millennium science complex...and 4th floors (mech. penthouse) •features a 3 bay x 3 bay opening...

70
MILLENNIUM SCIENCE COMPLEX AE SENIOR THESIS: IPD/BIM (2010-2011)

Upload: others

Post on 02-Jun-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

MILLENNIUM SCIENCE COMPLEX AE SENIOR THESIS: IPD/BIM (2010-2011)

Page 2: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Paul Kuehnel | Structural Mike Lucas | Electrical/Lighting Sara Pace | Mechancial Jon Brangan | Construction Management

The Pennsylvania State University Millennium Science Complex

Paul Kuehnel: Structural

Jon Brangan: Construction Management

Sara Pace: Mechanical

Mike Lucas: Electrical & Lighting

Page 3: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Building Overview IPD/BIM Thesis Design Goals Cantilever Design Façade Design Energy Modeling Reflection

Building Overview

• Location: University Park, PA • Construction Dates: June 2008 – June 2011 • Estimated Cost: $230 Million budgeted • Project Delivery Method: Design-Bid-Build • Size: 275,600 Square Feet • Type of Use: Science Complex

Page 4: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

IPD/BIM Thesis Design Goals Cantilever Design Façade Design Energy Modeling Reflection Building Overview

Integrated Project Delivery

• Weekly Meetings

• Project Work Spaces

• Essential Communication Tools

Page 5: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

IPD/BIM Thesis Design Goals Cantilever Design Façade Design Energy Modeling Reflection Building Overview

“Building Information Modeling is the process of generating and managing building data during it’s life cycle.” - Lee, Sacks and Eastman (2006)

What is BIM?

Page 6: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

IPD/BIM Thesis Design Goals Cantilever Design Façade Design Energy Modeling Reflection Building Overview

• 4D Modeling

• Sequencing

• Site Utilization

“Building Information Modeling is the process of generating and managing building data during it’s life cycle.” - Lee, Sacks and Eastman (2006)

What is BIM? Planning with BIM

Page 7: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

IPD/BIM Thesis Design Goals Cantilever Design Façade Design Energy Modeling Reflection Building Overview

• 3D Trade Coordination

“Building Information Modeling is the process of generating and managing building data during it’s life cycle.” - Lee, Sacks and Eastman (2006)

What is BIM? Construction & Coordination

Page 8: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

IPD/BIM Thesis Design Goals Cantilever Design Façade Design Energy Modeling Reflection Building Overview

• 3D Trade Coordination

• Clash Detection “Building Information Modeling is the process of generating and managing building data during it’s life cycle.” - Lee, Sacks and Eastman (2006)

What is BIM? Construction & Coordination

Page 9: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

IPD/BIM Thesis Design Goals Cantilever Design Façade Design Energy Modeling Reflection Building Overview

• 3D Trade Coordination

• Clash Detection

• Verifying Model Accuracy “Building Information Modeling is the process of generating and managing building data during it’s life cycle.” - Lee, Sacks and Eastman (2006)

What is BIM? Construction & Coordination

Page 10: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

IPD/BIM Thesis Design Goals Cantilever Design Façade Design Energy Modeling Reflection Building Overview

• Primary use of BIM Post-Construction

What is BIM? Facilities Management

“Building Information Modeling is the process of generating and managing building data during it’s life cycle.” - Lee, Sacks and Eastman (2006)

Page 11: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

IPD/BIM Thesis Design Goals Cantilever Design Façade Design Energy Modeling Reflection Building Overview

What is BIM? Facilities Management Family Product Information

“Building Information Modeling is the process of generating and managing building data during it’s life cycle.” - Lee, Sacks and Eastman (2006)

• Primary use of BIM Post-Construction

• F.M. Model Contains:

– Manufacturer Information

– Model Numbers

– Website Link

Page 12: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

IPD/BIM Thesis Design Goals Cantilever Design Façade Design Energy Modeling Reflection Building Overview

What is BIM? Facilities Management Family Product Information

“Building Information Modeling is the process of generating and managing building data during it’s life cycle.” - Lee, Sacks and Eastman (2006)

• Primary use of BIM Post-Construction

• F.M. Model Contains:

– Design Information

Page 13: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

IPD/BIM Thesis Design Goals Cantilever Design Façade Design Energy Modeling Reflection Building Overview

