mile stonewise work programe and required qty

1
Date : 30.04.2015 1-Sep-15 17-Sep-15 17 9-Nov-15 19-Nov-15 11 20-Jan-16 2-Mar-16 42 5-Mar-16 14-Apr-16 40 2-Apr-16 26-Apr-16 24 27-Apr-16 25-Jun-16 59 193 ITEM DESCRIPTION UNIT B.O.Q. QTY New DESIGNQ TY No. Of Days required to complete including installation, testing and commissioning Milestone 03 qty (30/09/2015) Start Date End Date Total Duration Milestone 04 qty (30/11/2015) Start Date End Date Total Duration Milestone 06 qty (01/03/2016) Start Date End Date Total Duration Milestone S/S qty (25/04/2016) Start Date End Date Total Duration Completion of section 01 qty (25/05/2016) Start Date End Date Total Duration Completion of section 02 qty (09/07/2016) Start Date End Date Total Duration 010 Electrical Distribution A Lighting Service Cabinet (turrets) SC01/08 No. 8 8 14 12-14 weeks - - - - 6.00 27-Apr-16 5-May-16 2.00 11-May-16 19-May-16 - - - - - B 500kVA Transformer No. 1 1 5 - - - 1.00 21-Mar-16 24-Mar-16 - - 1000kVA Transformer No. 1 1 5 16-18 weeks - - - 1.00 21-Mar-16 24-Mar-16 - - 2000kVATransformer No. 2 - - - - - - - - - - - C Medium voltage Switchgear No. 4 2 14 28-30 weeks - - - 2.00 21-Mar-16 31-Mar-16 - - - - - - - D 22kv Cabling m 5,035 3,920 18 12-14 weeks - - 3,920.00 20-Jan-16 10-Feb-16 - - - - - - - - E Low Voltage Switchboard compact station TA 1/4 No. 4 2 3 12-14 weeks - - - 2.00 5-Mar-16 16-Mar-16 - - - - - - - F Low Voltage Cabling XLPE 4Cx6 m - - - - - - - Low Voltage Cabling XLPE 4Cx10 m - - - - - - - Low Voltage Cabling XLPE 4Cx16 m 15,963 21,297 60 900.00 1-Sep-15 2-Sep-15 500.00 9-Nov-15 10-Nov-15 3,000.00 11-Feb-16 24-Feb-16 - 7,000.00 2-Apr-16 14-Apr-16 9,897.00 27-Apr-16 7-May-16 Low Voltage Cabling XLPE 4Cx25 m 7,876 - - - - - - - Low Voltage Cabling XLPE 4Cx35 m - - - - - - - Low Voltage Cabling XLPE 4Cx70 m 170 858 2 12-14 weeks - - - - 827.00 16-Apr-16 18-Apr-16 31.00 7-May-16 7-May-16 Low Voltage Cabling XLPE 4Cx95 m - - - - - - - Low Voltage Cabling XLPE 4Cx120 m 2,356 2,692 14 - - - - 2,147.00 19-Apr-16 21-Apr-16 545.00 8-May-16 10-May-16 G Bare Copper BC 25 for Earthing system m 22,000 60 - - - 200.00 5-Mar-16 16-Mar-16 - 5.0 ECC cable lm 23,839 21,297 60 - - 3,000.00 11-Feb-16 24-Feb-16 - 2,000.00 2-Apr-16 14-Apr-16 16,297.00 27-Apr-16 10-May-16 - - - - - I Control Cabinet No. 16 11 22 12-14 weeks - - - - 7.00 7-May-16 19-May-16 4.00 11-May-16 17-May-16 - - - - - K MDB Distribution Board MV Substation No. 4 2 6 28-30 weeks - - - 2.00 24-Mar-16 31-Mar-16 - - - - - - - J MV Substation Internal cabling No. 4 2 24 12-14 weeks - - - 2.00 2-Apr-16 14-Apr-16 - - L MDB Distribution - Earthing systems No. 4 2 10 12-14 weeks - - - 2.00 2-Apr-16 14-Apr-16 - - H Ground Rods No. 71 - 12-14 weeks - - - 71.00 - M MV Substations Lightning protection No. 4 2 10 12-14 weeks - - - 2.00 5-Mar-16 16-Mar-16 - - N MV Substations - internal lighting and sockets No. 4 2 14 4-6 weeks - - - 2.00 5-Mar-16 20-Mar-16 - - P MV Substations- Portable CO2 and dry powder fire extinguishers No. 4 2 1 Ex- Stock - - - 2.00 15-Apr-16 14-Apr-16 - - - - - - - O MV Substations- air conditioning, dual No. 4 2 12 12-14 weeks - - - 2.00 5-Mar-16 16-Mar-16 - - - - - - - Q MV Substations DMS System No. 4 2 12 16-18 weeks - - - 2.00 12-Apr-16 14-Apr-16 - - - - - - - 020 Site Lighting - - - - - A Pole mounted LED Luminaire (180Watt) No. 308 274 - 30.00 12-Sep-15 17-Sep-15 25.00 17-Nov-15 19-Nov-15 - - 115.00 22-Apr-16 25-Apr-16 104.00 17-May-16 25-Jun-16 B Pole