MINUTES OF THE CUSTOMER INTERACTION MEETING HELD AT ICF ON 29TH
AND 30TH
OF APRIL 2014
Members Present
ICF ZONAL RAILWAYS RITES LTD/RDSO
1 Pankaj Kumar CME 1 R Manimaran Dy.CME/HQ/SR 1
Anil Kumar Jain
P Suresh GM/RITES/Southern
Region 2 S G Hundekari CEE 2 M A Rafeeq Dy.CME/C&W/SC/SCR
3 L C Trivedi CPM 3 S Ramachnadran SME/C&W/HQ/SR 2 Anil Kumar
Jain
GM/RITES/Southern
Region 4 N K Toppo CME/QA 4 Sanjay Kumar CDO/BBS/ECoR
5 S Srinivas CDE/Mech 5 Uday Kumar CDO/DBG/ECR 3 P K Srivastava Dy.Direction/RDSO
6 S P Vavre CDE/Elec 6 P K Singh CDO/JBP/WCR
7 S K Paswan CWE/S 7 R K Sharma CDO/JP/ADI/NWR
8 K S Jain CWE/F 8 Rakesh Chandra CDO/LKO/NR
9 R Veerasekaran Dy.CME/Design-II 9 Sudhangshu Mallik CDO/MFP/ECR
10 M E Srinivasan Dy.CME/Fur 10 S M Sakil Ahmed CDO/VSKP/ECoR
11 P Sivaraman Dy.CME/Bogie 11 R T Selvam ACMT/PL/WR
12 D Neelakantan Dy.CME/Design-I 12 Chandra Bhan ADME/C&W/GKP/NR
13 S Rajendran Dy.CME/QC 13 M Vamsikanth ADME/HQ/TVC/SR
14 P K Patnaik ADME/Santragachi/SER
15 Alam AWM/KGPW/SER
16 E Sundaramurthy SSE/C&W/HQ/SR
17 B Srinivas SSE/C&W/SCR
18 Suresh Kumar SSE/Chg/AGC/NCR
19 Anil Kumar SSE/NR
20 A K Shukla SSE/NR
21 P Ravindran SSE/TVC/SR
![Page 2: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/2.jpg)
![Page 3: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/3.jpg)
1
Reporting Railways SWR/Aug'13, CR/Aug'13, SWR/Jan'14 Type of
Coaches/Major
Assy./Specific Item
All Types/Side Buffer
Brief Account of
Problem
Buffer face plate wears out frequently and spindle rod rotates
freely. Cases of buffer casing /socket crack are very high
Action taken/Drawing
No.
New specification is made in line with specification for axle box
housing. New specification ICF/ MD/SPEC-252 Dt. 10-08-2013 has
been issued with the following salient features: Material has been
upgraded to IS 1030-98: 230-450W which has higher mechanical
properties. Radiography test on 10% of buffers of each batch
offered for inspection. Ultrasonic test on 100% of buffers of each
batch offered for inspection. Destructive test on 2% of buffers of
each batch offered for inspection to examine casting defects like
porosity, blow holes, shrinkage, slag inclusion etc.
Implementation status
of the modification in
the coaches
All new supplies are as per this specification. 200 Nos. of Side
Buffers are received as per new specification
Minutes of the
Meeting April 2014
Advice to all rlys to adopt this new Spec.- Already advised as per
CDE.
WR- insufficient Heat treatment is the main reason for the cracks –
Temp and timing not maintained properly. Should be of 100%
pearlite structure.
RITES – RDSO DRG. Covers all the 3 parameters- testing are being
done as per RDSO DRG and ICF spec.
RLYS – Jagadamba quality is very poor.
CME instructed CDE to review all the vendors including testing
facility of the vendor.
CME asked Rlys to maintain vendor-wise records, analysis the
failure vendor-vise / where the failure occurred.
Feedback to be given to ICF, RDSO & RITES.
Remarks ---
![Page 4: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/4.jpg)
2
Reporting Railways SR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
ALL/Door
Brief Account of
Problem
The main doors of 2010 year built coaches are getting corroded
prematurely in the first POH itself.
Action taken/Drawing
No.
A proposal to switch over to Stainless Door for FAC is under
vetting. Tender for Stainless Door for Non-AC Coaches has been
finalized.
Drg. No. 140-5-1-021 Dt.22/10/2010 – For Non-AC Coaches
Drg. No. 329-5-1-030 Dt.05/03/2014 – For AC Coaches
Implementation status
of the modification in
the coaches
Tender under Finalization.
Minutes of the
Meeting April 2014
CPM -> No FRP doors to be used.
CWE/S-> 50% of Non AC this year, within next year 100% SS doors.
CDE-> asked to ensure proper fitment.
CDO/VSKP-> pivot failure due to corrosion of Z angle is the main
reason for door failure.
Remarks ---
![Page 5: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/5.jpg)
3
Reporting Railways SWR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
First AC/Furnishing/Ladder
Brief Account of
Problem
In First AC, top climbing ladder is not convenient. After the second
step, the passenger is required to turn and sit on the berth. The
ladder position is to be changed to a convenient location.
Action taken/Drawing
No. Prototype Staircase type footstep has been approved.
Implementation status
of the modification in
the coaches
Prototype is under Trial.
Drawing is under issue, PDC June 2014.
Minutes of the
Meeting April 2014
CME desired that this should be expedited and the first coach to
be shown to him with this new type of staircase.
Dy CME DESIGN- 1 No, ready - to be approved.
Remarks ---
![Page 6: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/6.jpg)
4
Reporting Railways CR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
WCB/Flooring
Brief Account of
Problem
Seepage of water from kitchen area over battery box and air brake
components leading to corrosion of under frame and it mountings
Action taken/Drawing
No.
Sloped flooring with trench provided vide Drg.No. WCB 4-4-1-401
alt ‘r’ dt.11-10-13 has been issued.
Implementation status
of the modification in
the coaches
Implemented from November 2013 (Shell No. WCB 490 onwards)
Minutes of the
Meeting April 2014 --
Remarks --
![Page 7: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/7.jpg)
5
Reporting Railways SR/Aug’13, SCR/Aug’13, CR/Aug’13, SWR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
All/Flooring
Brief Account of
Problem Defects on pasting of PVC floor sheets in toilet area.
Action taken/Drawing
No.
An alternate material like Polymerized PVC flooring as per RDSO
Specn. C-9704-1997 has been tried.
Implementation status
of the modification in
the coaches
Implemented in FAC coaches in February 2014 as a trial measure.
Another 10 Coaches will be tried In the first week of May 2014.
Minutes of the
Meeting April 2014
Process to be out-sourced.
Rly- peeling gives ugly look.
Decision- All AC coaches will be of polymerized lav floor
Remarks ---
![Page 8: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/8.jpg)
6
Reporting Railways SR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
All Types/Modular Toilet
Brief Account of
Problem
Renewal of sole bar / head stock causes lot of difficulties in
modular toilet coaches and FRP inlay coaches.
Action taken/Drawing
No.
Decision has been taken to provide SS Modular toilets in all AC
Coaches as per the minutes of meeting for the implementation of
stainless steel modular toilets in FAC (20-Berth), ACCW and ACCN
coaches held on 02/07/2013 at CWE/Fur/Conference room.
Drg.Nos. 524-6-3-202, 524-6-3-203, 524-6-3-204, 524-6-3-205,
524-6-3-206 – Feb 2012.
Implementation status
of the modification in
the coaches
Implemented
Minutes of the
Meeting April 2014
Feedback reg. SS modular toilet is required from Rlys.
Rlys-> SS is better. But plumbing is difficult.
Dy Design- Al. composite pipe is being used, so, chances of leak are
very less.
CDO shakkel. ->LHB Taps are prone to theft. 70% of taps are
missing during first run. Rlys do not have spares. Vendors are not
suppling small quatity.
Dy Design asked the Rlys to furnish their qty of requirement, so
that ICF can combine the requirement with ICF requirement.
Rlys->Gravity cock is good.
Remarks ---
![Page 9: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/9.jpg)
7
Reporting Railways SCR/Aug'13, CR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
AC & Non-AC Sleeper Coaches/Lavatory/Lav. Inlay
Brief Account of
Problem Stagnation of water in Toilets
Action taken/Drawing
No.
Additional pressing is given in the inlay to minimize the drumming
effect there by reducing the chances of water pockets. Drawing
has been issued vide drawing No.ICF/STD-4-1- 011 alt ‘e’ dt.11-12-
13.
Implementation status
of the modification in
the coaches
Improved design has been cut in from the existing order of M/s.
Costal Steels and the firm has supplied 100 Nos. Fitment in
progress. Future procurement will be with improved design.
Minutes of the
Meeting April 2014
Rly wanted the cut-in date for new inlay.
CDE-> integrated support from bottom of the with inlay and
antiskid tiles above inlay are in design anvil.
Remarks ---
![Page 10: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/10.jpg)
8
Reporting Railways SR/Aug ‘13
Type of
Coaches/Major
Assy./Specific Item
NON - AC/Lav Window Assy/Banjo Shutter
Brief Account of
Problem
Banjo shutters in toilets in GS are easily removed by passengers
and toilet is used for travelling.
Action taken/Drawing
No.
Rivet Size increased to Dia 8 mm in the revised Drawing No.077-5-
5-030 alt ‘d’ dt.13-01-14.
Implementation status
of the modification in
the coaches
Will be implemented from 2015-16, through upcoming
procurement cycle after consuming the available stock.
Minutes of the
Meeting April 2014 Cut in date? Dy. FUR agreed for revised rivet size.
Remarks
To be followed by Production/Fur
Vide letter No.MFPL/160/7 Dt.16/05/2014, stores department has
been advised to advice the suppliers to modify the rivet size in the
existing PO Nos.071314651804 and 071314651821.
![Page 11: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/11.jpg)
9
Reporting Railways SR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
All Types/AIR BRAKE/200L AUX. RESERVOIR
Brief Account of
Problem 200L Auxiliary reservoirs are getting corroded in first POH itself.
Action taken/Drawing
No.
Already switched over to SS reservoir vide drg.No.ICF/STD-3-5-065
dated 30-11-09.
Implementation status
of the modification in
the coaches
Implemented
Minutes of the
Meeting April 2014
SR- why 200 ltr, 150 is sufficient.