What is BIM? Facilities Management Family Product Information

“Building Information Modeling is the process of generating and managing building data during it’s life cycle.” - Lee, Sacks and Eastman (2006)

• Primary use of BIM Post-Construction

• F.M. Model Contains:

– Design Information

– Quantities

– Engineering Information

Page 14: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Design Goals IPD/BIM Thesis Cantilever Design Façade Design Energy Modeling Reflection Building Overview

• Areas of Focus

• BIM Project Execution Plan

– BIM/Project Goals

– BIM Uses

• Identify Metrics of Success

PRIORITY (HIGH/

MED/ LOW) GOAL DESCRIPTION POTENTIAL BIM USES

H Assess Cost Associated with Design

Changes Cost Estimation, Existing Conditions Modeling

H Increase Effectiveness of Design Design Authoring, Design Reviews, 3D Coordination, Engineering Analysis, Existing Conditions Modeling

H Interdisciplinary Design Coordination Design Reviews, 3D Coordination

M Increase Effectiveness of Sustainable

Goals Engineering Analysis, Daylight Integration

M Improve On-Site Coordination and

Efficiency Site Utilization Planning, 4D Modeling

PRIORITY (HIGH/ MED/

LOW) GOAL DESCRIPTION POTENTIAL BIM USES

H Assess Cost Associated with

Design Changes Cost Estimation, Existing Conditions

Modeling

H Increase Effectiveness of

Design

Design Authoring, Design Reviews, 3D Coordination, Engineering Analysis,

Existing Conditions Modeling

H Interdisciplinary Design

Coordination Design Reviews, 3D Coordination

Building Stimulus Design Goals

Page 15: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Cantilever Design IPD/BIM Thesis Design Goals Façade Design Energy Modeling Reflection Building Overview

Building Stimulus Cantilever Overview

• Main architectural feature of the building

• Intersection of Materials Sciences and Life Sciences

• Occupiable and Non-Occupiable space on 3rd and 4th floors (Mech. Penthouse)

• Features a 3 bay x 3 bay opening

• 3 isolated quiet labs below plaza

150 feet

Page 16: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Cantilever Design IPD/BIM Thesis Design Goals Façade Design Energy Modeling Reflection Building Overview

Building Stimulus Cantilever Design Goals

• Structure: Reduce steel and increase load path efficiency

• Lighting: Create an Inviting Entrance

• Construction: Increase Productivity

• Alternative Energy

Page 17: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Cantilever Design IPD/BIM Thesis Design Goals Façade Design Energy Modeling Reflection Building Overview

Building Stimulus Cantilever Structural Redesign

• SAP 2000 used to model the structural system of the cantilever

• Existing Conditions modeled and checked for:

– Member strength

– Overall Deflection

– Stiffness

Page 18: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Cantilever Design IPD/BIM Thesis Design Goals Façade Design Energy Modeling Reflection Building Overview

Building Stimulus Cantilever Structural Redesign

• SAP 2000 used to model the structural system of the cantilever

• Existing Conditions modeled and checked for:

– Member strength

– Overall Deflection

– Stiffness

Switch Braces to Tension

Increase in Deflection and Inefficiency of Load Path

Do not continue with Tension iteration, continue with Compression

Page 19: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Cantilever Design IPD/BIM Thesis Design Goals Façade Design Energy Modeling Reflection Building Overview

Frame Section Station P V2 V3 M2 M3 L K KL in Kip Kip Kip Kip-in Kip-in in

Frame 2.8 W14X257 341.104 -

1882.07 8.275 4.529 -999.241 -832.527 341.104 0.8 22.74

Frame 2.8 0 -

1898.65 -11.997 4.529 545.488 -1467.19

Pr Pc Pr/Pc Mr2 Mr3 px103 bxx103 byx103 Interaction

Eqn.

