Process Mechanical Piping Civil/Structural Instrumentation & Control Electrical
Establish Process Design Basis Preliminary Equipment List - Issue for DBM Preliminary Plot Plan Varification of Site Selection I&C Inputs for DBM - IFRElectrical infrastructure and Requirements
Defined
Client business drivers identified Historical mechanical data collected Codes and Standards defined Civil/Structural design criteria definedClient input about Opetations, Control
Phylosophy receivedCodes and Standards defined
Site data collected (
elecations,temperatures)
Dimensions, weighs rough sized in process
engineeringFire protection requirements defined Modularization strategy defined Control Phylosophy defined Local site conditions and profile received
Licensors identified PFD's IFR received Building enclosure philosophy determinedUnderground and above ground existing
facilities identified
Preliminary Control system architecture
issuedPreliminary horsepower data received
Feedstock information collected (
composition, rate,etc.)MSD's - IFR Meteorological data received
Meteorological ( snow, wind etc.)
information compiledStandard & Specification defined
Electrical power studies to define
requirements
Process design criteria identified Vendor packaged equipments identified Existing facilities information collected Preliminary geotechnical report receicedPreliminary Control systen functional
specifications definedPreliminery Electrical equipment list
Product information prepared Critical/long delivery items identified Historical plot plan data collected Land issues involved Control building preliminary sized
Electrical
underground,aboveground,substation
information received
Sparing phylosophy definedLegal and regulatory requirements
determined
Topographic information/ co-ordinates (
under/above ) ground received
Regulatory issues (three level government,
environmental etc.Preliminary PFD's received Electrical design criteria defined
Environmental consideratuiins identifiedSpacing guidelines (
Installation,Hazards,etc.) establishedSite infrastructure information collected
Major equipment process data sheets
received
Preliminary Equipment Pricing ( Quotes ) PFD's IFA receivedTransportation/logistic issues information
collectedCritical inline devices identified Area Classification - IFR
Process Flow Diagram Functional Mechanical specifications Main piping tie-ins identifiedPreliminary plot plan issued by plant layout
(with civil/structural inputPFD IFD received
Licencer information reviewed Mechanical sparing philosophy defined Equipment preliminary data received Preliminary Instrument Index Plot Plan IFR RECEIVED
Heat and material balance completed Vendor list approvedHazardous equipment location analysis
completedCivil input for Plot Plan IFR Instrument tagging procedure Process input to area classification received
Major equipment identified and preliminary
sizing
Process data/rouph equipment datasheets
completed
Civil/Structural input (
ditches,roads,drainage,geotechnical, etc.)Preliminary site grading P&ID's IFD received
Control phylosophy udentified and
preliminary sizing
Critical equipments shop fabrication
milestone identified
Electrical and instrumentation layout input
received
Process input on fire water system and
drainage receivedInline device data sheets IFR Load list - IFD
Control Phylosophy decided ( Including
DCS, PLC etc.Client infrastructurerequirements identified Fire water system layout Area classification IFR received P&ID's IFD received, horsepower defined
Material selection guideline issuedEquipment data sheets-IFQ/Equipment list -
IFDConstruction input received Sewers/drainage system layout Pipe specifications received Equipment list - IFD received
Preliminary tie-in pointsidentifiedMDMT and other temperature design criteria
defined
Logistics and Shipping constraints study
receivedMajor equipment preliminary size received Process and Equipment data received Preliminart electrical vendor information
Modularizationstrategy received
Plot Plan - IFD
Preliminary utility balance MSD's - IFD Spacing guideline/Codes received Control systen I/O Index defined Lighting load estimated
VIP review and simplification completed PFD's-IFD received Plot Plan - PFD Main pipe racks preliminary sized Control system architecture development Heat tracing load estimated
P&ID's IFR receivedField survey of geometer reference points
receivedPreliminary large bore pipe layour received
Shut-down key matrix ( cause and effects)
generated from indexAll electrical load defined