CDE- Safety related item – advised SR to write to RDSO. Asked to
give calculation.
Remarks ---
![Page 12: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/12.jpg)
10
Reporting Railways SWR/Aug'13, SR/Jan'14
Type of
Coaches/Major
Assy./Specific Item
NON-AC/FURNISHING/DUST BIN
Brief Account of
Problem
Dust bin cover securing arrangement in Non-AC coaches is giving
problem during service.
Action taken/Drawing
No.
ICF has started to provide Stainless steel Dust Bins in place of FRP
in some of the newly turned out coaches. Will be provided in all
the coaches after duly taking care of the stock and dues of the FRP
Dust Bins.
Implementation status
of the modification in
the coaches
Implemented
Minutes of the
Meeting April 2014
Design to be improved with easily cleanable and more volumunues
dust bin design.
FAC also to be provided with dust bins.
Remarks Design to study further.
![Page 13: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/13.jpg)
11
Reporting Railways SCR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
All Types/Air Brake
Brief Account of
Problem
Due to continuous dynamic vibrations, ferrule joints of cut off
angle cocks are getting failed due to leak in en-route and causing
detention to trains.
Action taken/Drawing
No.
Additional support needs to be introduced for securing the cut off
angle cocks, as provided in LHB coaches. Drg. Modified. Drg.
No.329-3-5-031 dt. 12/07/2013 introduced bracket for clamping
the Angle Cock with Headstock. Feedback on the same expected
from Rlys.
Implementation status
of the modification in
the coaches
Implemented from October 2013
Minutes of the
Meeting April 2014
100% implemented.
Nuts to be designed such a way that can be accessed from outside-
Remarks after FUR visit.
Remarks Design to study further.
12
Reporting Railways CR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
All Types/Inlay
Brief Account of
Problem
Single Piece SS Commodes are to be provided as the welded
commodes are getting corroded and working out of Foot Seats.
![Page 14: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/14.jpg)
Action taken/Drawing
No.
ICF is following single piece design vide drawing No.ICF/STD-4-1-
011 alt Nil dated 03-09-2010 Already implemented from 2011
onwards.
Implementation status
of the modification in
the coaches
Implemented
Minutes of the
Meeting April 2014 ---
Remarks ---
13
Reporting Railways CR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
WCB/Partition frame/Partition Mesh
Brief Account of
Problem
Cleaning and maintenance of Partition mesh in aisle of Pantry car
is difficult. Gives shabby appearance.
Action taken/Drawing
No.
Mesh is replaced with tubes vide drawing No.203-1-0-503 alt ‘d’
dated 02-09-2013.
Implementation status
of the modification in
the coaches
Implemented from Nov. 2013 (Shell No. WCB 490 onwards)
Minutes of the
Meeting April 2014 12 shells turned out
Remarks ---
![Page 15: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/15.jpg)
14
Reporting Railways CR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
SGGS/Lavatory/Window
Brief Account of
Problem
Window Glass in GS Lavatory is being damaged by passengers
travelling in lavatory. Existing design of Sealed Window or Two
Piece Frosted glass may be changed to conventional grill and
removable glass in GS/SLR.
Action taken/Drawing
No. ICF design is Banjo type with window bars which is a better design.
Implementation status
of the modification in
the coaches
Implemented
Minutes of the
Meeting April 2014 ---
Remarks ---
![Page 16: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/16.jpg)
15
Reporting Railways SWR/Aug'13, SCR/Aug'13, SCR/Jan'14, SWR/Jan'14
Type of
Coaches/Major
Assy./Specific Item
AC & Non AC Sleeper/Seat & Berth/Backrest
Brief Account of
Problem
There are various type of arrangements provided for securing back
rests in sleeper and AC coaches. Securing arrangement to be
standardized for easy maintenance and positive locking.
Action taken/Drawing
No.
Back rest securing arrangement has been standardized. New
standardized design drawings issued Assembly Drg. No. 201-61-
601 alt ‘t’ Dt. 2/2013 Drg.No. 140-6-1-008 alt ‘f’ Dt.10/2011(For
Backrest lock for transverse berth of AC & Non AC coaches)
Implementation status
of the modification in
the coaches
Implemented from Dec- 2013
Minutes of the
Meeting April 2014 ---
Remarks ---
![Page 17: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/17.jpg)
16
Reporting Railways SCR/Aug'13, SWR/Jan'14
Type of
Coaches/Major
Assy./Specific Item
All Types/LAVATORY/Drain out pipe
Brief Account of
Problem
Wash basin drain out pipe is located just above the BIO tank and
drain water is falling on tanks.
Action taken/Drawing
No.
Design of drain out pipe location modified and implemented.
Drg. No. 140-6-3-084 Dt.05/02/2014.
Implementation status
of the modification in
the coaches
Implemented on 12/03/2014 in First AC (Shell Nos. 120, 119, 121)
Minutes of the
Meeting April 2014 To be implemented in all the coaches
Remarks PDC 21/05/2014
![Page 18: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/18.jpg)
17
Reporting Railways SR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
All Types/Lavatory/Drain out pipe
Brief Account of
Problem
Drain water from lavatory splashes over the Bogie / Under gear
components when the train is in run leading to corrosion
Action taken/Drawing
No.
Elimination of drain holes in pan type lavatory, Implemented vide
drawing No. 140-4-1-011 alt ‘c’ dated 02/2012
Implementation status
of the modification in
the coaches
Implemented from October 2013.
Minutes of the
Meeting April 2014 No further modification required.
Remarks No further modification required.
![Page 19: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/19.jpg)
18
Reporting Railways SR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
All Types/Lavatory/Lav. Chute Fixing Arrangement
Brief Account of
Problem
Lavatory chute securing bolts are getting corroded during service.
It is very difficult to use spanner for dismantling the M12 screws
due to deposit of human waste in the surrounding area. During
POH the bolts are removed by Gas Cutting. After gas cutting the
threaded holes are no more usable.
Action taken/Drawing
No.
Drg No. 077-6-3-483 alt ‘c’ dated 08/2013 is issued with
elimination of tapped holes and introduction of through holes
Implementation status
of the modification in
the coaches
Implemented from October 2013
Minutes of the
Meeting April 2014 ---
Remarks ---
![Page 20: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/20.jpg)
19
Reporting Railways SR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
All Types/Lavatory/Gravity Cock
Brief Account of
Problem
The LP Sheet gets damaged while attending the gravity cock / APD
during POH
Action taken/Drawing
No.
Since pilferage problem is not normally observed, APD for gravity
cock is eliminated vide drawing No. SCN 8-6-3-805 alt ‘a’ dated
09/2013
Implementation status
of the modification in
the coaches
Implemented from December 2013
Minutes of the
Meeting April 2014 ---
Remarks ---
![Page 21: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/21.jpg)
20
Reporting Railways SR/Aug'13 Type of
Coaches/Major
Assy./Specific Item
SLRD/Underframe/Solebar
Brief Account of
Problem Solebar sagging at Luggage area in SLRD coaches
Action taken/Drawing
No.
Thickness of the sole bar is increased from 5mm to 8mm. Drawing
No. SLR2-1-1-252 issued in June 2013
Implementation status
of the modification in
the coaches
Implemented from October 2013. (Shell No. SLRD 828 onwards)
Minutes of the
Meeting April 2014 87 shells turned out till date – CWE/S
Remarks ---
21
Reporting Railways SR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
JS COACHES/Seat/Seat Securing Bolts
Brief Account of
Problem
Seat securing bolts- broken / loose in JS Coaches (Bolted to
compreg sheet only, due to Insufficient length of bolts used
during fitment, 3.15 against 5 mm thickness of back pieces used &
Bolts getting broken during unscrewing due to corrosion)
Action taken/Drawing
No.
Bolt material changed to Stainless Steel. (Specification IS 1367 (P-
14) 1984, A2-70). Revised Drawing No. 253-6-1-201 alt ‘P’ issued
on 13-01-2014.
Implementation status
of the modification in
the coaches
Implemented from Feb 2014.
Minutes of the
Meeting April 2014 ---
Remarks ---
![Page 22: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/22.jpg)
22
Reporting Railways SR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
Non - AC/FDB/FDB Cover
Brief Account of
Problem
Insertion of waste materials into FDB in Non AC Coaches leads to
fire accidents
Action taken/Drawing
No.
FDB cover has been modified by providing angles. Drawing
No.GS5-4-4-501 alt ‘d’ issued on 18-09-12.
Implementation status
of the modification in
the coaches
Implemented from October 2013.
Minutes of the
Meeting April 2014 CPM- All the Rlys are to be intimated by Design.
Remarks
---
23
Reporting Railways SWR/Aug'13 Type of
Coaches/Major
Assy./Specific Item
All /Furnishing/Coach Indication Board
Brief Account of
Problem Indication boards - Brackets to be provided inside the coach.
Action taken/Drawing
No.
Brackets provided vide Drg.No. 140-43-001 Dt.05/2012 for GS/SCN
coaches
Implementation status
of the modification in
the coaches
Implemented from June 2012
Minutes of the
Meeting April 2014 ---
Remarks ---
![Page 23: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/23.jpg)
24
Reporting Railways CR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
All Types/Air Brake
Brief Account of
Problem
PEASD spindle connection with resetting wire rope is with a "Z"
type flat which is getting damaged due to its complicated design.
Action taken/Drawing
No.
Modified design is already implemented vide Drg.No.268-3-5-755
alt ‘c’ dt.01-11-2010. (Bracket Drawing No.ICF/STD-3-5-069)
Implementation status
of the modification in
the coaches
Implemented from 27/05/2012
Minutes of the
Meeting April 2014 ---
Remarks ---
![Page 24: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/24.jpg)
25
Reporting Railways SR/Aug'13, SWR/Aug'13, CR/Aug'13, SWR/Jan'14
Type of
Coaches/Major
Assy./Specific Item
All Types/Bogie Assy/Axle Box Rubbing Pad
Brief Account of
Problem
Bolt and nut of diamond shape modified 'A' dimension pad (crown
clearance) cannot be attended in pit-lines during rake
maintenance if worked out.
Action taken/Drawing
No.
Design modified vide Drawing No.T-0-1-650 alt Nil dt.28-03-13.