Kip-ft Kip-ft

-1898.652 2472.32 0.768 H1-1a -83.27 -122.27 0.404 0.508 0.964 0.9103 <1.0 OK

Building Stimulus Cantilever Structural Redesign

• SAP 2000 used to model the structural system of the cantilever

• Existing Conditions modeled and checked for:

– Member strength

– Overall Deflection

– Stiffness

Members Upsized Members Downsized

New Member

Page 20: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Cantilever Design IPD/BIM Thesis Design Goals Façade Design Energy Modeling Reflection Building Overview

Building Stimulus Cantilever Structural Redesign

• SAP 2000 used to model the structural system of the cantilever

• Existing Conditions modeled and checked for:

– Member strength

– Overall Deflection

– Stiffness

Existing Redesign

Frame 2 5 2 5

P 1000 1000 1000 1000

U 11.5141 12.8985 12.9544 11.7441

K 0.011514 0.012899 0.012954 0.011744

% diff 11.34 9.80

• Redesigned trusses to have similar

stiffness for load sharing • Result: percent difference in

stiffness less than 10%

Page 21: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Cantilever Design IPD/BIM Thesis Design Goals Façade Design Energy Modeling Reflection Building Overview

Exterior Plaza Lighting Design Plan View Section View

Page 22: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Cantilever Design IPD/BIM Thesis Design Goals Façade Design Energy Modeling Reflection Building Overview

Exterior Plaza Lighting Design Plan View Section View

Page 23: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Cantilever Design IPD/BIM Thesis Design Goals Façade Design Energy Modeling Reflection Building Overview

Exterior Plaza Lighting Design Plan View Section View

Page 24: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Cantilever Design IPD/BIM Thesis Design Goals Façade Design Energy Modeling Reflection Building Overview

Exterior Plaza Lighting Design Plan View Section View

Page 25: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Cantilever Design IPD/BIM Thesis Design Goals Façade Design Energy Modeling Reflection Building Overview

Exterior Plaza Lighting Design Plan View Section View

Page 26: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Cantilever Design IPD/BIM Thesis Design Goals Façade Design Energy Modeling Reflection Building Overview

Exterior Plaza Lighting Design Plan View Section View Color Rendering

Page 27: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Cantilever Design IPD/BIM Thesis Design Goals Façade Design Energy Modeling Reflection Building Overview

Exterior Plaza Lighting Design Plan View Section View Pseudo Color Rendering

Page 28: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Cantilever Design IPD/BIM Thesis Design Goals Façade Design Energy Modeling Reflection Building Overview

Wind Turbine Analysis

Z-Plane : 0.5 m Z-Plane : 24 m

Model

• Domain Size: 900 x 900 x 100 m

• Standard K-ε Chen Model

• Hybrid Scheme

Simulation Results

• Grid Size: 107 x 108 x 20

• Iterations: 5000

• Duration: 4 hrs. 22 min

• % Mass Residual: 0.0906%

Page 29: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Cantilever Design IPD/BIM Thesis Design Goals Façade Design Energy Modeling Reflection Building Overview

Wind Turbine Analysis

Z-Plane : 30 m

Grid Size: 123 x 134 x 22 Iterations: 3000 Duration: 4 hrs. 48 min Mass Residual: 0.166%

• Start-up Speed: 3.58 m/s

• 1200 kWh/year at 5 m/s

• Spacing Requirements: 22 ft

Cascade Swift Wind Turbine

• 18 turbines

• Total Array: 21,600 kWh/year

• Cost: $8,500/unit

• Total savings: $1,624

Final Results

Page 30: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Façade Design IPD/BIM Thesis Design Goals Cantilever Design Energy Modeling Reflection Building Overview

• Increase Thermal Efficiency

• Reduce Precast Panel Weight

• Create Efficient Construction Process

• Daylighting Integration& User Comfort

Building Stimulus Façade Design Goals

Page 31: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Façade Design IPD/BIM Thesis Design Goals Cantilever Design Energy Modeling Reflection Building Overview

• Two Glazing Configurations

• Large Cavity Space

– Thermal Barrier

– Daylighting Integration

Double Skin Facade

Page 32: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Façade Design IPD/BIM Thesis Design Goals Cantilever Design Energy Modeling Reflection Building Overview

Daylighting Integration Building Orientation

N

Double Skin Facade

Single Skin Facade

Double Skin Shading System Shading Control

• Girasol System

• Requires No Electricity

Page 33: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Façade Design IPD/BIM Thesis Design Goals Cantilever Design Energy Modeling Reflection Building Overview

Daylighting Integration Building Orientation

N

Double Skin Facade

Single Skin Facade

Double Skin Shading System

Page 34: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Façade Design IPD/BIM Thesis Design Goals Cantilever Design Energy Modeling Reflection Building Overview