mounted LED Luminaire (227Watt) No. 225 217 - 16-18 weeks - - 48.00 20-Feb-16 2-Mar-16 - - 169.00 17-May-16 25-Jun-16 C Bridge mounted lighting luminaire (110Watt) No. 43 43 - - - - - 8.00 22-Apr-16 25-Apr-16 35.00 17-May-16 25-Jun-16 - - - - - Poles Galvanized steel - - - - - D 12m. Galvanized steel lighting pole single type 1 No. 93 63 13 6.00 12-Sep-15 14-Sep-15 9.00 17-Nov-15 19-Nov-15 - - 22.00 22-Apr-16 25-Apr-16 26.00 17-May-16 25-Jun-16 G 14m. Galvanized steel lighting pole single type 1 No. - - - - - - 50.00 22-Apr-16 25-Apr-16 New item 12m. Galvanized steel lighting pole double type 1 No. - 88 18 12.00 12-Sep-15 17-Sep-15 7.00 17-Nov-15 19-Nov-15 - - 39.00 22-Apr-16 25-Apr-16 30.00 17-May-16 25-Jun-16 - - - - - E 12m. Galvanized steel lighting pole single type 2 No. 43 35 7 - - - - 15.00 22-Apr-16 25-Apr-16 20.00 17-May-16 25-Jun-16 F 12m. Galvanized steel lighting pole double type 2 No. 86 - 16-18 weeks - - - - - H 14m. Galvanized steel lighting pole single type 2 No. 215 205 41 - - 48.00 20-Feb-16 2-Mar-16 - 50.00 22-Apr-16 25-Apr-16 107.00 17-May-16 25-Jun-16 I 14m. Galvanized steel lighting pole Double type 2 No. 5 6 2 - - - - - 6.00 17-May-16 25-Jun-16 - - - - - Fibre optic cabling - - - - - H Fibre optic cabling consisting of 144 standards external type to be laid in MV duct banks m 5,035 3,920 18 16-18 weeks - - 3,920.00 30-Jan-16 18-Feb-16 - - - I F.O cable termination cubicle as per ADDC standards No. 4 2 4 - - - 2.00 21-Mar-16 25-Mar-16 - - - - - - - J Dual Charger single battery bank 48V DC battery system as per ADDC standards No. 4 2 6 20-22 weeks - - - 2.00 12-Apr-16 14-Apr-16 - - 070 Other items - - - - - Other items not priced elsewhere- The Contractor shall list below and price any other items not priced elsewhere which are deemed necessary for the completion of the works. - - - - - A Supply & Install 22kv joint No. 10 6 6 - - 6.00 1-Feb-16 14-Feb-16 - - - B Supply & Install LV, joint 4Cx120 No. 7 4 4 - - - - 4.00 19-Apr-16 23-Apr-16 - C Warning Tape LM 32,260 24,847 20 4-6 weeks 900.00 9-Sep-15 10-Sep-15 500.00 16-Nov-15 17-Nov-15 500.00 20-Feb-16 25-Feb-16 - 10,000.00 6-Apr-16 26-Apr-16 12,947.00 27-Apr-16 7-May-16 D Cable Covering tiles 500 x 250 x 50 mm No. 64,520 49,694 62 8-10 weeks 1,800.00 3-Sep-15 9-Sep-15 1,000.00 11-Nov-15 16-Nov-15 1,000.00 20-Feb-16 25-Feb-16 - 20,000.00 4-Apr-16 24-Apr-16 25,894.00 27-Apr-16 7-May-16 E Supply and insall foundation for SL Poles 12m No. - - - - - - - F Supply and insall foundation for SL Poles 14m No. - - - - - - - G Chamber for Service Turret No. - - - - - - - H Install bridge lighting including conduits , junction boxes internal wiring etc. No. 43 43 64 16-18 weeks - - - - - 43.00 17-May-16 25-Jun-16 - - - 59 days 17days 11days 42 days 40 days 24 days 8-10 weeks 8-10 weeks DELIVERY PERIOD from the date of confirmed order PROJECT: MTC Primary & Secondary Roads Construction Abu Dhabi International Airport Electrical and Street Lighting Works order date: 16th Nov 2015 order date: 24th Aug 2015 order date: 14th Dec 2015 order date: 28th Nov 2015 order date: 27th Aug 2015 order date: 30th Jan 2016 order date: 26th Dec 2015 order date: 28th Nov 2015 order date: 23rd Jan 2016 order date: 05th April 2016 order date: 28th Nov 2015 order date: 08th Dec 2015 order date: 17th Oct 2015 order date: 18th Dec 2015 order date: 26th Sept 2015 order date: 10th Nov 2015 order date: 23rd Nov 2015 order date: 12th Jan 2016 order date: 20th Jan 2016

