two meetings and by them working together it
would cut out the need for email communication and reduce the
time spent on the product design stage by a significant number of
weeks and then that time could be spent on the implementations
on flash or even finishing the project before the deadline time.
Thank you statement I thank all the stake holder on the success of the project. All their
hard work was not missed out each and every feedback was taken
into consideration and I kindly respect on their contribution and
input towards the project to make it a huge success.