Daylighting Integration Building Orientation

N

Double Skin Facade

Single Skin Facade

Student Study Area & Corridor Layout Pseudo Color Rendering – 6.21 10AM

Page 35: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Façade Design IPD/BIM Thesis Design Goals Cantilever Design Energy Modeling Reflection Building Overview

Daylighting Integration Building Orientation

N

Double Skin Facade

Single Skin Facade

Student Study Area & Corridor Layout Color Rendering – 6.21 10AM

Page 36: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Façade Design IPD/BIM Thesis Design Goals Cantilever Design Energy Modeling Reflection Building Overview

0 100,000 200,000 300,000 400,000 500,000

New Façade

Original

Heat Gain (BTU/hr)

Solar Heat Gain from Glass

Energy Performance

N

Double Skin Facade

Single Skin Facade

Page 37: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Façade Design IPD/BIM Thesis Design Goals Cantilever Design Energy Modeling Reflection Building Overview

660,000 665,000 670,000 675,000 680,000 685,000 690,000

New Façade

Original

Electricity (kWh)

Electricity Consumption

Energy Performance

N

Double Skin Facade

Single Skin Facade

Page 38: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Façade Design IPD/BIM Thesis Design Goals Cantilever Design Energy Modeling Reflection Building Overview

0 2,000 4,000 6,000 8,000 10,000 12,000 14,000

New Façade

Original

Energy (MBTU)

Third Floor Energy Consumption

Building

Source

Energy Performance

N

Double Skin Facade

Single Skin Facade

Page 39: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Façade Design IPD/BIM Thesis Design Goals Cantilever Design Energy Modeling Reflection Building Overview

2,350,000 2,450,000 2,550,000 2,650,000 2,750,000

New Façade

Original

lbm/year

HVAC Associated CO2 Emissions

Energy Performance

N

Double Skin Facade

Single Skin Facade

Page 40: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Façade Design IPD/BIM Thesis Design Goals Cantilever Design Energy Modeling Reflection Building Overview

$0 $10,000 $20,000 $30,000 $40,000 $50,000 $60,000

New Façade

Original

Cost

Yearly Utility Cost for Third Floor

Electricity

Chilled Water

Steam

Energy Performance

N

Double Skin Facade

Single Skin Facade

Page 41: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Façade Design IPD/BIM Thesis Design Goals Cantilever Design Energy Modeling Reflection Building Overview

• Reduce weight of panel

• 24 in. air gap between inner face of precast panel and outer face of interior wall.

• Maintain continuous vertical air gap

• No cracking under transportation, construction, or service loads

Precast Panel Design Design Goals/Tolerances Existing Precast Panel Panel Material Research

Page 42: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Façade Design IPD/BIM Thesis Design Goals Cantilever Design Energy Modeling Reflection Building Overview

• Reduce weight of panel

• 24 in. air gap between inner face of precast panel and outer face of interior wall.

• Maintain continuous vertical air gap

• No cracking under transportation, construction, or service loads

Precast Panel Design Design Goals/Tolerances Precast Panel Iterations

SW

SW

Page 43: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Façade Design IPD/BIM Thesis Design Goals Cantilever Design Energy Modeling Reflection Building Overview

• Reduce weight of panel

• 24 in. air gap between inner face of precast panel and outer face of interior wall.

• Maintain continuous vertical air gap

• No cracking under transportation, construction, or service loads

Precast Panel Design Design Goals/Tolerances Precast Panel Final Design

• f’c = 5000 psi

• fr = 353.55 psi with FOS = 1.5 (PCI p363)

• Slab Thickness = 6 in

• End Rib Dimensions = 6 in x 12 in

• Mid Rib Dimensions = 8 in x 12 in

Page 44: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Façade Design IPD/BIM Thesis Design Goals Cantilever Design Energy Modeling Reflection Building Overview

• Reduce weight of panel

• 24 in. air gap between inner face of precast panel and outer face of interior wall.

• Maintain continuous vertical air gap

• No cracking under transportation, construction, or service loads

Precast Panel Design Design Goals/Tolerances Precast Panel Final Design

Page 45: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Façade Design IPD/BIM Thesis Design Goals Cantilever Design Energy Modeling Reflection Building Overview

• Reduce weight of panel

• 24 in. air gap between inner face of precast panel and outer face of interior wall.