Upload: rohit-shrivastava

Post on 31-Jan-2016

213 views

Category:

Documents


0 download

DESCRIPTION

Mile Stonewise Work Programe and Required Qty

TRANSCRIPT

Page 1: Mile Stonewise Work Programe and Required Qty

Date : 30.04.2015

1-Sep-15 17-Sep-15 17 9-Nov-15 19-Nov-15 11 20-Jan-16 2-Mar-16 42 5-Mar-16 14-Apr-16 40 2-Apr-16 26-Apr-16 24 27-Apr-16 25-Jun-16 59 193

ITEM DESCRIPTION UNIT B.O.Q. QTYNew DESIGNQTY

No. Of Days required to complete including installation, testing and commissioning

Milestone 03 qty (30/09/2015)

Star

t Dat

e

End

Dat

e

Tota

l Dur

atio

n

Milestone 04 qty (30/11/2015)

Star

t Dat

e

End

Dat

e

Tota

l Dur

atio

n

Milestone 06 qty (01/03/2016)

Star

t Dat

e

End

Dat

e

Tota

l Dur

atio

n

Milestone S/S qty (25/04/2016)

Star

t Dat

e

End

Dat

e

Tota

l Dur

atio

n

Completion of section 01 qty (25/05/2016)

Star

t Dat

e

End

Dat

e

Tota

l Dur

atio

n

Completion of section 02 qty (09/07/2016)

Star

t Dat

e

End

Dat

e

Tota

l Dur

atio

n

010 Electrical Distribution

A Lighting Service Cabinet (turrets) SC01/08 No. 8 8 14

12-14 weeks- - - - 6.00 27-Apr-16 5-May-16 2.00 11-May-16 19-May-16

- - - - - B 500kVA Transformer No. 1 1 5 - - - 1.00 21-Mar-16 24-Mar-16 - -

1000kVA Transformer No. 1 1 5 16-18 weeks - - - 1.00 21-Mar-16 24-Mar-16 - - 2000kVATransformer No. 2 - - - - - -

- - - - - C Medium voltage Switchgear No. 4 2 14 28-30 weeks - - - 2.00 21-Mar-16 31-Mar-16 - -

- - - - - D 22kv Cabling m 5,035 3,920 18 12-14 weeks - - 3,920.00 20-Jan-16 10-Feb-16 - - -

