migrating to af and af driven power applications...b stage 5 – new sharepoint portal 18 new scada...

58
Presented by © Copyright 2013 OSIsoft, LLC. Migrating to AF and AF driven Power applications Henryk Schneider – SP-AusNet Steve O’Donnell – Realtime Results

Upload: others

Post on 03-Aug-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

Presented by

© Copyr igh t 2013 OSIso f t , LLC.

Migrating to AF and AF driven Power applications

Henryk Schneider – SP-AusNetSteve O’Donnell – Realtime Results

Page 2: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

Agenda• About Us• Migration to PI System 2010• Projects

– Wiredown/SWER Events/BrownOuts– Load Profile Analysis– Windows Services

2

Page 3: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

About SP AusNet• Diversified energy business• $7 billion electricity & gas network• 1.2 million customers

3

Page 4: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

What we do• Managing three key Victorian energy networks

– Electricity Transmission Network• 13,000 high voltage towers• ~6,580 km of transmission lines

– Electricity Distribution Network• 650,000 customers• Network spans 49,500 kms across an area of 80,000 sq. kms.

– Gas Distribution Network• 620,000 customers• Network spans 10,000 kms across an area of 60,000 sq. kms.

4

Page 5: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

Realtime Results• Started with the Asset Condition Management project in 2006

– Dynamic Lines, Transformers and Asset Health• Continued with additional projects for

– Weather Warning System– Gas Advisor and Leak detection system

• Background• 34 years in Process Control and Process Management Systems• 26 years with the PI SystemTM

• 22 years active software development• Focus is advanced value-added PI applications for clients

5

RtR

Page 6: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

Upgrade to PI 2010• v3.4.380.36 --> v3.4.385.77• Drivers

– end of life hardware– performance– archive storage– software upgrade

6

Page 7: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

System info• 13 servers (Windows 2003)• Point count 370,000• Module count 7,300• Archive storage 800GB• 1000 archive files online

7

Page 8: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

Products used• PI Server• PI ACE • rtWebParts• rtAlerts• PI Interfaces - ESCA HabConnect, PI to PI, HTML, PerfMon, SNMP, Ping,

TCPResp, RDBMS, PIOLEDB• PI Datalink• PI Processbook• Windows SharePoint Services 3.0• MS SQL 2005• MS SQL 2005 Reports• PI SDK applications

8

Page 9: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

System Architecture

9

SCADA Interfaces

SCADA Interfaces

SCADA Interfaces

PI ACE PI ACESharePoint SharePoint

SharePoint SharePointMisc.Interfaces

Misc. Interfaces

Site A Site B

Corporate

DMZ

SCADA

Collective

Server A Server B

PI HTMLPI UFLPI RDBMS

WSS 3.0RtWebPartsRtAlerts

PI ACECustom Services PI Server

PI PerfMonPI SNMPPI PingPI TCP Resp

HabConnect –Distribution & Gas

HabConnect -Transmission

WSS 3.0RtWebParts

Page 10: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

Key Changes• 32 bit -> 64 bit environment (Windows Server 2008 R2)• Module DB -> Asset Framework 2010• rtWebParts -> PI WebParts 2010• rtAlerts -> PI Notifications 2010• PI Datalink 3.1 -> 2010 *• PI Processbook 3.1 -> 3.2 *• WSS 3.0 -> SharePoint 2010 Foundation• MS SQL & Report Server 2005 -> 2008 • MS Visual Studio 2005 -> 2010

10

Page 11: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

Approach• Staged implementation around each system component

– Install– Migrate software/database– Run in parallel– Test & Verify – Cutover

• Advantages– Low risk– Minimised impact on users– Rollback simple by switching users/apps back to old system

11

Page 12: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

Communication• PI Bulletin newsletter• Pre and Post cutover

information & instruction e-mails.

• 200+ users

12

Page 13: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

Migration

13

SCADA Interfaces

SCADA Interfaces

SCADA Interfaces

Collective

Server A Server BPI ACE PI ACESharePoint SharePoint

SharePoint SharePointMisc. Interfaces.

Misc. Interfaces

Page 14: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

Stage 1 – New SCADA interfaces

14

New SCADA Interfaces

Collective

Server A Server BPI ACE PI ACESharePoint SharePoint

SharePoint SharePointMisc. Interfaces.