• Maintain continuous vertical air gap

• No cracking under transportation, construction, or service loads

Precast Panel Design Design Goals/Tolerances Precast Panel Final Design – Constructability

• Steel stud perimeter wall

• Interior Wall

• Insulation

• Vapor Barrier

• Interior Glazing

• Precast Panel

• Exterior Glazing

Page 46: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Façade Design IPD/BIM Thesis Design Goals Cantilever Design Energy Modeling Reflection Building Overview

• Reduce weight of panel

• 24 in. air gap between inner face of precast panel and outer face of interior wall.

• Maintain continuous vertical air gap

• No cracking under transportation, construction, or service loads

Precast Panel Design Design Goals/Tolerances Original Panel Installation Sequence

Page 47: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Façade Design IPD/BIM Thesis Design Goals Cantilever Design Energy Modeling Reflection Building Overview

• Reduce weight of panel

• 24 in. air gap between inner face of precast panel and outer face of interior wall.

• Maintain continuous vertical air gap

• No cracking under transportation, construction, or service loads

Precast Panel Design Design Goals/Tolerances Original Panel Installation Sequence Double Skin Panel Installation Sequence

Page 48: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Façade Design IPD/BIM Thesis Design Goals Cantilever Design Energy Modeling Reflection Building Overview

Precast Panel Design Design Goals/Tolerances

4D Model

Double Skin Panel Installation Sequence

• Reduce weight of panel

• 24 in. air gap between inner face of precast panel and outer face of interior wall.

• Maintain continuous vertical air gap

• No cracking under transportation, construction, or service loads

Page 49: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Façade Design IPD/BIM Thesis Design Goals Cantilever Design Energy Modeling Reflection Building Overview

System Total Proposed Original Difference

Panels $ 5,629,240 $ 6,007,802 $ (378,562)

Insulation $ 842,792 $ 741,948 $ 100,844

Caulking $ 204,081 $ 168,917 $ 35,164

Louvers $ 123,200 $ 366,600 $ (243,400)

Windows $ 3,277,210 $ 2,719,570 $ 557,640

Total $ 15,429,539 $ 15,357,852 $ 71,687

Precast Panel Design Design Goals/Tolerances Panel Design Cost Enclosure System Cost

• Reduce weight of panel

• 24 in. air gap between inner face of precast panel and outer face of interior wall.

• Maintain continuous vertical air gap

• No cracking under transportation, construction, or service loads

Redesign Original Difference

Panel Design $ 5,034,645 $ 5,492,340 $ (457,695)

Connections $ 181,250 $ 150,000 $ 31,250

Total $ 5,629,240 $ 6,007,802 $ (378,562)

Page 50: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Façade Design IPD/BIM Thesis Design Goals Cantilever Design Energy Modeling Reflection Building Overview

• Reduce Energy Consumption

• Lighting and Mechanical Integration

• Simulate a More Realistic Energy Profile

Building Stimulus Energy Modeling Design Goals

Page 51: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Energy Modeling IPD/BIM Thesis Design Goals Cantilever Design Façade Design Reflection Building Overview

• ASHRAE LPD’s

• ASHRAE MPD’s

• Existing Systems

Base Model

• Preliminary Façade

• Preliminary Daylighting

Progress Model 1

• Final Facade

• Chilled Beam Addition

Progress Model 2

• Electrical Loads

Final Model

MEP Information Exchange

Page 52: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Energy Modeling IPD/BIM Thesis Design Goals Cantilever Design Façade Design Reflection Building Overview

Chilled Beams

• ASHRAE LPD’s

• ASHRAE MPD’s

• Existing Systems

Base Model

• Preliminary Façade

• Preliminary Daylighting

Progress Model 1

• Final Facade

• Chilled Beam Addition

Progress Model 2

• Electrical Loads

Final Model

Page 53: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Energy Modeling IPD/BIM Thesis Design Goals Cantilever Design Façade Design Reflection Building Overview

Chilled Beams

• ASHRAE LPD’s

• ASHRAE MPD’s

• Existing Systems

Base Model

• Preliminary Façade

• Preliminary Daylighting

Progress Model 1

• Final Facade

• Chilled Beam Addition

Progress Model 2

• Electrical Loads

Final Model

Page 54: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Energy Modeling IPD/BIM Thesis Design Goals Cantilever Design Façade Design Reflection Building Overview