Sent to RDSO. RDSO suggested vide their Lr.No.MC/ICF/BD dt.10-
07-2013 for trial fitment in 50 coach sets.
Implementation status
of the modification in
the coaches
Under Procurement ( Demand No. 02/14/2049 - 1600 Nos.
Demand No. 02/14/2050 - 800 Nos.)
Will be implemented from Aug’ 14.
Minutes of the
Meeting April 2014 To be implemented
Remarks CWE/S to give cut in.
![Page 25: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/25.jpg)
26
Reporting Railways SWR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
WCB/Fan Assy
Brief Account of
Problem
Mounting arrangement of Exhaust fan on roof in WCB coaches - to
be reviewed
Action taken/Drawing
No.
The mounting arrangement has been modified vide Drg No. 159 16
401 alt ‘J’ Dt. 07-09-2013
Implementation status
of the modification in
the coaches
Implemented from December 2013 (shell No. WCB 490 onwards)
Minutes of the
Meeting April 2014 ---
Remarks ---
27
Reporting Railways SWR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
SGSCN/Seats & Berths/Seats & Berths
Brief Account of
Problem
Bending/breakage of lower berths of sleeper coaches at the center
portion due to weak structure
Action taken/Drawing
No.
Frame for Transverse seat strengthened with 5 Nos. of ‘Z’ section
numbers instead of 4 Nos. of flats. Drawing No.201-6-1-602 alt Nil
dt.21-11-2002.
Implementation status
of the modification in
the coaches
Implemented
Minutes of the
Meeting April 2014 ---
Remarks ---
![Page 26: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/26.jpg)
28
Reporting Railways CR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
SCN/Seats & Berths/Seats & Berths
Brief Account of
Problem SCN Middle berth hinges to be converted to Pivot Design
Action taken/Drawing
No.
Introduced Pivots in place of Hinges. Drawing No.201-6-1-604
27.02.2013.
Implementation status
of the modification in
the coaches
Implemented
Minutes of the
Meeting April 2014 ---
Remarks ---
![Page 27: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/27.jpg)
29
Reporting Railways SWR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
All Types/Emergency Window
Brief Account of
Problem
Radium type emergency window indication boards may be
provided in all coaches for better visibility in darkness.
Action taken/Drawing
No.
Fluorescent luminous stickers have been provided to indicate the
location of the emergency window. However, drawing will be
issued to provide luminous stickers in the emergency window also.
Implementation status
of the modification in
the coaches
Implemented
Minutes of the
Meeting April 2014 ---
Remarks Drawing to provide luminous stickers in the emergency window is
under issue. PDC June 2014.
30
Reporting Railways CR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
GS, SLR/Luggage Rack
Brief Account of
Problem Rivets fixing wooden planks in luggage racks are getting sheared
Action taken/Drawing
No.
For GS coaches, luggage rack is provided with stainless steel as
against MS with wooden Compreg Plank as per drawing No.LGS-6-
2-001 dated 09/2010.
Implementation status
of the modification in
the coaches
Implemented
Minutes of the
Meeting April 2014 ---
Remarks ---
![Page 28: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/28.jpg)
31
Reporting Railways SWR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
AC Coaches/Furnishing/Emergency Window
Brief Account of
Problem
Emergency glass breaking hammer box may be integrated to coach
body and flush type one instead of existing separate box mounted
on surface of the wall at the entrance
Action taken/Drawing
No. Already implemented
Implementation status
of the modification in
the coaches
Already Implemented
Minutes of the
Meeting April 2014 ---
Remarks ---
32
Reporting Railways SR/Aug'13, CR/Aug’13, SCR/Jan'14
Type of
Coaches/Major
Assy./Specific Item
All Types/Furnishing/Bottle Holder
Brief Account of
Problem
Present nylon wire bottle holder size is smaller. Bottle holder may
be relocated below the snack table.
Action taken/Drawing
No.
The latest Bottle Holder Size is sufficient. Provision of bottle
holder below the snack table drawing is issued (140 64 028 alt ‘a’)
Implementation status
of the modification in
the coaches
Implemented
Minutes of the
Meeting April 2014 ---
Remarks ---
![Page 29: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/29.jpg)
33
Reporting Railways CR/Aug'13, SCR/Aug'13, SCR/Jan'14
Type of
Coaches/Major
Assy./Specific Item
All Types/Furnishing/Magazine Bag
Brief Account of
Problem
Problems in Magazine and Bottle holder fixing. To provide back
pieces of bigger size. Rugged and smooth design is required.
Action taken/Drawing
No.
Back pieces of bigger size are provided for magazine bag and
bottle holder.
Implementation status
of the modification in
the coaches
implemented
Minutes of the
Meeting April 2014 ---
Remarks ---
34
Reporting Railways CR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
All Types/Air Brake
Brief Account of
Problem All brake piping to be modified to seamless pipes
Action taken/Drawing
No. Implemented vide specification No.ICF/MD.Spec.166
Implementation status
of the modification in
the coaches
Implemented from year 2008
Minutes of the
Meeting April 2014 ---
Remarks ---
![Page 30: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/30.jpg)
35
Reporting Railways SR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
All Types/Bogie Assy/Wheel Set Assy
Brief Account of
Problem
The length of Roller bearing end locking screws to be standardized
to 50 mm.
Action taken/Drawing
No. Drg. already issued vide drg. No. WTAC 2-0-2-304 dt.10-11-2010.
Implementation status
of the modification in
the coaches
Implemented
Minutes of the
Meeting April 2014 ---
Remarks ---
36
Reporting Railways SCR/Aug'13, SR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
All/Under Frame/Sole Bar
Brief Account of
Problem
Heavy corrosion of sole bar within 5 years. 11 mm holes provided
in the turn under gets chocked and does not drain water
Action taken/Drawing
No.
Drain Hole size increased to Dia. 50 mm from Dia.11mm. Drawing
No.201-1-4-604 alt ‘b’ 02/12.
Implementation status
of the modification in
the coaches
Implemented from Feb 2014 (Shells on belt - SCN 4242, GS 5831,
SLRD 870)
Minutes of the
Meeting April 2014
Do not compromise quality on account of manufacturing
difficulties / increased productivity. Problems of User Rlys are to
be taken as top priority.
Remarks ---
![Page 31: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/31.jpg)
37
Reporting Railways SR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
All Types/Bogie Assy/BOGIE SIDE FRAME
Brief Account of
Problem
Repeated occurrence of bogie side frame crack at bottom flange &
propagated upwards to web and partially cracked top flange in ICF
/ RCF bogies. Crack is occurring in between the axle box guide &
suspension strap lug.
Action taken/Drawing
No.
The issue addressed by ICF by removing welding of heat affected
zone at suspension strap area. Drawing No.WTAC 3-0-3-402 Dt. 27-
08-03
Implementation status
of the modification in
the coaches
Implemented
Minutes of the
Meeting April 2014 ---
Remarks ---
![Page 32: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/32.jpg)
38
Reporting Railways SR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
All Types/Furnishing/Magazine Bag
Brief Account of
Problem
Material Spec. for SS rod of magazine bag may be revised to
commercial quality.
Action taken/Drawing
No.
Already revised. Drg.140 64 031 Alt ‘c’ Dt 10/2013. Material
modified from AISI 304 to AISI 202 with finish 2B
Implementation status
of the modification in
the coaches
Implemented
Minutes of the
Meeting April 2014 ---
Remarks ---
39
Reporting Railways SR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
JS Coaches/Seat /Non – AC Chairs
Brief Account of
Problem
Aisle width found less by 20 to 50mm as against 450mm Passage
gap between seat pillar on floor is found 630 mm against 674 mm
specified
Action taken/Drawing
No.
One arm rest removed to maintain the specified gap.
Drg. No.329-6-1-036 Alt ‘b’ Dt.24/08/2006.
Implementation status
of the modification in
the coaches
Already Implemented
Minutes of the
Meeting April 2014 ---
Remarks ---
![Page 33: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/33.jpg)
40
Reporting Railways CR/Aug'13, SCR/Jan'14, SR/Jan'14
Type of
Coaches/Major
Assy./Specific Item
Non-AC/Roof/Ventilator
Brief Account of
Problem
Biscuit wrappers, waste papers, tea cups inserted by passengers
into the ventilator grill while sitting on the Luggage rack which can
cause fire accident
Action taken/Drawing
No.
Introduced stainless steel wire mesh as per RDSO
Lr.No.MC/CRN/REH dated 20-09-2012. Drawing No.036-1-6-817 alt
‘e’ 07/2013 issued
Implementation status
of the modification in
the coaches
UL No. 08 30921665 01 01 Under procurement. Tender opened on
24-02-2014
Minutes of the
Meeting April 2014
Cut-in from this month – CWE/S
CDO shakkel-> mesh may clogg
SCR/DME - To be cleaned periodically.
Remarks Production/Shell to ensure.
![Page 34: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/34.jpg)
41
Reporting Railways SR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
All Types/Shell Assy/Footstep
Brief Account of
Problem Premature corrosion in footstep support channel
Action taken/Drawing
No.
Footstep support channel materials changed to Stainless Steel vide
Drawing No.140-2-4-001 alt P dt.18-01-14.
Implementation status
of the modification in
the coaches
Will be implemented from 2014-15, through upcoming
procurement cycle.
Minutes of the
Meeting April 2014 To be implemented
Remarks CWE/S to give cut in.
42
Reporting Railways SR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
All Types/Air Brake/S.S Wire rope for manual release of Distributor
Valve
Brief Account of
Problem
Wire ropes for manual release of distributor valve, getting
corroded and get cut in service
Action taken/Drawing
No.
Bi-metal corrosion at the soldered joint is the reason of failure.
New Drg. No. GS5-3-5-506 alt ‘d’ Dt.21.01.2014 is issued for wire
rope of Stainless Steel with ferrule type joint The mounting
arrangement has been modified vide Drg No. 159 16 401 alt ‘J’
Implementation status
of the modification in
the coaches
Will be implemented from second half of 2014-15, through next
procurement cycle duly taking care the stock and dues.
Minutes of the
Meeting April 2014 To be implemented
Remarks Production/Fur to ensure.
