mikkelsen fully grouted piezometer

Upload: pleyvaze

Post on 03-Jun-2018

245 views

Category:

Documents


2 download

TRANSCRIPT

  • 8/12/2019 Mikkelsen Fully Grouted Piezometer

    1/16

    1

    Simplify Piezometer Installations, Lower CostsSimplify Piezometer Installations, Lower Costsand Get Better results withand Get Better results with

    Fully Grouted PiezometersFully Grouted Piezometers

    P. Erik Mikkelsen, P.E.Consulting Engineer GeoMetron Inc PSBellevue, WA, USA

    Univ. of Flor ida Short Course, March 19, 2007

    Open Standpipe Piezometer Open Standpipe Piezometer Obviously low material costs , but ... Time consuming recording Time-lag potential Minimal and un-timely observations

    Installation sensitivity/problems

    time consuming backfill procedures complicated backfill risk of incomplete backfill

  • 8/12/2019 Mikkelsen Fully Grouted Piezometer

    2/16

    2

    VW Piezometer SensorsVW Piezometer Sensors Advantages instant reading, not influenced by observer can be fully grouted best suited for automated readings calibration not influenced by lead length high zero stability (minimal drif t for decades)

    Disadvantages vulnerable to over-voltage, need protection calibration factors, barometric influence can be damaged by over-pressure

    (After Slope Indicator)

  • 8/12/2019 Mikkelsen Fully Grouted Piezometer

    3/16

    3

    Fully grouted piezometer Fully grouted piezometer Why grout? Eliminates complexityWhy does it work? It is like saturatedclay!Works like piezo sensor pushed into clayMix design? Design based on cementcontent.

    Grout properties (new research results)

    Mandrel pushed Mandrel pushed --in VWP in soft clayin VWP in soft clay

  • 8/12/2019 Mikkelsen Fully Grouted Piezometer

    4/16

    4

    Casagrande missed the point that pressure sensors are different!

  • 8/12/2019 Mikkelsen Fully Grouted Piezometer

    5/16

    5

    Darcys Law for FlowDarcys Law for Flow

    Grout Type Characteristics k (cm/sec) Source Neat cement w/c = 0.53, = 112 pcf 10-7 Baroid

    Bentonite chips hydrated 10 -8 Baroid Bentonite slurry 6 % solids 10 -5 Baroid Bentonite slurry 20 % solids 10 -8 Baroid

    Cement-bentonite water/solids = 4 to 1 10 -6 Vaughan, 1969Cement-bentonite w : c : b = 4 : 1 : 1 5 x 10 -8 Vaughan, 1973

    Table 2. Permeability of some grouts

  • 8/12/2019 Mikkelsen Fully Grouted Piezometer

    6/16

    6

    CementCement --Bentonite GroutBentonite GroutMix ratio by weight - 2.5 water : 1 cem :0.37 bent + or according to consistencyMix water and cement firs t

    Add bentonite slowly, high agitat ion, make groutcreamy, yet pumpable (Marsh # 50-60 sec)Density - 80 pcfWater Content - >100 %Modulus - about 10,000 psi30- day QU strength - 50 to 100 psiPermeabil ity k = 1.0E-06 cm/sec.

    0

    20

    40

    60

    80

    100

    120

    0 2 4 6 8 10 12 14

    Water-Cement Ratio by Weight

    U n c o n f i n e d C o m p r e s s i v e S t r e n g t h i n p s i

    Marsland, 1973

    Slope Indicator, 1982

    Dunnicliff, 1980

    Anderson, 1984Minnitti, 1980

  • 8/12/2019 Mikkelsen Fully Grouted Piezometer

    7/16

    7

    VWP in Grout, 200mm thick ness , 288 days cur ing

    0

    5

    10

    15

    20

    25

    30

    35

    40

    0.00 5.00 10.00 15.00 20.00

    Lapsed Time in Minutes

    P r e s s u r e

    H e a

    d i n F e e

    t

    Piezometer Chamber

  • 8/12/2019 Mikkelsen Fully Grouted Piezometer

    8/16

    8

    VWP in Grout, Response Time vs. Curing in Days

    200mm grout thickness

    0

    1

    2

    3

    4

    0 50 100 150 200

    Curing Time in Days

    T i m e

    i n

    M i n u t e s

    50%

    90%

    95%

    100%

  • 8/12/2019 Mikkelsen Fully Grouted Piezometer

    9/16

    9

  • 8/12/2019 Mikkelsen Fully Grouted Piezometer

    10/16

    10

    Normalized Cement-Bentonite Grout Properties(Marsh Number = 50 to 60 sec.) Aft er B arr E ng ine erin g 3/9/0 5