- - - - - E Low Voltage Switchboard compact station TA 1/4 No. 4 2 3 12-14 weeks - - - 2.00 5-Mar-16 16-Mar-16 - -

- - - - - F Low Voltage Cabling XLPE 4Cx6 m - - - - - - -

Low Voltage Cabling XLPE 4Cx10 m - - - - - - - Low Voltage Cabling XLPE 4Cx16 m 15,963 21,297 60 900.00 1-Sep-15 2-Sep-15 500.00 9-Nov-15 10-Nov-15 3,000.00 11-Feb-16 24-Feb-16 - 7,000.00 2-Apr-16 14-Apr-16 9,897.00 27-Apr-16 7-May-16Low Voltage Cabling XLPE 4Cx25 m 7,876 - - - - - - - Low Voltage Cabling XLPE 4Cx35 m - - - - - - - Low Voltage Cabling XLPE 4Cx70 m 170 858 2 12-14 weeks - - - - 827.00 16-Apr-16 18-Apr-16 31.00 7-May-16 7-May-16Low Voltage Cabling XLPE 4Cx95 m - - - - - - - Low Voltage Cabling XLPE 4Cx120 m 2,356 2,692 14 - - - - 2,147.00 19-Apr-16 21-Apr-16 545.00 8-May-16 10-May-16

G Bare Copper BC 25 for Earthing system m 22,000 60 - - - 200.00 5-Mar-16 16-Mar-16 - 5.0 ECC cable lm 23,839 21,297 60 - - 3,000.00 11-Feb-16 24-Feb-16 - 2,000.00 2-Apr-16 14-Apr-16 16,297.00 27-Apr-16 10-May-16

- - - - - I Control Cabinet No. 16 11 22 12-14 weeks - - - - 7.00 7-May-16 19-May-16 4.00 11-May-16 17-May-16

- - - - -

K MDB Distribution Board MV Substation No. 4 2 6 28-30 weeks - - - 2.00 24-Mar-16 31-Mar-16 - -

- - - - - J MV Substation Internal cabling No. 4 2 24 12-14 weeks - - - 2.00 2-Apr-16 14-Apr-16 - -

L MDB Distribution - Earthing systems No. 4 2 10 12-14 weeks - - - 2.00 2-Apr-16 14-Apr-16 - - H Ground Rods No. 71 - 12-14 weeks - - - 71.00 - M MV Substations Lightning protection No. 4 2 10 12-14 weeks - - - 2.00 5-Mar-16 16-Mar-16 - -

N MV Substations - internal lighting and sockets No. 4 2 14

4-6 weeks- - - 2.00 5-Mar-16 20-Mar-16 - -

P MV Substations- Portable CO2 and dry powder fire extinguishers No. 4 2 1 Ex- Stock - - - 2.00 15-Apr-16 14-Apr-16 - -

- - - - -

O MV Substations- air conditioning, dual No. 4 2 12 12-14 weeks - - - 2.00 5-Mar-16 16-Mar-16 - -

- - - - - Q MV Substations DMS System No. 4 2 12 16-18 weeks - - - 2.00 12-Apr-16 14-Apr-16 - -

- - - - - 020 Site Lighting - - - - -

A Pole mounted LED Luminaire (180Watt) No. 308 274 - 30.00 12-Sep-15 17-Sep-15 25.00 17-Nov-15 19-Nov-15 - - 115.00 22-Apr-16 25-Apr-16 104.00 17-May-16 25-Jun-16B Pole mounted LED Luminaire (227Watt) No. 225 217 - 16-18 weeks - - 48.00 20-Feb-16 2-Mar-16 - - 169.00 17-May-16 25-Jun-16C Bridge mounted lighting luminaire (110Watt) No. 43 43 - - - - - 8.00 22-Apr-16 25-Apr-16 35.00 17-May-16 25-Jun-16

- - - - - Poles Galvanized steel - - - - -

D 12m. Galvanized steel lighting pole single type 1 No. 93 63 13 6.00 12-Sep-15 14-Sep-15 9.00 17-Nov-15 19-Nov-15 - - 22.00 22-Apr-16 25-Apr-16 26.00 17-May-16 25-Jun-16G 14m. Galvanized steel lighting pole single type 1 No. - - - - - - 50.00 22-Apr-16 25-Apr-16