![Page 35: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/35.jpg)
43
Reporting Railways SR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
All Types/Bogie Assy/Shock Absorber
Brief Account of
Problem
Split pins provided on bolt-nut used for fitment of shock absorbers
are either broken or corroded. During POH, it's difficult to
dismantle
Action taken/Drawing
No.
Nyloc Nut instead of Bolt-nut-split pin fitted on 150 Coaches as a
trial measure from Mar. to June 2013. Results found to be
satisfactory.
Implementation status
of the modification in
the coaches
Will be implemented from 2014-15 on regular basis
Minutes of the
Meeting April 2014 To be implemented.
Remarks Drawing under issue, PDC 30/05/2014.
![Page 36: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/36.jpg)
44
Reporting Railways CR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
All/Lavatory/Lavatory Inlay
Brief Account of
Problem
While flushing out, water is coming out of the commode pan and
flowing on the lavatory Vinyl floor.
Action taken/Drawing
No.
New type of wall protector introduced. Additional step has been
introduced in the lavatory inlay to avoid water splashing on the
lavatory floor. Drg. No. ICF/STD 4-1-011 alt ‘e’.
Implementation status
of the modification in
the coaches
Under Implementation
Minutes of the
Meeting April 2014
100 nos. received from M/S Costal Steel, Chennai have been fitted
in the existing coaches.
Remarks For future procurement advice has been sent to AME/MPO/Fur on
18/12/2013.
![Page 37: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/37.jpg)
45
Reporting Railways CR/Aug'13, SCR/Aug'13, SWR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
Non-AC/FRP Window/Emergency Window
Brief Account of
Problem
FRP Louvre shutter for Emergency Window is frequently damaged
by miscreants, Alternate Material to be provided. APD for
emergency window in Non AC coaches may be suitably modified
as most of them are getting damaged during first trip itself.
Emergency Window grill in Non AC coaches : Passengers are lifting
the grill by breaking the seal, lock pin and FRP housing for resting
their arm on the window sill. Running coaches with these grills in
open condition is unsafe for passengers. Mumbai division
modified the existing arrangement by shifting the grill from inside
to outside facilitating adequate space for resting the arm. This may
be implemented in future design of Emergency window in Non- AC
caches.
Action taken/Drawing
No.
New design of shutters received from RDSO with wire mesh
outside. RDSO asked the suggestions and comments about the
new design and the same has been given vide letter
No.MD/FUR/W&D/98 Dt.21.01.2014. Breakage will be taken care
in this design. Will be implemented after taking care the stock and
dues.
Implementation status
of the modification in
the coaches
Under Implementation
Minutes of the
Meeting April 2014
RDSO has to give final design.
CPM- we can go for SS Louvres for Emergency window.
Remarks New drawing to be issued by Design
![Page 38: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/38.jpg)
46
Reporting Railways SR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
SGSLR/Shell Assy/Body Bolster
Brief Account of
Problem
Body Bolster lifted cases are reported recently in SLR coaches to
be studied in detail.
Action taken/Drawing
No.
This problem reported in the coach No. SR SGSLR 97770 which is
RCF built Coach. So far this type of cases are not reported in any of
ICF built coaches. In the last Customer Interaction Meeting, CR
reported body bolster seating/rubbing on bogie in some GS
Coaches. Rly asked provision of air spring in all mainline coaches.
RDSO conducted trial with air spring in mainline coaches and the
oscillation trials gave good response. However, without FIBA
Device (Failure Integrated Brake Adjusting Device – the design of
the same is yet to be finalised by RDSO), if the air spring fails at
the speed of 90 kmph it will be very disastrous. All Rlys are
requested to write to RB regarding the usage of air spring in main
line coaches.
Implementation status
of the modification in
the coaches
Not pertaining to ICF Coach. With regard to Air Suspension in
conventional coaches. the issue is pending with RDSO
Minutes of the
Meeting April 2014 Not ICF Coach.
Remarks ---
![Page 39: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/39.jpg)
47
Reporting Railways SR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
All Types/Shell /Floor Side Moulding
Brief Account of
Problem
Floor Side moulding (curved plate) to be provided in stainless steel
instead of MS in pantry cars and other coaches also.
Action taken/Drawing
No.
Drawing (No.140-1-0-040/col II 2004) has already been modified
with stainless steel (AISI 301)material instead of IRS M-41, which is
same as trough floor.
Implementation status
of the modification in
the coaches
Under Implementation
Minutes of the
Meeting April 2014 Production shell to ensure
Remarks New forming tool is required to manufacture Stainless Steel Floor
Side Moulding. Advised design to issue drawing for the press tool.
![Page 40: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/40.jpg)
48
Reporting Railways SR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
SGSCZ/Furnishing/Seat Arrangement
Brief Account of
Problem
Face to face design of seats in SCZ coaches against bus type 3
seater. Seat area, space below seat and leg space are less in BUS
type 3 seater (post 2003 SCZ Coaches). Securing arrangement for
BUS type 3 seater is not maintenance friendly - post 2003 SCZ
Coaches. Cushion/ rexine renewal problem due to Non -
detachable back rest - BUS type 3 seater in SCZ Coaches
Action taken/Drawing
No.
Design has been reverted back to face to face seating arrangement
Drg.No.297-61-601 alt ‘g’, Dt.12/2012. New seat design
(Ergonomic profile and Frame with Stainless Steel Material) has
been introduced. Will be implemented from 2014 -15 onwards.
Implementation status
of the modification in
the coaches
Under Implementation
Minutes of the
Meeting April 2014 June onward with face to face design – CWE/F to confirm.
Remarks
Production/Fur to ensure.
![Page 41: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/41.jpg)
49
Reporting Railways SCR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
All/Furnishing/Lavatory Door
Brief Account of
Problem
Inside toilet, door entrance beading worked out in most of the
coaches.
Action taken/Drawing
No.
It has been decided to provide all the mouldings with Stainless
Steel material. PO awaited for Tender Nos. 07/14/2003,
07/14/2005, 07/14/2004. PO issued 07/14/2002/2002
Dt.14/04/2014, 07/14/2006/1169 Dt.28/03/2014.
Implementation status
of the modification in
the coaches
Under Implementation
Minutes of the
Meeting April 2014
CDE-> to be implemented invariably.
CRWS Bhopal is using SS
Remarks Production/Fur to ensure.
50
Reporting Railways SWR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
All Types/Air Brake
Brief Account of
Problem
There is no provision to isolate BP and FP in case of damage to
branch pipe in Guards compartment. Isolation cocks may be
provided at suitable location.
Action taken/Drawing
No.
Provision has been included in the drawing No. 242-35-209 Alt ‘a’
Feb 2014. Under implementation.
Implementation status
of the modification in
the coaches
Under Implementation
Minutes of the
Meeting April 2014 ---
Remarks ---
![Page 42: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/42.jpg)
51
Reporting Railways SR/Aug'13, SCR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
SGSCN/Seat & Berth/Seat & Berth
Brief Account of
Problem
Long seat securing seat wings (Chair Angle – Sidewall side) and
studs are getting corroded frequently, either alternate non
corrosive material or protective coating to be used in non-AC
coaches. Seat / berth legs are getting corroded, either alternate
non corrosive material or protective coating to be used in non-AC
coaches.
Action taken/Drawing
No.
Since all the other structural materials are of IRS M-41, presently
only Chair Angle Material cannot be switched over to Stainless
steel. ICF/Production has been advised vide letter No.
MD/D/PAINTS/73 Dt.23.04.2014 to paint all the structures up to
window level with the anti-corrosive paint to Specn.
RDSO/M&C/PCN/123.
Implementation status
of the modification in
the coaches
Under Implementation
Minutes of the
Meeting April 2014
Production Sheet to implement.
Rlys to be informed to follow the same during maintenance.
Remarks Design has been advised to issue modified drawing as this item is
an outsourced item.
![Page 43: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/43.jpg)
52
Reporting Railways SR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
ACCZ/Seats/Seats
Brief Account of
Problem
Different designs of AC Chair Car Chairs cause maintainability
problems like removing the Chairs completely even for attending
minor defects
Action taken/Drawing
No.
Design of chairs has been revised and standardized. Modified
specification ICF/MD/119 Rev.03 Dt.16/04/2014 has been issued
with wider snack table, approved brands of reclining mechanism
(gas springs), S.S. seat frames, Sturdy stoppers for the reclining of
back rests and snack table etc. CME has approved the
procurement as per the new specification and the same is under
progress.
Implementation status
of the modification in
the coaches
Under Implementation
Minutes of the
Meeting April 2014 Procurement process under progress.
Remarks ---
![Page 44: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/44.jpg)
53
Reporting Railways SR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
All Types/Partition frame/Partition frame
Brief Account of
Problem
All Lavatories and door way partition pillars are getting corroded
frequently. Lavatory partition walls getting corroded
Action taken/Drawing
No.
To combat corrosion, skirting is being provided to avoid seepage of
water during washing. Reasons of water seepage and corrosion to
be studied by the maintenance depot. Workshops to ensure
proper sealing periodically. Since all the other structural materials
are of IRS M-41, presently only Chair Angle Material cannot be
switched over to Stainless steel. ICF/Production has been advised
vide letter No. MD/D/PAINTS/73 Dt.23.04.2014 to paint all the
structures up to window level with the anti-corrosive paint to
Specn. RDSO/M&C/PCN/123.
Implementation status
of the modification in
the coaches
Under Implementation
Minutes of the
Meeting April 2014
Areas where more corrosion occurs has to be painted with
anticorrosive 123 paint.
Rlys to be advised to follow the same during maintenance.
Remarks
Design has been advised to include application of anti-corrosive
paint to Specn. RDSO/M&C/PCN/123 in the drawing as partition
pillar is an outsourced item.
![Page 45: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/45.jpg)
54
Reporting Railways SR/Aug'13, SWR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
GS, SLR/Luggage Rack
Brief Account of
Problem
Increased height of luggage rack in the GS coaches causing
inconvenience to aged passengers, not able to lift their luggage
and stack. Further it decreased the gap between the rack and
ceiling where unreserved passengers climb over occupy the
luggage rack for lie-down and keep their foot on ceiling and
making it shabby. Often damage the roof limpet sheets to stuff
garbage inside which is hazardous and may cause fire accidents.