Chilled Beams

7,618

7,441

12,431

12,235

0 2,000 4,000 6,000 8,000 10,000 12,000 14,000

Original

Chilled Beams

Energy Consumption (MBtu)

Energy Consumption for Third Floor

Source

Building

• ASHRAE LPD’s

• ASHRAE MPD’s

• Existing Systems

Base Model

• Preliminary Façade

• Preliminary Daylighting

Progress Model 1

• Final Facade

• Chilled Beam Addition

Progress Model 2

• Electrical Loads

Final Model

Page 55: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Energy Modeling IPD/BIM Thesis Design Goals Cantilever Design Façade Design Reflection Building Overview

Chilled Beams

684,280

666,682

650,000 660,000 670,000 680,000 690,000

Original

Chilled Beam

Electricity (kWh)

Electricity Consumption for Third Floor

• ASHRAE LPD’s

• ASHRAE MPD’s

• Existing Systems

Base Model

• Preliminary Façade

• Preliminary Daylighting

Progress Model 1

• Final Facade

• Chilled Beam Addition

Progress Model 2

• Electrical Loads

Final Model

Page 56: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Energy Modeling IPD/BIM Thesis Design Goals Cantilever Design Façade Design Reflection Building Overview

Chilled Beams

$51,437

$50,115

$52,530

$40,809

$19,778

$17,101

$0 $15,000 $30,000 $45,000 $60,000

Original

Chilled Beam

Utility Cost

Yearly Utility Cost for Third Floor

Purchased Steam

Purchased Chilled Water

Electricity

• ASHRAE LPD’s

• ASHRAE MPD’s

• Existing Systems

Base Model

• Preliminary Façade

• Preliminary Daylighting

Progress Model 1

• Final Facade

• Chilled Beam Addition

Progress Model 2

• Electrical Loads

Final Model

Page 57: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Energy Modeling IPD/BIM Thesis Design Goals Cantilever Design Façade Design Reflection Building Overview

Chilled Beam Luminaire Integration Private Office Floorplan Color Render Chilled Beam Luminaire

Page 58: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Energy Modeling IPD/BIM Thesis Design Goals Cantilever Design Façade Design Reflection Building Overview

Chilled Beam Luminaire Integration Private Office Floorplan Color Render Illuminance Pseudo Color

Page 59: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Energy Modeling IPD/BIM Thesis Design Goals Cantilever Design Façade Design Reflection Building Overview

Chilled Beam Luminaire Integration Private Office Floorplan Color Render Illuminance Pseudo Color

Page 60: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Energy Modeling IPD/BIM Thesis Design Goals Cantilever Design Façade Design Reflection Building Overview

Determining Existing Plug Loads

Page 61: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Energy Modeling IPD/BIM Thesis Design Goals Cantilever Design Façade Design Reflection Building Overview

Determining Existing Plug Loads Modeling Electrical Information In Revit

Exporting to Trace

Existing Panel Schedule

Page 62: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Energy Modeling IPD/BIM Thesis Design Goals Cantilever Design Façade Design Reflection Building Overview

Determining Existing Plug Loads Modeling Electrical Information In Revit

Existing Panel Schedule

0 2,000,000 4,000,000 6,000,000 8,000,000 10,000,000

Original

New Plug Loads

kBTU/yr

Receptacle Energy Consumption (3rd Floor)

Page 63: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Energy Modeling IPD/BIM Thesis Design Goals Cantilever Design Façade Design Reflection Building Overview

Determining Existing Plug Loads Modeling Electrical Information In Revit

0 2,000,000 4,000,000 6,000,000 8,000,000 10,000,000

Original

New Plug Loads

kBTU/yr

Receptacle Energy Consumption (3rd Floor)

• ASHRAE LPD’s

• ASHRAE MPD’s

• Existing Systems

Base Model

• Preliminary Façade

• Preliminary Daylighting

Progress Model 1

• Final Facade

• Chilled Beam Addition

Progress Model 2

• Electrical Loads

Final Model

Page 64: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Energy Modeling IPD/BIM Thesis Design Goals Cantilever Design Façade Design Reflection Building Overview

Determining Existing Plug Loads

0 2,000,000 4,000,000 6,000,000 8,000,000 10,000,000

Original

New Plug Loads

kBTU/yr

Receptacle Energy Consumption (3rd Floor)