New item 12m. Galvanized steel lighting pole double type 1 No. - 88 18 12.00 12-Sep-15 17-Sep-15 7.00 17-Nov-15 19-Nov-15 - - 39.00 22-Apr-16 25-Apr-16 30.00 17-May-16 25-Jun-16

- - - - - E 12m. Galvanized steel lighting pole single type 2 No. 43 35 7 - - - - 15.00 22-Apr-16 25-Apr-16 20.00 17-May-16 25-Jun-16F 12m. Galvanized steel lighting pole double type 2 No. 86 - 16-18 weeks - - - - - H 14m. Galvanized steel lighting pole single type 2 No. 215 205 41 - - 48.00 20-Feb-16 2-Mar-16 - 50.00 22-Apr-16 25-Apr-16 107.00 17-May-16 25-Jun-16I 14m. Galvanized steel lighting pole Double type 2 No. 5 6 2 - - - - - 6.00 17-May-16 25-Jun-16

- - - - - Fibre optic cabling - - - - -

HFibre optic cabling consisting of 144 standards external type to be laid in MV duct banks

m 5,035 3,920 1816-18 weeks

- - 3,920.00 30-Jan-16 18-Feb-16 - - -

I F.O cable termination cubicle as per ADDC standards No. 4 2 4 - - - 2.00 21-Mar-16 25-Mar-16 - - - - - - -

J Dual Charger single battery bank 48V DC battery system as per ADDC standards No. 4 2 6 20-22 weeks - - - 2.00 12-Apr-16 14-Apr-16 - -

070 Other items - - - - - Other items not priced elsewhere- The Contractor shall list below and price any other items not priced elsewhere which are deemed necessary for the completion of the works.

- - - - -

A Supply & Install 22kv joint No. 10 6 6 - - 6.00 1-Feb-16 14-Feb-16 - - -

B Supply & Install LV, joint 4Cx120 No. 7 4 4 - - - - 4.00 19-Apr-16 23-Apr-16 -

C Warning Tape LM 32,260 24,847 20 4-6 weeks 900.00 9-Sep-15 10-Sep-15 500.00 16-Nov-15 17-Nov-15 500.00 20-Feb-16 25-Feb-16 - 10,000.00 6-Apr-16 26-Apr-16 12,947.00 27-Apr-16 7-May-16

D Cable Covering tiles 500 x 250 x 50 mm No. 64,520 49,694 62 8-10 weeks 1,800.00 3-Sep-15 9-Sep-15 1,000.00 11-Nov-15 16-Nov-15 1,000.00 20-Feb-16 25-Feb-16 - 20,000.00 4-Apr-16 24-Apr-16 25,894.00 27-Apr-16 7-May-16E Supply and insall foundation for SL Poles 12m No. - - - - - - - F Supply and insall foundation for SL Poles 14m No. - - - - - - - G Chamber for Service Turret No. - - - - - - -

H Install bridge lighting including conduits , junction boxes internal wiring etc. No. 43 43 64 16-18 weeks - - - - - 43.00 17-May-16 25-Jun-16

- - -

59 d

ays

17da

ys

11da

ys

42 d

ays

40 d

ays

24 d

ays

8-10 weeks

8-10 weeks

DELIVERY PERIOD from the date of confirmed order

PROJECT: MTC Primary & Secondary Roads Construction Abu Dhabi International Airport Electrical and Street Lighting Works

order date: 16th Nov 2015

order date: 24th Aug 2015

order date: 14th Dec 2015

order date: 28th Nov 2015

order date: 27th Aug 2015

order date: 30th Jan 2016

order date: 26th Dec 2015

order date: 28th Nov 2015

order date: 23rd Jan 2016

order date: 05th April 2016

order date: 28th Nov 2015

order date: 08th Dec 2015

order date: 17th Oct 2015order date: 18th Dec 2015

order date: 26th Sept 2015

order date: 10th Nov 2015

order date: 23rd Nov 2015

order date: 12th Jan 2016

order date: 20th Jan 2016