Hence the joints in the roof shall be made foolproof to avoid
misusing the same. Damage to weld mesh partition and Limpet
celling due to higher level location of luggage rack - post 2007 GS
& SLRD
Action taken/Drawing
No.
The location (height) of luggage rack is as per RDSO instruction.
The matter will be discussed in the next CDE Conference and
decision to revert back to the old location will be taken
accordingly.
Implementation status
of the modification in
the coaches
Design/Drg. is under review
Minutes of the
Meeting April 2014 CDE-> will issue drg.
Remarks ---
![Page 46: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/46.jpg)
55
Reporting Railways SR/Aug'13, SCR/Aug'13, SWR/Aug'13, CR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
GS , SLRD /Partition & Roof Ceiling/Weld Mesh Partition
Brief Account of
Problem
Luggage rack top wire mesh panel wires are coming out of frame.
Possibility of using old model diamond type wire can be explored.
Action taken/Drawing
No.
Drg. No. 285 10 502 & 503 are under issue with diamond type
(expanded type) mesh.
Implementation status
of the modification in
the coaches
Design/Drg. is under review
Minutes of the
Meeting April 2014 Drg to be issued with diamond type
Remarks Design to issue drawing
56
Reporting Railways SR/Aug'13, SCR/Jan'14
Type of
Coaches/Major
Assy./Specific Item
Non - AC/Lavatory/Lav Door
Brief Account of
Problem Damage of Al. ventilators of Lav. Doors
Action taken/Drawing
No.
The damages are due to pilferage/Vandalism Material to be
changed from Al. to SS. Problems have been studied. Change over
to MS will lead to corrosion problem. Hence it is proposed to
change over to SS design. Drawing will be issued in the end of May
‘14 for Sturdy Structured Ventilators of Stainless Steel Material.
Implementation status
of the modification in
the coaches
Design/Drg. is under review
Minutes of the
Meeting April 2014 Go for SS
Remarks Design to issue drawing
![Page 47: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/47.jpg)
57
Reporting Railways CR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
ALL/BATTERY BOX
Brief Account of
Problem Premature corrosion in battery box
Action taken/Drawing
No.
In IGBT DEMU, new design of SS battery box has been already
implemented. It is considered for providing similar design in other
mainline coaches also.
Implementation status
of the modification in
the coaches
Design/Drg. is under review
Minutes of the
Meeting April 2014 ---
Remarks ---
58
Reporting Railways SR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
SCZJS/ELECTRICAL/Emergency Light
Brief Account of
Problem No. emergency celling lights in JS
Action taken/Drawing
No. Drawing will be issued in May 2014.
Implementation status
of the modification in
the coaches
Design/Drg. is under review
Minutes of the
Meeting April 2014 ---
Remarks ---
![Page 48: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/48.jpg)
59
Reporting Railways SWR/Aug'13, SCR/Aug'13 CR/Aug'13, SCR/Jan'14, SWR/Jan'14,
SR/Jan'14
Type of
Coaches/Major
Assy./Specific Item
AC & Non – AC Sleeper Coaches/Seats & Berths/Seats & Berths
Brief Account of
Problem PU coated ladder - Peeling off and forms sharp edges
Action taken/Drawing
No.
RDSO has sent new set of drawings for ladder for AC and Non-AC
vide their Lr.No.MC/CB/MM dated 19-12-2013 for comments and
the same has been given vide letter No.ICF/MD/FUR/W&D/98
Dt.21.01.2014. It had been decided in the last Customer
Interaction Meeting to go in for LHB type ladder (Only Steel) in ICF
Coaches also. But as per the Inspection Note of MM Visit to ICF on
09/01/’14 & 10/01/’14 (Sl. No.32) the ladders for upper berths in
LHB Coaches should preferably be covered with PU Foam as an
injury free feature.
Implementation status
of the modification in
the coaches
RDSO Item, the point has been highlighted to Mr.Srivatsav,
Dy.Director/RDSO who was present in the meeting.
Minutes of the
Meeting April 2014
RDSO item
Remarks ---
![Page 49: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/49.jpg)
60
Reporting Railways SWR/Aug'13, SCR/Aug'13, SCR/Jan'14, SR/Jan'14, CR/April ‘14
Type of
Coaches/Major
Assy./Specific Item
All Types/Furnishing Work/Paneling – LP Sheet
Brief Account of
Problem
LP Sheet - Crack/breakage. As the marking of manufacturer’s
initials are on the back side of the sheet it is not possible to trace
the manufacturer without disassembling the panels for initiating
warranty claim. Coaching Depots are complaining that they do not
have sufficient man power to disassemble the panels and the
coach is forced to run in service until the next POH
Action taken/Drawing
No.
This is Fire Retardant Property Item controlled by RDSO. RDSO had
been addressed vide letters Nos. MI/13-A/Gl Dt. 02/08/2012 and
No.MI/73 Dt. 21/11/2012.
Implementation status
of the modification in
the coaches
RDSO Item, the point has been highlighted to Mr.Srivatsav,
Dy.Director/RDSO who was present in the meeting.
Minutes of the
Meeting April 2014
CWE -> indentification ot be given in front side.
CDE/Mech - Aesthetic will be spoiled.
Remarks ---
![Page 50: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/50.jpg)
61
Reporting Railways SR/Aug'13, SWR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
All Types/Seats & Berths/DTPB - Densified Thermal Bonded
Polyester Block (Recron)
Brief Account of
Problem
DTPB cushions are getting compressed within first POH. AC
Coaches berth cushion looses their strength and cushioning ability
after 8-10 months
Action taken/Drawing
No.
DTPB (Densified Thermal Bonded Polyester Blocks) is used as
cushioning material which has the problem of permanent setting.
It has been noted that items introduced for fire retarndancy
resulted in peeling also aesthetic and comfortable level has gone
down. RDSO has already been requested to develop better
cushioning material.
Implementation status
of the modification in
the coaches
RDSO Item, the point has been highlighted to Mr.Srivatsav,
Dy.Director/RDSO who was present in the meeting.
Minutes of the
Meeting April 2014 RDSO item
Remarks ---
![Page 51: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/51.jpg)
62
Reporting Railways SR/Aug'13, SCR/Jan'14, SWR/Jan'14
Type of
Coaches/Major
Assy./Specific Item
All Types/Plumbing Work/Side Filling Pipes
Brief Account of
Problem
Water leaking from side filling pipes. Corrodes head stock top
flange, centre stiffener in many coaches. Shifting of side filling
pipe position to be explored
Action taken/Drawing
No.
New pipe design introduced Drg. No.248 63 004 as per CAMTECH
design. The feed back from the railways will be highlighted to
CAMTECH
Implementation status
of the modification in
the coaches
RDSO Item, the point has been highlighted to Mr.Srivatsav,
Dy.Director/RDSO who was present in the meeting.
Minutes of the
Meeting April 2014
Dia difference between old design pipe and new design pipe is the
reason for leak. Rlys are using same dia for both.
To be streamlined.
Remarks Railways to give feedback.
![Page 52: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/52.jpg)
63
Reporting Railways CR/Aug'13, SWR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
All Types/Bogie Assembly/Hytrel Washer
Brief Account of
Problem Hytrel washers - crack
Action taken/Drawing
No.
All Rlys are requested to give the failure data with age and supplier
details.
Implementation status
of the modification in
the coaches
RDSO Item, the point has been highlighted to Mr.Srivatsav,
Dy.Director/RDSO who was present in the meeting.
Minutes of the
Meeting April 2014 Rlys are requested to give feedback.
Remarks ---
64
Reporting Railways SR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
All Types/Bogie Assy/Brake Gear Bushes
Brief Account of
Problem
Manufacturer initial and year of manufacture is not traceable and
getting defaced on run in the brake gear bushes within 9 months.
Hence raising warranty claim is very difficult. Specific
clause/condition to be stipulated in the RDSO specification with
the marking should be permanent and clearly visible up to the
condemnation period of brake gears for raising necessary warranty
claims.
Action taken/Drawing
No.
The issue of marking has been highlighted to RDSO vide letter No.
MD/D/BB/45 Dt.23/04/2014.
Implementation status
of the modification in
the coaches
RDSO Item, the point has been highlighted to Mr.Srivatsav,
Dy.Director/RDSO who was present in the meeting.
Minutes of the
Meeting April 2014 ---
Remarks ---
![Page 53: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/53.jpg)
65
Reporting Railways CR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
All Sleeper Coaches/Seats & Berths/Seats & Berths
Brief Account of
Problem
Fixed type LHB design may be adopted for Snack Table with bottle
holder below the table.
Action taken/Drawing
No.
In the last meeting Rlys were of the opinion that the provision of
snack table and Magazine Bags in SCN Coaches to be avoided. As
such, the Rlys were requested to write to RDSO. Vide inspection
Note of MM at RCF on 25.01.2014, the LHB snack table to be
made foldable and the magazine bags may be inscribed in the side
panel (point No.1.0 A(c)).
Implementation status
of the modification in
the coaches
ICF design is foldable type.
Foldable type to continue
Minutes of the
Meeting April 2014 Foldable type to continue
Remarks ---
![Page 54: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/54.jpg)
66
Reporting Railways SWR/Aug'13, CR/Apr ‘14, SWR/Apr ‘14, ECoR/Apr ‘14
Type of
Coaches/Major
Assy./Specific Item
All/PAINTING
Brief Account of
Problem
Fading, peeling off, improper application are noticed in the
exterior painting of coaches. In 2011 &12 manufactured coaches,
roof is getting corroded. The thickness of paint is found sufficient.
The reason may be due to poor surface preparation. Also the roof
surface in curved portion above rain water gutter is having plenty
of dents.
Action taken/Drawing
No.
Now all the coaches are being painted in automatic paint both
from 2012 onwards. As per the instruction of CME, M/s.Vibgyor
conducted a Quality Audit and the report is under study. The copy
of the report is enclosed as annexure-I.
Implementation status
of the modification in
the coaches
Under Study
Minutes of the
Meeting April 2014
ICF painting is superior- most of the Rlys.
WR- some coaches are received with paint peeled condition.
CMP-> feedback reg. LHB painting to be given by user Rlys.
Shops to ensure separate treatment for IRS M41 and SS shells.
CPM- we are heading towards paint less coach design soon. Paint
audit report to be enclosed.