DBM (FEED) items Preliminary hydraulic calculations completed Main pipe racks sizedConstruction and Operational access and
egress studied
Package equipment instrument
specifications issued
Winterization philosophy decided Plot-plan - IFR receivedModularization execution plan ( racks, etc )
establishedLay down areas identified Single Line Diagrams IFD
Start-up/Shutdown philosophy published Sparing philosophy and spare parts definedEquipment datasheets (esp, compressors,
pumps etc) receivedCable tray routing identified Purchase inline devices Modularization strategy defined
Preliminary drivers identified Area classification drawing - IFD received P & ID's IFR receivedTransportation, lifting and logistic issues
definedVendor list approved Eletrical Equipment datasheets IFD
Process datasheets finished Modularization plan defined Material selection diagram received Process hydraulic calculation received Scope and Specification finalized
Process hazard analysis completed Battery limit conditions defined Piping studies for critical lines Civil Input for Plot Plan ifd Piping specifications IFD received Electrical bidders list approved
Process logic discription finished Specification and standards issued Fire hazards areas defined Major building (size, location)finalized Final process data provided to instruments
data sheetsElectrical control schematics IFD
Preliminary material selection digram
issued
Packaged equipment instrument spacs
issuedPlot plan client review approval
Major pipe racks and large bore piping
design frozen ( including stress design)Area classifications IFD received Electrical control pjhilosophy issued
Piping material classes published P & ID's IFD receivedUnderground scope, location and services
identifiedClient review and approval of datasheets
Mechanical vendor information/packed
equipment information received
Stream information firm Equipment issued for purchase All undergrounds receivedElectrical underground, aboneground
substation information receivedBidder's specifications/vendor data IFD Variable frequency drive requirement defined
Drafp DBM for reviewAll equipment data sheets issued for
purchaseHydro test phylosophy defined
Preliminary vendor data (major vessels,
equipment )receivedSparing philosophy finalized
Client/opetations input received Vendor quotes ( data drawings ) finished Major equipment coordinates frozen Access/ egress finalized and confirmed Control system purchase Vendor list approved
Front-end PFD Frozen Shop fabrication schedule Major cable routing frozen I/O count / loop drawings IFD Area clarricication IFD
Process flow diagram - IFD Technical evaluation finalized Plot plan - IFC Major equipment coordinates received Shutdowm keys IFC
DBM Document issuedCommercial review input (bid summaries ,
reccomendations client approvalFinal vendor dimensional data collected
Preliminary mechanical equipment loads (
static and dynamic) and GA's received
Marshalling Philosophy issued and
approved Cable and Tray Schedule IFC
General arrangement - PFD Building sizing and layout receivedPreliminary electrical equipment loads and
G.A's receivedControl system hardware footprint defined Cable tray routing/location defined
P&ID's and UFD's - IFR Hydraulic calculations finalizedFinal civil, road and drainage drawing
received
Preliminary piping drawing (rack,
underground stress )receivedPanel layouts / termination issued Plot plan IFC received
Mechanical equipment identification and
sized
Logistics input - lifting,
transportation,routing,receiving and storageHeat trading LTD's IFD
Pollution abatement ( equipment and
facilities definedElectrical equipment layout IFC
Discipline - Specific specification and
standards publishedClient operation and maintence review Inline components defined Loading diagrams defined Control room layout IFD Control systems layout IFC received
Battery limit tables finishedCommissioning support - review of spare
parts, training process and vendor supportLarge bore stress analysis completed All juction box lacations defined
All tie-ins identifiedLarge bore piping design and layout
completedRough Grading Plan IFC Instrument Index - IFC
Certified packaged equipment Electrical data
received
Lines -sized specified Vendor certified data Utility piping definition copleted Logic/control narratives received Piping layout and/3D Model completed
Relief requirements identified Equipment list finalized Electrical single line IFD received Deep underground IFC FAT procedures and test plan defined Single line diagrams IFC
Major instrument list commenced Data lists finalizedElectrical, I & C Cable trays requirements
