August 12 │ Lab Project 2
Background
• As part of Assessment of Global Project to build laboratory facility representative in Asia
• To covered demand of Laboratory need for Trial, Experiment and Develop new Product of Coating Chemicals
• Business Needs
│ Lab ProjectAugust 12 4
Issues in Fishbone
Lab Project Indonesia
IT not involved at Kick off Meeting
Tight TimelineDue date
End of October
Short interval of request network installation and
implementation
Design network maps based on final layout
Project Manager
Lack of Information
Project Manager not aware of Important IT
Process need
Timel
ine
Required time for Procurement devices
(network, workstation devices) In
done
sia In
frastr
uctu
re
Network core installation
Network demographyc in Indonesia
│ Lab ProjectAugust 12 5
Conclusion
Based on Fish bones process,- Meeting and talk with Project Manager with advise from network team- Decide to the best option and reliable of business needs with considering the cost
• Access @site solution. It’s VPN Tunnel solution (Based on Indonesia Infrastructure)Pros : No WAN cost, Low cost Implement, support SAP Print, IPT phones, E-mail, Files share. Cons : Support will be handled by Global IT team, need extra time for troubleshoot if any issues found
Current situation?