Remarks Action by Production/Fur
![Page 55: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/55.jpg)
67
Reporting Railways SWR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
All Types/FURNSHING/FAN Assembly
Brief Account of
Problem
In AC coaches, fan is infringing with the curtains. Fan to be
relocated.
Action taken/Drawing
No.
Due to space restriction it is technically not feasible. Moreover in
the light of the recent Fire Accident in Nanded Express on
28/12/2013, CRS/Southern Circle had recommended that Railway
should do away with curtains in gangway portion of AC Coaches.
RB vide letter No. 99/M(C)/141/21 Dt.07.04.2014 has instructed
to remove the aisle side curtains in the 3rd
AC Coaches (window
curtains to continue) and the same has been implemented.
Implementation status
of the modification in
the coaches
Not technically feasible
Minutes of the
Meeting April 2014 ---
Remarks ---
![Page 56: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/56.jpg)
68
Reporting Railways SR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
All Types/Shell Assy./Under Frame
Brief Account of
Problem
Lifting pads are not provided with stopper arrangement as done in
MG coaches to avoid slipping of jib tackles during lifting also
elongated holes can be provided on the lifting pad for pulling the
coaches with rope during traverser shunting.
Action taken/Drawing
No.
Lifting pad with stopper arrangement is technically it is not
feasible. In the last customer interaction meeting CR reported
rubbing of lifting pad with one of the bogie frames of an AC Coach.
CR was requested to do further investigation about the same and
submit the report for further study by ICF. The report is yet to be
received.
Implementation status
of the modification in
the coaches
Not technically feasible
Minutes of the
Meeting April 2014 ---
Remarks ---
![Page 57: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/57.jpg)
69
Reporting Railways SWR/Aug'13
Type of
Coaches/Major
Assy./Specific Item
All/Flooring
Brief Account of
Problem
Adhesive material spilled over the Vinyl sheet, excessive adhesive
is no being removed resulting in adhesive stain in Vinyl sheet and
chequered plate
Action taken/Drawing
No.
Quality issue. Down the line instructions has been given to the
staff concerned to be more careful during PVC Flooring.
Implementation status
of the modification in
the coaches
Quality Issue
Minutes of the
Meeting April 2014 CME/QA - Let us take a drive
Remarks ---
70
Reporting Railways SCR/Aug'13, SCR/Jan'14
Type of
Coaches/Major
Assy./Specific Item
All Types/Flooring/PVC Flooring
Brief Account of
Problem PVC Flooring joint defects
Action taken/Drawing
No.
Based on the customer complaints, manufacturing and Quality
control have been improved. No joints shall be allowed in the
Lavatory and passage. Drg. Modified to avoid/minimize the
number of joints in the pathway. All the hot air welders are
trained at TTC in view of the complaints. Further strict Quality
Control will be exercised during manufacturing and inspection. To
avoid drumming sound in lavatory inlay, additional stiffeners with
additional step have been introduced. Drg. No. ICF/STD-4-1-011 alt
![Page 58: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/58.jpg)
‘d’ dt.22-02-13. Stacking of PVC material in ICF has been improved
(vertical instead of horizontal stacking). Complaint has been
received from SCR only. SCR has been requested to study the
problem further and submit a report for further action at ICF.
Implementation status
of the modification in
the coaches
Quality Issue
Minutes of the
Meeting April 2014
Shops are using coloured wires for welding for improve aesthetic
look, Anabond application around lav pan
In metro coaches 2 pack adhesive system used for PVC joint, that
has to be tried for other coaches also.
Training given to artizans and identified some special tools. ICF has
indented for the same.
Remarks ---
71
Reporting Railways SCR/Aug'13, SWR/Jan'14
Type of
Coaches/Major
Assy./Specific Item
Non AC/Window/Window Sill & Sidewall Sheet
Brief Account of
Problem
Almost all windows manifest gap at sill level, between sidewall
sheet & window resulting in rain water seepage. Putty filling by ICF
does not last long
Action taken/Drawing
No. Template is being used during window sill assembly.
Implementation status
of the modification in
the coaches
Under Trial
Minutes of the
Meeting April 2014 ---
Remarks This is a quality issue. Shell to ensure the same.
![Page 59: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/59.jpg)
New points to be discussed in the next Customer Interaction Meeting
![Page 60: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/60.jpg)
Sl.
No.
Reporting
Railways
Specific Item
InvolvedBrief Account of Problem
Action taken/Possible
Solutions
Implementaion
StatusAction by Minutes of the Meeting April 2014 Remarks
1ECoR(CDO/Wa
ltiar)
ALARM RESETTING
WIRE ROPE
In Non-AC coaches, the Alarm resetting rope is
provided at one side of end wall. Incase of chain
pulling by passengers, the en-route Driver and Guard
face difficulty as they have to go through the coach to
reach the other side for resetting. This causes
hardship and also extra detention time. Provision for
resetting of PEASD on both side of the end wall is
required.
Design to be reviewed -- Design Design to be reviewed
To be discussed
in the next
Customer meet.
2ECoR(CDO/Wa
ltiar)
MAIN DOORS,
WINDOW BARS
In Main doors, the window bars are provided at close
frequency. Hence during washing, brush can not
reach the glass surface and it is difficult to clean these
glasses. Hence it is suggested that the Window Bars
are to be provided at a distance same as other
windows of the coaches. Further the window is at a
very lower level and this prevents passengers to view
from inside. Design may review elimination of
window by glass at upper level, same as Non-AC LHB
coaches.
Design to be reviewed -- DesignDesign to be reviewed
To be discussed
in the next
Customer meet.
3ECoR(CDO/Wa
ltiar)
DRAW GEAR
SUPPORT BRACKET
It is observed that the Outer Head stock bracket
housing for the Draw Gear Assembly get corroded
within short period of service. Procedure for surface
treatment of these structural members to be
reviewed and necessary preventive action to be taken
Under Study/To take
action-- Design
Corrosion during 1st POH. To be studied
by design.
To be discussed
in the next
Customer meet.
4ECoR(CDO/Wa
ltiar)
DESIGN
MODIFICATION OF
GAS CYLINDER
SECURING
BRACKETS
The bracket provided to hold the gas cylinders in
Pantry cars get damaged/ distorted during handling
by pantry car staff. The present steel brackets may
please be altered by flexible member of sufficient
strength to clamp these cylinders.
Under Study/To take
action-- Design Chain type or fencing type required.
To be discussed
in the next
Customer meet.
5ECoR(CDO/Wa
ltiar)
PARTITION WALL
BETWEEN
LUGGAGE
PORTION &
PASSENGER AREA
There are frequent cases of damage of partition wall
between luggage portion and passenger area by
miscreants. The metal plates of partition walls are
found cut to pilfer material by miscreants. Hence it is
suggested that the steel plate used in partition wall
may please be replaced by channel type corrugated
sheet of sufficient thickness to prevent such cases
Under Study/To take
action-- Design
Corrugated / thick sheet to be provided.
Provision of LP sheet not required so that
any opening made by the miscreants can
be easily detected. Design to study the
problem
To be discussed
in the next
Customer meet.
Minutes of Customer Interaction Meet April 2014 - New Points
![Page 61: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/61.jpg)
Sl.
No.
Reporting
Railways
Specific Item
InvolvedBrief Account of Problem
Action taken/Possible
Solutions
Implementaion
StatusAction by Minutes of the Meeting April 2014 Remarks
6ECoR(CDO/Wa
ltiar)EQUALIZING STAY
There are cases of failures of Equalizing stay during
service. Even there are cases of en-route detachment
of coaches due to Equalizing stay failure. The bracket
holding the Equalizing stay and the equalizing stay
unit get bend during service and it becomes virtually
impossible to remove the long pin to replace the
defective member. The coach has to be detached and
given sick line attention. Design and fitment of this
member to be reviewed.
Design to be reviewed -- Design
i). CR design to be adopted.
Ii). Forged design given by RDSO
To be discussed
in the next
Customer meet.
7ECoR(CDO/Wa
ltiar)
CEILING DAMAGE
IN CN COACHES
BELOW THE
WATER TANK
In some trains there are frequent cases of intentional
damages of toilet ceiling of CN coaches below the
water tank. These damages are caused by miscreants
in en-route. The material is used for ceiling below the
water tank is limpet sheet. Design may replace the
limpet material by other material of better strength
to prevent damages.
8ECoR(CDO/Wa
ltiar)
WRAPPERS, TEA
CUPS AND PAPER
ITEMS INSIDE
ROOF CEILING
Ceiling provided below the roof sheet is of limpet
material in GS/SLR coaches. Passengers occupying
space on luggage rack used to tear these sheets at the
joints and insert wrappers, tea cups and paper items.
These are vulnerable to fire accidents. Limpet being
soft material, easily get damaged by miscreants.
Further it is very difficult for Depot to repair these
ceiling damages. Hence roof ceiling of GS/SLR coaches
may please be provided with alternate material of
higher strength and with minimum joints to prevent
such intentional damages by passengers.
9ECoR(CDO/Wa
ltiar)
LUGGAGE DOOR
HANDLE DESIGN
The luggage door handle of SLR coaches are
protruded inside, which prevent the door to slide
incase of overloading of volumetric space. The inner
handle of the luggage door to be designed ‘Sunk-in’
type to arrest this problem.
Design to be reviewed -- Design
i) Sunk in type handle required. Design to
study.
ii) Imported Rollon make rollers to be
used.
To be discussed
in the next
Customer meet.
10ECoR(CDO/Wa
ltiar)
AXLE BOX CANTED
& GRAZING
In recent years, there is increase in the cases of
canted and grazing of primary suspension unit with
wheel. In East Coast Railway nearly 40% of cases of
sick marking of coaches during primary examination
is due to above reason. Further due to canting the
collars of rear cover of the Axle Box assembly get
damage and metal particles get contaminated in
grease.ICF being manufacturing unit, may re look into
the modification done in primary suspension like use
of hytrel washers etc. and take measures to prevent
such cases and thus increase the coach reliability &
reduce the down time
RDSO Items --Design/
RDSO
Due to Hytrel washer problem.
RDSO to be advised.
Copy of the letter givn to RDSO to be
given to ICF by Rly.
20% Kharagpur workshop.
40% ECoR.