• ASHRAE LPD’s

• ASHRAE MPD’s

• Existing Systems

Base Model

• Preliminary Façade

• Preliminary Daylighting

Progress Model 1

• Final Facade

• Chilled Beam Addition

Progress Model 2

• Electrical Loads

Final Model

0 5,000,000 10,000,000 15,000,000 20,000,000

Base Model

Progress Model 1

Progress Model 2

Final Model

kWh

Electricity Consumption for Building

Page 65: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Energy Modeling IPD/BIM Thesis Design Goals Cantilever Design Façade Design Reflection Building Overview

Determining Existing Plug Loads

0 5,000,000 10,000,000 15,000,000 20,000,000

Base Model

Progress Model 1

Progress Model 2

Final Model

kWh

Electricity Consumption for Building

• ASHRAE LPD’s

• ASHRAE MPD’s

• Existing Systems

Base Model

• Preliminary Façade

• Preliminary Daylighting

Progress Model 1

• Final Facade

• Chilled Beam Addition

Progress Model 2

• Electrical Loads

Final Model

15,720,000 15,740,000 15,760,000 15,780,000 15,800,000 15,820,000

Base Model

Final Model

kWh

Electricity Consumption for Building

Page 66: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Energy Modeling IPD/BIM Thesis Design Goals Cantilever Design Façade Design Reflection Building Overview

Determining Existing Plug Loads

• ASHRAE LPD’s

• ASHRAE MPD’s

• Existing Systems

Base Model

• Preliminary Façade

• Preliminary Daylighting

Progress Model 1

• Final Facade

• Chilled Beam Addition

Progress Model 2

• Electrical Loads

Final Model

41,800,000 42,200,000 42,600,000 43,000,000

Base Model

Final Model

lbm/year

Building CO2 Emissions

15,720,000 15,740,000 15,760,000 15,780,000 15,800,000 15,820,000

Base Model

Final Model

kWh

Electricity Consumption for Building

Page 67: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Energy Modeling IPD/BIM Thesis Design Goals Cantilever Design Façade Design Reflection Building Overview

Determining Existing Plug Loads

• ASHRAE LPD’s

• ASHRAE MPD’s

• Existing Systems

Base Model

• Preliminary Façade

• Preliminary Daylighting

Progress Model 1

• Final Facade

• Chilled Beam Addition

Progress Model 2

• Electrical Loads

Final Model

$2,000,000 $2,100,000 $2,200,000 $2,300,000

Base Model

Final Model

Total Building Utility Costs

41,800,000 42,200,000 42,600,000 43,000,000

Base Model

Final Model

lbm/year

Building CO2 Emissions

Page 68: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

Reflection IPD/BIM Thesis Design Goals Cantilever Design Façade Design Energy Modeling Building Overview

• Primary Energy Use Reduction (MBtu/yr)

• Reduced Life Cycle Cost

• Meet ASHRAE Lighting Power Densities

• Alternative Energy Implemented

• Steel Tonnage Reduced

• Truss Design Efficiency Increased

• Lighting Design

– Emphasize Architectural Features and Entrance

• Peak Envelope Loads Reduction – Cooling Load

– Heating Load

• Reduce Panel Weight

• Daylight Integration – Improve Visual Comfort

– Improve Overall Appearance

– Reduce Solar Heat Gain

• Minimize Constructability Issues

Metrics of Success and Reflection Façade Redesign Cantilever Redesign Energy Usage

Page 69: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

• Thorton Tomasetti Engineers • Rafael Viñoly Architects • Flak & Kurtz • Bob Biter Electric • Whiting Turner • Eric Mitchel (Mechanical P.M. - Flak & Kurtz) • Josh Miller (B.I.M. Coordinator at Gilbane) • Chris Dolan (Whiting Turner) • Adam Fry (Electrical P.M. at Mueller Associates) • Stephanie Hill (M.E.at Mueller Associates) • Matthew Danowski (M.E.at Mueller Associates)

The Pennsylvania State University Millennium Science Complex

• Randy Phillips Central Regional Manager, Semco Flaktwoods

• John Jackson (HOK) • Corey Wilkinson for quick and successful responses to

countless computer issues. • Members of BIMCeption • Members of K.G.B. Maser • Last but not least, all friends and family

Page 70: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout

QUESTIONS & COMMENTS AE SENIOR THESIS: IPD/BIM (2010-2011)