milliken daily report_10.28.16
TRANSCRIPT
Daily ObservationsMilliken Landfill Solar Project
Preparer: Robert FritzDate: 10.28.16 Weather: Overcast, high of 82, wind: W 11mphMangan personnel on site: Todd Boyle, Sam Anvari, Darrin (Tank) VaughnNumber of AeroTek personnel on site:
Deliveries to Site:
PLANNED WORK NEXT WEEK
• Continuation racking system assembly in Area 1 • Pouring concrete in Area 1• Install Panels in Area 1
SITE OBSERVATIONS
Area 1:Mangan CM: Todd/Sam/Dustin # Aerotek Personnel:
Area 2:Mangan CM: Todd/ Sam/Dustin # Aerotek Personnel: 26
Area 3:Mangan CM: Todd/ Sam/Dustin # Aerotek Personnel:
Visitors on site: Tina Insana and Shannon Williams (SB County)
OTHER NOTES:48% of panels now installed. (4,546 Panels of 9,460 now installed)75% of Tubs now poured (4,407 Tubs of 2,510 now poured)
•Complete Racking Erection•Complete QA/QC in area 3•Concrete Pouring Areas 2; begin Area 3)•Install Panels in Area 2+1
PLANNED WORK THIS WEEK
Work Performed:139 Panels Installed Concrete/Erection/QA-QC complete
Work Performed:
Work Performed:
0
200
400
600
800
1000
1200
1400
0
10
20
30
40
50
60
70
80
90
100
Daily
Uni
ts C
ompl
eted
Perc
ent C
ompl
ete
Daily Numberof Tubs filled
Daily Numberof PanelsInstalled
% TubsPoured
% PanelsInstalled
Rain Gauge installed
The county has expressed concern with these panels as they may interfere with Large equipment that may need to access this road.