Uneven packing in bogies is also one of
the reasons.
Canting leads to the rear cover damage
CR, SER & ECoR is requested to give
feedback.
To be refereed
to RDSO
Vie CDE/Mech`s Note no.
MD/F/Paneling/97 dated 12-05-2014, it is
proposed to provide SS paneling in
toilets, roof , doorways and on side wall
from floor to winodw sill level.
One GS & one SCN coach will be
furnished as per Drg. GS5 43 504 alt 'a'
and based on the experience on
prototypes, further modifications
required if any, will be carried out in
drawings for regular implementation.
To be discussed
in the next
Customer meet.
Design to be reviewed -- Design
![Page 62: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/62.jpg)
Sl.
No.
Reporting
Railways
Specific Item
InvolvedBrief Account of Problem
Action taken/Possible
Solutions
Implementaion
StatusAction by Minutes of the Meeting April 2014 Remarks
11ECoR(CDO/Wa
ltiar)
LIQUID SOAP
CONTAINER
The liquid soap container design is very flimsy & the
cap is not an integral part of the unit, hence it is
missing in every trip. Plunger type container with APD
arrangement may please be provided in AC coaches.
Design to be reviewed -- Rlys Rlys are requested to provide their own Rlys to provide.
12ECoR(CDO/Wa
ltiar)Main Door
Main doors are supported on the lower foot step
bearing which houses the door pivot , the pivot piece
welded on a plate. The plate gets corroded and the
door comes out of its sheet. These cases are frequent
and cause inconvenience to passengers during
service. Hence arrangement for holding the door
pivot may suitably modified to arrest this problem.
Under Study/To take
action-- Design Design has been changed.
To be discussed
in the next
Customer meet.
13ECoR(CDO/Wa
ltiar)Upholstery Cloth
ACCUMULATION OF DUST IN BERTH FOLD - Berth
folds in AC coaches form deep pocket due to
excessive Rexene provided. This causes accumulation
of dust, dirt and it is difficult to clean regularly. It is
suggested to provide lesser length Rexene so that the
fold remain aligned with berth surface.
Design to be reviewed -- Design New type is being used.
To be discussed
in the next
Customer meet.
14ECoR(CDO/Wa
ltiar)DUSTBIN
INCREASE IN DUSTBIN SIZE - The dustbins provided in
AC coaches is of lesser volume and do get filled in
frequent interval. Hence, it is suggested to provide
bigger volume dustbins with facility to accommodate
either below the wash basin or at the passage
between the toilets near vestibule.
-- -- Rlys In every 6 hours bins should be cleared. Closed
15ECoR(CDO/Wa
ltiar)WINDOW CURTAIN
The slider type curtain arrangement in windows of AC
coaches is not durable and difficult to function. This
arrangement may please be replaced with ring type
arrangement suspended from tube.
-- -- -- ICF is using ring type Closed
16ECoR(CDO/Wa
ltiar)
Incase any change in design of any component /
assembly ICF should inform user railways in advance
the drawing, the source of supply etc. so that material
can be procured in time to meet the requirement the
moment coach is put into service
-- -- Design To be informed --
17 SCR Safety Wire Rope Safety rope is taking load of bio tank Design to be reviewed -- Design
Washer size to be increased.
The problem has been addressed in the
newly turned out coaches.
To be discussed
in the next
Customer meet.
18 SCR Chain with Split PinWorking out of chain from rubber beading while pull
due to lesser thickness of split pinDesign to be reviewed -- Design Washer size to be increased
To be discussed
in the next
Customer meet.
19 SCR Retention tankMisalignment of Bio-tank inlet with commode outlet
pipe-- -- Prod. FUR Furnishing Div. to Check --
![Page 63: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/63.jpg)
Sl.
No.
Reporting
Railways
Specific Item
InvolvedBrief Account of Problem
Action taken/Possible
Solutions
Implementaion
StatusAction by Minutes of the Meeting April 2014 Remarks
20 SCR FurnishingCollapsible shutters are provided for linen room
instead of panel doorsDesign to be reviewed -- Design To be studied
To be discussed
in the next
Customer meet.
21 NR Chairs
Six LHB chair cars ( COACH NO 13877,13876,13151,
13452, 13153, 13154 LWFCZAC’S ) was received in
the year 2013 from ICF by DLI Division and following
defects are observed:
In coaches 13876 NR/ LWFCZAC & 13877 NR/
LWFCZAC, foundation bolts were not available in the
seats causing uprooting of seats from its base. These
were attended by the firm, M/s Flexo Foam under the
supervision of SSE/ICF.
Seat cushions of said manufacturer are very hard &
appearance of seat upholstery is not up to the mark.
Reclining mechanisms of foot rests are getting
defected and rubber pads of their paddles are also
getting loosed.
Rubber pad of arm rests are getting torn and their PU
paint are also getting worn out.
Reclining gears of seats are getting free and they do
not sustain locking of back rest.
Knobs of snacks tables are getting uprooted.
Spring mechanisms for folding of roller blinds are
getting weak and retainers of roller blinds are also
uprooted.
The compartment & vestibule doors are getting
jammed due to serration on their guide rods and pull
handles of compartment doors are also getting
broken from their base.
Under warrantee attention of the concerned firms
needs improvement.
Quality Issue -- Prod. FUR Furnishing Div. to improve quality. --
22 NR Lav. Pan
Problem of water splashing from toilet pans is
observed due to small size of pan in modular toilets.
Therefore water accumulates on the toilet floor.
Under/To be
Implemented-- Design
The problem is already addressed by
Introducing new type of inlay.
Point No. 44 above.
closed
23 NR Sliding DoorDefective Sliding doors
Failure of reverse mechanism
Under Study/To take
action-- Design Design to study
To be discussed
in the next
Customer meet.
24 NR Upholstery Cloth
Loose skinning (wrinkling) of oil cloth
on berth and seatsUnder Study/To take
action-- RDSO Data to be provided to RDSO by Rlys --
25 NR Linen Room Door Defective linen luggage doorUnder Study/To take
action-- Rlys Data to be provided to ICF by Rlys --
![Page 64: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/64.jpg)
Sl.
No.
Reporting
Railways
Specific Item
InvolvedBrief Account of Problem
Action taken/Possible
Solutions
Implementaion
StatusAction by Minutes of the Meeting April 2014 Remarks
26 NR Window Glass
Suggestions: Sealed window glass Units should be
interchangeable.
New units are of different dimensions.
COACH NO 13158,13159AC CHAIR CARS SIZE-
1220X762X25.5 WHILE PEREVIOUS SIZE WAS
1220X752X25.5
Under Study/To take
action-- Design Design to study
To be discussed
in the next
Customer meet.
27 NRBrake Cyliner
Arrangement
Problem of improper releasing of bogie mounted
brake cylinders was observed in M/s stone India Ltd.
make cylinders. Brake cylinders were changed by DLI
Division and letter to ICF in this regard was sent by
letter no. 672-TRS/O/ICF/M-II/6 dated 18/07/2012.
In the month of April 2014, again two coaches have
been detached for the above mentioned problem of
M/s Recon makes BC. Brake cylinders have been
changed.
Under Study/To take
action-- Design Rlys to give more data on this --
28 NR Roller Bearing
Roller bearing failure of coach no. 134197 WR/GS
within 100 days of commissioning caused other end
detachment of coach at NZM after termination of
train no. 12917 on 08/06/2013.
Built - ICF 03/2013
Return - 02/2015
Bearing make – FAG
No. - 22326 C3 – F2, 09/12, R422 H.K.
Quality Issue -- QA
Bearing failed due to Cage failure.
Warranty claim accepted and
replacement given to AMV workshop by
the Firm.
Closed
29 NR Magazine bag
To be bolted from both side of the seat panel – may
hamper with the anti-injury feature.
In CME conference decided to do away with the
magazine bag in SCN – RDSO to take action
Under Study/To take
action-- --
Not technically feasible -may hamper
with the anti-injury feature.Closed
30 NRWater bottle
holderFixing arrgt to be strengthened.
Under Study/To take
action-- -- Back pieces are already provided Closed
31 NR Flush valve
Prone to theft
Rlys want PTFE materialUnder Study/To take
action-- Design At present SS is provided
To be discussed
in the next
Customer meet.
32 NR Lav. Doors
Lower pivot corrosion.
ICF design is hinge type only. Not Pertaining to ICF -- -- -- Closed
33 WR Bogie frame WR 4795 bogie top flange worn-outUnder Study/To take
action-- Design Design to study
To be discussed
in the next
Customer meet.
34 SR Roof Assy. Roof leak in SR ACCW 11057Under Study/To take
action-- --
Seam welding opened up due to vibration
ICF staff attended the complaint at TVC. Closed
![Page 65: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/65.jpg)
Sl.
No.
Reporting
Railways
Specific Item
InvolvedBrief Account of Problem
Action taken/Possible
Solutions
Implementaion
StatusAction by Minutes of the Meeting April 2014 Remarks
35 SR
Mobile pouch,
magazine bag &
head rest
Giving up of mobile pouch, head rest Under Study/To take
action-- --
Dy CME SR-> As per RB instruction all the
magazine bags to be removed from SCN
coaches.
Rlys are requested to write to RDSO
Closed
36 SR Roof Assy.
SR ACCW 13055, ICF on 26.9.13 was marked sick for
water seepage through incomplete welding of
mounting bracket welded on to AC duct opening of
RMPU(Roof mounted AC package unit)
Under Study/To take
action-- --
Water leaked through the ac duct flange
which was stitch ( skip) welded to the
duct wall.
Drawing revised with full welding .
ICF staff attended the complaint at TVC.
Closed
37 SR
Brake beam wire
rope hole
elongation
Elongation of wire rope safety bracket pin hole.
Thickness of the plate to be increased and nylock
bolts to be used in place of pin and cotter
(Coach No: CN 97313 PWL 05/09/12, RD: 04/14)
Under Study/To take
action-- -- Bolt with Nylock nut implemented Closed
38 SR Axle box Assy.
Axle box getting canted wearing of hytrel washer. The
limit of radial clearance of bearing in service to be
reduced
(SR SLR 95714 PWP 31-01-13, RD:09/14)
Under Study/To take
action-- RDSO
Hytral washer problem.
