ministerial direction  · web viewschedule [number] to clause 45.06 development contributions plan...

3
[INSERT PLANNING SCHEME NAME] PLANNING SCHEME SCHEDULE [NUMBER] TO CLAUSE 45.06 DEVELOPMENT CONTRIBUTIONS PLAN OVERLAY Shown on the planning scheme map as DCPO[number]. NAME OF DEVELOPMENT CONTRIBUTIONS PLAN 1.0 Area covered by this development contributions plan Insert details of the area to which the plan applies. See 45.06-2 for relevant provisions. 2.0 Summary of costs Facility Total cost $ Time of provision Actual cost contribution attributable to development $ Proportion of cost attributable to development % Distributor roads $ Insert timing of provision $ Insert costs attributable to development % Traffic management works $ Insert timing of provision $ Insert costs attributable to development % Streetscape & environment $ Insert timing of provision $ Insert costs attributable to development % Parks $ Insert timing of provision $ Insert costs attributable to development % Active open space $ Insert timing of provision $ Insert costs attributable to development % Community activity centres $ Insert timing of provision $ Insert costs attributable to development % Drainage $ Insert timing of provision $ Insert costs attributable to development % Other $ Insert timing of $ Insert costs attributable OVERLAYS - CLAUSE 45.06 - SCHEDULE [NUMBER] PAGE 1 OF 3 25/05/2017 25/05/201 7 25/05/201 7

Upload: others

Post on 17-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MINISTERIAL DIRECTION  · Web viewSCHEDULE [NUMBER] TO CLAUSE 45.06 DEVELOPMENT CONTRIBUTIONS PLAN OVERLAY. Shown on the planning scheme map as DCPO[number]. Name of development

[INSERT PLANNING SCHEME NAME] PLANNING SCHEME

SCHEDULE [NUMBER] TO CLAUSE 45.06 DEVELOPMENT CONTRIBUTIONS PLAN OVERLAY

Shown on the planning scheme map as DCPO[number].

NAME OF DEVELOPMENT CONTRIBUTIONS PLAN

1.0 Area covered by this development contributions plan

Insert details of the area to which the plan applies.See 45.06-2 for relevant provisions.

2.0 Summary of costs

Facility Total cost $ Time of provision

Actual cost contribution attributable to development $

Proportion of cost attributable to development %

Distributor roads

$ Insert timing of provision

$ Insert costs attributable to development %

Traffic management works

$ Insert timing of provision

$ Insert costs attributable to development %

Streetscape & environment

$ Insert timing of provision

$ Insert costs attributable to development %

Parks $ Insert timing of provision

$ Insert costs attributable to development %

Active open space

$ Insert timing of provision

$ Insert costs attributable to development %

Community activity centres

$ Insert timing of provision

$ Insert costs attributable to development %

Drainage $ Insert timing of provision

$ Insert costs attributable to development %

Other $ Insert timing of provision

$ Insert costs attributable to development %

TOTAL $ - $ -

OVERLAYS - CLAUSE 45.06 - SCHEDULE [NUMBER] PAGE 1 OF 2

25/05/2017

25/05/2017

25/05/2017

Page 2: MINISTERIAL DIRECTION  · Web viewSCHEDULE [NUMBER] TO CLAUSE 45.06 DEVELOPMENT CONTRIBUTIONS PLAN OVERLAY. Shown on the planning scheme map as DCPO[number]. Name of development

[INSERT PLANNING SCHEME NAME] PLANNING SCHEME

3.0 Summary of contributions

Facility Levies payable by the development ($)

Developmentinfrastructure

Communityinfrastructure

Allinfrastructure

residential

non-residential

residential

non-residential

residential

non-residential

Distributor roads $ $ $ $ $ $

Traffic management works

$ $ $ $ $ $

Streetscape & environment

$ $ $ $ $ $

Parks $ $ $ $ $ $

Active open space $ $ $ $ $ $

Community activity centres

$ $ $ $ $ $

Drainage $ $ $ $ $ $

Other $ $ $ $ $ $

TOTAL $ $ $ $ $ $

Note: Levies payable should be specified appropriately, e.g. in $ per lot or $ per hectare.

4.0 Land or development excluded from development contributions plan

Where no requirements are specified insert “None specified.”orInsert details of land or development specifically excluded (such as the construction of a building, the construction or carrying out of works or a subdivision).See 45.06-1 for relevant provisions.

Note: This schedule sets out a summary of the costs and contributions prescribed in the development contributions plan. Refer to the incorporated development contributions plan for full details.

OVERLAYS - CLAUSE 45.06 - SCHEDULE [NUMBER] PAGE 2 OF 2

25/05/2017

25/05/2017