    0

    0.5

    1

    1.5

    2

    2.5

    2.0 2.5 3.0 3.5 4.0 4.5 5.0 5.5 6.0 6.5 7.0

    Water-Cement Ratio - w/c

    N o r m a l i z e d

    V a l u e o f D e n s i t y

    , V o i d

    R a t i o

    &

    S t r e n g t h

    0

    20

    40

    60

    80

    100

    N o r m a l i z e d

    V a l u e o f P e r m e a b i l i t y -

    k

    Density(pcf) = 83.8 xVoid Ratio = 4 xUCC strength = 240 xk (cm/sec) = 1.0E-7 x

  • 8/12/2019 Mikkelsen Fully Grouted Piezometer

    11/16

    11

    Fully grouted multiFully grouted multi --level VWPslevel VWPs

    Barometric Pressure and Rainfall, Oregon Coast

    950

    960

    970

    980

    990

    1000

    1010

    1020

    1030

    10/1/990:00

    10/31/9912:00

    12/1/990:00

    12/31/9912:00

    1/31/000:00

    3/1/0012:00

    4/1/00 0:00

    1999 / 2000

    m i l l i b a r s o r c m

    o f H 2 O

    0

    0.6

    1.2

    1.8

    2.4

    3

    3.6

    4.2

    4.8

    R a

    i n f a l l p e r

    1 2 h o u r s ,

    I n c

    h e s

  • 8/12/2019 Mikkelsen Fully Grouted Piezometer

    12/16

    12

    VWP - Altitude Correct ion

    0.00

    2.00

    4.00

    6.00

    8.00

    10.00

    12.00

    0 2000 4000 6000 8000 10000 12000

    Altitu de - Feet

    C o r r e c t i o n -

    F e e t

    0.00

    1.00

    2.00

    3.00

    4.00

    5.00

    6.00

    C o r r e c t i o n -

    P S I

    feet of H2OPSI

  • 8/12/2019 Mikkelsen Fully Grouted Piezometer

    13/16

    13

    Fully Grouted Piezometer ProjectFully Grouted Piezometer Project

    Raw data for fully grouted VWPRaw data for fully grouted VWP

  • 8/12/2019 Mikkelsen Fully Grouted Piezometer

    14/16

    14

    PROFILE 2: Pore Pressure ElevationsGrnd. Elev. Assum ed = 20 m

    4.0

    6.0

    8.0

    10.0

    12.0

    14.0

    16.0

    18.0

    20.0

    22.0

    24.0

    26.0

    28.0

    30.0

    32.0

    1-May-01 1-Jul-01 31-Aug-01 31-Oct-01 31-Dec-01 2-Mar-02

    P i e z o m e

    t r i c E l e v a

    t i o n ,

    m e

    t e r s

    #9, elev. 18.1 m

    #8, elev. 18 m

    #10, elev. 12 m#12, elev. 10.5 m

    #11, elev. 9 m

    #13, elev. 8 m

    Emb. Elevation

    #9 #8

    #10

    #12

    #11#13

    PROFILE 1: Pore Pressure Elevations,Grnd. Elev. Assumed = 20 m

    4.0

    6.0

    8.0

    10.0

    12.0

    14.0

    16.0

    18.0

    20.0

    22.0

    24.0

    26.0

    28.0

    30.0

    32.0

    1-May-01 1-Jul-01 31-Aug-01 31-Oct-01 31-Dec-01 2-Mar-02

    P i e z o m e

    t r i c E l e v a

    t i o n ,

    m e

    t e r s

    #1, elev. 18.3 m

    #3, elev. 11.5 m

    #2, elev. 11 m#5, elev. 11 m

    #7, elev. 10 m

    #6, elev. 6.5

    #4, elev. 5 m

    Emb. Elevation#4

    #6

    #7

    #5 #2#3

    #1

  • 8/12/2019 Mikkelsen Fully Grouted Piezometer

    15/16

    15

    CC--B grout: 55 gal. paddle mixer B grout: 55 gal. paddle mixer

    400400 --m deep Mm deep M --L VWP installationL VWP installation

  • 8/12/2019 Mikkelsen Fully Grouted Piezometer

    16/16

    16

    ConclusionsConclusionsCement-bentonite grout works!Simpler and faster installationLess chance of failed installationWorks as a high air-entry filter It always starts out fully saturatedEliminates risk of bentonite activity

    Applicable to both boreholes andembankments