Rlys are replacing the hytral washers on
conditional base. CAM TECH manual does
not give any instruction regarding
replacement period.
Rlys are measuring the reduction in
height and replacing.
Suggestion from SR : Radial clearance of
bearing in service to be reduced.
Rlys are requested to write to RDSO and
RB
Informed to
RDSO
representative.
39 SR Axle box Assy.
Grease oozing out from rear cover. Quality and
dimensional perfection of rear cover and felt rings to
be ensured.
Under Study/To take
action-- Rlys
Rlys to give correct facts and figures to
RDSO. --
40 SR Brake Gear Bushes
Elongation of brake gear lever pin holes and Wearing
of pin number 3 Due to poor performance of brake
gear bushes
Under Study/To take
action-- Rlys
Rlys are requested to write to RDSO, RB
with a copy to ICF & RCF indicating
vendor wise, vintage wise failure analysis
--
41 SR Draw gear pins Draw gear head less pin moving upUnder Study/To take
action-- Rlys
A split pin introduced to arrest the
upward movement.
Rlys are requested to give an analysis
report.
--
![Page 66: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/66.jpg)
Sl.
No.
Reporting
Railways
Specific Item
InvolvedBrief Account of Problem
Action taken/Possible
Solutions
Implementaion
StatusAction by Minutes of the Meeting April 2014 Remarks
42 SR Wheel
Wheel grooving on account of brake binding.
Composite brake block material quality to be
improved
Under Study/To take
action-- Design
SR to write RDSO and ICF.
SR to give vendor names of faulty BMBC
to CME/ICF
SR initiatives:
1. Made the BMBC stroke 40mm against
32 mm to reduce brake binding- number
of brake binding cases came down.
2. Found that the new BMBC components
are not as per Drg. Eg. Plunger pin 2mm
against 4mm.
3. Checks introduced for endurance and
stroke length while POH of BMBC
4. 3 way cutoff cock introduced for BMBC
cutoff
- this feature is in-bulit in ICF design.
in ICF design, the cutoff valve is with an
exhaust port which will open to the
atmosphere while BMBC cutoff.
5. While accepting new BMBC from trade
samples to be tested for specified stroke
length.
To be discussed
in the next
Customer meet.
43 SRDash pot
protection tube
Dash pot protection tube - Continuous welding
required.
Drawing call s for continuous welding.
Most of the coaches are with PTFE only.
Under Study/To take
action-- --
Drawing calls for continuous welding.
Most of the coaches are with PTFE only. Closed
44 SR Bogie safety strap.
Giving up of safety stem with U bracket from bogie.
Stay base to be strengthened by giving proper
stiffeners and quality of welding to be ensured.
Under Study/To take
action-- Rlys
The coach mentioned is 10 years old old
coach.
Since the crown clearance adjusting
arrangement in the bogie image shown is
very old design, revised during year -- ,
the bogie also seems to be very old. Also
swapping of bogie during POH is
happening, without getting the bogie no.
identifying the manufacturer is not
possible.
SR is requested to give bogie details for
study the problem.
--
45 SR Glass shutter.
Glass shutter assembly dropping on run causing
injury to passengerUnder Study/To take
action-- QA
QA to check.
Rlys-> Quality of M/S Century polymers
is very bad.
--
46 SRVentilator below
AC berth-
Ventilator provided under long berths of AC coaches
near power panel side acts as thorough passage for
rats
Under Study/To take
action-- Design To be studied and relocated --
47 SR Luggage doorsDropping of luggage door from its guides:- To prevent
this a bolt is welded on side pillar as shown
Under Study/To take
action-- Design CR modification to be studied --
![Page 67: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/67.jpg)
Sl.
No.
Reporting
Railways
Specific Item
InvolvedBrief Account of Problem
Action taken/Possible
Solutions
Implementaion
StatusAction by Minutes of the Meeting April 2014 Remarks
48 SRBackrest locking
arrgt.Giving up of back rest securing latch
Under Study/To take
action-- Design
Serrations are damaging the berth holes.
Alignment issues --
49 SERHead stock
corrosion
While attending 2nd POH of 2009 built coaches at
KGPW, it is observed that majority of the coaches
need to be attended with heavy to medium corrosion
repairs. On testing by CMT/KGPW it is found that
metal composition of structure members does not
contain Cu, Ni or Cr and not complied with IRS-M-41-
97.
Metallurgical composition of structural members to
be reviewed and altered for imparting corrosion
resistant properties.
Under Study/To take
action-- --
Supplier of the head stock assembly
M/s.Neha Enterprises to be delisted.
--
50 SERDouble ferruble
fittings
Compression fittings are not as robust as thread
joints. They should be used in applications where the
fittings will not be disturbed and not subjected to
flexing or bending. The air brake pipe line joints in
LHB coaches are of ferrule joint type. Because of the
intrinsic weakness of the joint there have been
several incidences when the joint opened out in the
running train on being external hitting during run.It is
therefore proposed to replace the ferrule joints to
conventional threaded joints
Under Study/To take
action-- Rlys
Threaded joint for SLR & WLRRM
Rlys to write to RDSO with a copy to ICF &
RCF.
CDE->Use of indigenous MS products
with SS pipe is the cause of failure.
CME-> Go for imported DFF
Rlys to write to
RDSO
51 SERBio- toilet Safety
wire rope
It is observed that the safety wire ropes of Bio-toilets
are fitted tightely to the bio-digester tanks. Therefore
they act as load bearing members and no more as
safety wire rope. It should be ensured that there
must be a gap between the wire rope and the tank.
Under Study/To take
action-- --
Now the problem is corrected.
Rlys are requested to convey the coach
nos.Closed
52 SER CBC Coupling
Non-interchangeability of CBC Components-As per
RDSO’s spec. C-K009 (Rev.2), Para 3.3, ‘all
components of the coupler shall be interchangeable
with corresponding parts of other couplers. In
practice it is found that only two components, namely
‘rotary lock lift assembly’ and ‘uncoupling bar (sliding
bar)’ are interchangeable between the two
manufacturers and rest of the components are not
interchangeable.
Both the manufacturers have made their unique
design and fitment maintaining the operational
dimensions only. This creates problem in open line
maintenance as all maintenance points have to keep
material for both OEMs
Under Study/To take
action-- --
CDE/Mech - Different manufactures have
their own design hence
interchangeability is not there
Closed
![Page 68: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/68.jpg)
Sl.
No.
Reporting
Railways
Specific Item
InvolvedBrief Account of Problem
Action taken/Possible
Solutions
Implementaion
StatusAction by Minutes of the Meeting April 2014 Remarks
53 CRSE/NCRRotary Jn. Box
Panel
Wide gap between the panel and Rotary Junction Box
which is a potential fire safety.Design to study -- Design
To be discussed
in the next
Customer meet.
54 CDO/LKO AC Chair Car
Due to defacing/deficit of manufacturers name plate
on the Seats it is difficult to find out the
manufacturers of the seats.
Design to study -- Design To study
To be discussed
in the next
Customer meet.
55 CDO/LKO AC Chair Car Material assistance from ICF is required (Seats) CWE/S & CWE/F -- -- CWE/S & CWE/F to study --
56 CDO/LKODropping of lav.
Doors
Due to weak base channel on which hinges of doors
are screwed.
Size of door hinge should be increased to 4" from 3"
to increase number of screws/hinges.
Design to study -- Design To study
To be discussed
in the next
Customer meet.
57CDO/BBS/ECo
RPaint
The paint of the coaches received from the ICF gets
faded with in a span of one year. Further the paint
gets peeled out and a crack also develops causing
ugly look of the coach. Hence the quality of the paint
is to be ensured to avoid the above problems.
Rlys to provide the
name of the firm-- CWE/FUR To study --
58CDO/BBS/ECo
RDUST BIN
The link mechanism of the Dust Bin provided beneath
the wash basin is frequently getting damaged and not
user friendly. Hence alternative is to be developed to
surmount the above problem.
New Stainless steel
Dust bin is introduced-- Design To study
To be discussed
in the next
Customer meet.
59CDO/BBS/ECo
RWINDOW GLASS
Different sizes of window glasses are being provided
in AC coaches and it varies every year. This causes lot
of problems for the Depots during maintenance.
Hence window glasses are to be standardized so that
the maintenance can be done with minimum
inventory.
Design to study -- Design To study
To be discussed
in the next
Customer meet.
60CDO/BBS/ECo
R
BRAKE
EQUIPMENT
In ICF coaches DV, Isolating cock of DV and Isolating
cock of brake cylinder are fitted at different locations
of the coach. But in LHB coaches all these are fitted in
one location (Panel Mounted Braking System) making
it easy to operate. Hence in ICF coach fitment of all
these at one location on Panel Mounted Braking
System may be considered for easy operation.
Design to study -- Design To study
To be discussed
in the next
Customer meet.
61CDO/BBS/ECo
RPLUMBING
IN ICF AC coaches connection between centrifugal
pump and water tank is with GI pipe line but in LHB
coaches the connection between centrifugal pump
and water tank is with stainless steel wire mesh
protected flexible pipe, which is easy for
maintenance. Hence the same may be considered for
ICF AC coaches also.
Design to study -- Design To study
To be discussed
in the next
Customer meet.
![Page 69: MINUTES OF THE CUSTOMER INTERACTION MEETING · PDF fileICF ZONAL RAILWAYS RITES LTD/RDSO 1 ... of the modification in the coaches ... Rly wanted the cut-in date for new inlay](https://reader034.vdocuments.us/reader034/viewer/2022050813/5a70fa757f8b9ab6538c63d0/html5/thumbnails/69.jpg)
Sl.
No.
Reporting
Railways
Specific Item
InvolvedBrief Account of Problem
Action taken/Possible
Solutions
Implementaion
StatusAction by Minutes of the Meeting April 2014 Remarks
62CDO/BBS/ECo
R
Now a day when we purchase a motor cycle, they
provide a user catalogue for the convenience of the
user but the same is not being done in case of these
coaches. Hence it causes a lot of problems at ground
zero during maintenance. Hence user catalogue
containing specification, drawing number and source
of supply is to be provided with every coach for easy
procurement of spares for better maintenance.
Zonal Railways can
download the Rolling
Stock Certificates for
the individual
coaches.
-- -- -- closed