and data receivedP&ID's IFC received
Other systems defined (CCTV, fire systems,
LAN). Third party input completed
Major valves identified Vendor data finalized Input of plot plan - IFC All I&C Purchase orders issued
Major control valves identified and sized Scope of specification finalized Tie - in list IFC Electrical Heat Tracing ISO''s
Licencer P&ID reviewed Start-up and commissioning plan defined P& ID's - IFC received Pilling - IFC FAT Piping ISO's IFC received
Pressure relief valves preliminary sized LTD's IFC's received Structural pipe rack model All graphics built MSO Material Selection Diagram
HT- & I requirements identifiedPre-Commissioninf/
commissioning/Commissioning plan
Survey of pipe wall thickness - Metallurgy
receivedPreliminary structural design Configuration completed MTO Material Take Offs
Manufacturing records ( as built data-
book,certified perfomance) compiledOperations philosophy received Foundajtions drawings NDE Non Destructive Examination
P&ID's, UFD's and TD's -IFD Operations manuals finalizedSchedule of plant planned shutdown
receivedEquipment loads and GA's received GLOSSARY OEM Original Equipment Manufacturer
Flare and relief calculations and completed OEM supportClient approval for operations and
engineering
Underground piping and electrical locations
fixedDBM Design Basis Memorandum P&ID Process and Instrument Diagram
All client input completed Large bore pipe stress design frozen CCTV Closed Circuit TV PFD Process Flow Diagram
Hydraulic calculations finished Final client model/layout reviewInstallation plan (Hoisting and craning
requirementsdefinedFAT Factory Acceptance Test PRV Pressure Relief Valve
VIP's implemented as applicable Plot plan IFC FEEDFront End Engineering Design (Includes
FEL 2 & 3 )SIL Safety, Intergrity Level
Start - up system defined Large bore piping layout completed Foundations/Sitework Concrete IFC FEL Front End Loading SOC Supplier of Choice
Shut-down keys defined Large bore stress analysis finishedFinal Mechanical Equipment loads ( static &
dynamic) and GA's receivedGA Genetal Arrangement UFD Utility Flow Diagram
Final line sizing by process engineering P&ID's - IFCFinal Electrical equipment loads and GA's
receivedHAZOP Hazard and Operation analysis IPS Uninterrupted Power Supply
Final control valve and PRV sizing All hydraulic calculations completedPiping drawings IFC (
rack,underground,stress) receivedHT&I Heat tracing and Insulation VIP Valve Improving Practices
HAZOPP review held Structural - pipe racks modeledAll penetrations and embeds identified by
other disciplinesHVAC Heating, Ventilation, Air Conditioning
SIL review held ( if applicable) Equipment modules design finalizedVendor package equipment loads and GA's
CERTIFIEDIFC Issued for Construction
Vendor data received Building design IFD IFD Issued for Design IPA Definitions
P&ID's IFC Electrical tray modeled IFQ Issued for Quotation
Final equipment list applicable Clash analysis completed Structural steel IFC IFR Issued for Review
Detailed vendor's information (Specification
sheet,datasheet,auxilaries,utitilities) receivedConstructability review completed
pIping drawing IFC (RACK,
underground,stress)IPA Independent Project Analysis Inc. IPA Definitions
HAZOP issued resolvedOperations and Maintenance (O & M) review
completedHVAC Drawing IFC ISO Isometric Drawings FEL 1 (Block Flow)
Vessel levels finalized (Operations &
Elevations)IFC line list completed Mechanical drawings IFD LAN Local Area Network FEL 2 ( Process Flow)
Critical small bore piping (high
pressure,Toxic, utility/tracing etc. identified
and mideled
Final electrical epuipment load and gas
receivedLDT Line Designation Table FEL 3 ( P & ID's)
Operating guidelines defined Inline componenets includedVendor package equipment loads and GA's
certifiedMDMT Minimum Design Metal Temperature Detailed Design
Commussioning/Start-up assistance
plannedAll large bore valves indicated Building design IFD
Location for cable trays identified Small bore piping routing completed
Secondary supports indicated
Review Structure Steel Shop Drawing
First ISO Issue
Certified vendor equipment drawings
received\Final Grading and Paving IFC
Welding hydro equipment drawings received Civil drawing IFC (fencing , signage)
Welding hydro test and NDE specifications
IFC
All piping details and standards IFC
(Supports, hangers,etc)
MSD IFC
MILESTONE CHECKLIST
Contruction Field Rework: Total direct cost of redoing work in the field regardless of initiating cause of saurce
-
Fabrication philosophy determined (
field/shop)