Misc. Interfaces

New SCADA Interfaces

New SCADA Interfaces

New SCADA Interfaces

Page 15: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

Stage 2 – New Collective & AF

15

New SCADA Interfaces

Collective

Server A Server B

PI ACE PI ACESharePoint SharePoint

SharePoint SharePointMisc. Interfaces.

Misc. Interfaces

New SCADA Interfaces

New SCADA Interfaces

New SCADA Interfaces

CollectivePI 2010

Server A1 Server B1

PI to PI

AF Collective

AF Server A

AF Server B

Page 16: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

AF 2010 Collective

AF Server A

AF Server B

Stage 3 – Misc. & temp. interfaces

16

New SCADA Interfaces

Collective

Server A Server BPI ACE PI ACESharePoint SharePoint

SharePoint SharePointMisc.

Interfaces.Misc.

Interfaces

PI 2010Collective

Server A1 Server B1

PI to PI

New Misc Intf New Misc Intf

Temp SCADA Interfaces

Temp SCADA Interfaces

New SCADA Interfaces

New SCADA Interfaces

New SCADA Interfaces

Page 17: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

AF 2010 Collective

AF Server A

AF Server B

Stage 4 – New ACE Servers

17

New SCADA Interfaces

Collective

Server A Server BPI ACE PI ACESharePoint SharePoint

SharePoint SharePointMisc.

Interfaces.Misc.

Interfaces

PI 2010Collective

Server A1 Server B1

New Misc Intf New Misc Intf

Temp SCADA Interfaces

Temp SCADA Interfaces

New SCADA Interfaces

New SCADA Interfaces

New SCADA Interfaces

New ACE A1 New ACE A2 New ACE B1 New ACE B2

Page 18: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

AF 2010 Collective

AF Server A

AF Server B

Stage 5 – New SharePoint portal

18

New SCADA Interfaces

Collective

Server A Server BPI ACE PI ACESharePoint SharePoint

SharePoint SharePointMisc.

Interfaces.Misc.

Interfaces

PI 2010Collective

Server A1 Server B1

New Misc Intf New Misc Intf

Temp SCADA Interfaces

Temp SCADA Interfaces

New SCADA Interfaces

New SCADA Interfaces

New SCADA Interfaces

New ACE A1 New ACE A2 New ACE B1 New ACE B2

New SharePoint New SharePoint

Page 19: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

AF 2010 Collective

AF Server A

AF Server B

Stage 6 – Switch SCADA interfaces

19

New SCADA Interfaces

Collective

Server A Server B

PI ACE PI ACESharePoint SharePoint

SharePoint SharePointMisc.

Interfaces.Misc.

Interfaces

PI 2010Collective

Server A1 Server B1

New Misc IntfNew Misc Intf

Temp SCADA Interfaces

Temp SCADA Interfaces

New SCADA Interfaces

New SCADA InterfacesNew SCADA

Interfaces

New ACE A1 New ACE A2 New ACE B1 New ACE B2

New SharePoint New SharePoint

Page 20: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

AF 2010 Collective

AF Server A

AF Server B

Stage 7 – Cutover Users

20

New SCADA Interfaces

PI 2010Collective

Server A1 Server B1

New Misc IntfNew Misc Intf

New SCADA Interfaces

New SCADA InterfacesNew SCADA

Interfaces

New ACE A1 New ACE A2 New ACE A1 New ACE A2

New SharePoint New SharePoint

Page 21: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

Lessons Learned

21

• Memory usage & File System Cache (FSC) under 64bit environment – OSIsoft KB Article # KB00784

• AF Collective (Replication) – can’t write to AF database when Primary is not available.

Page 22: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

Possible AF Deployment ScenariosPI AF 2010 Users’s Guide.

22

Page 23: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

Resources

23

• PI Server 2010 Installation and Upgrade Guide• PI Server Installation and Upgrade Guide

v3.4.380• PI Interfaces User Guides• Tech Support• Realtime Results• vCampus

Page 24: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

Recent AF based Applications• WireDown Events• SWER Step Events• Device Operations• Load Analysis• Consumption Summaries• Data Transfers• Gas Logging Meter Management• BrownOut Analysis

24

Page 25: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

Wiredown/SWER Events Project• Problem

– Power lines in distribution network fail periodically– Need to detect and alarm these events urgently

• Proposal– Use data from the field devices to detect failure in

realtime• Projects are in Trial/Evaluation mode

25

Page 26: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

Wiredown/SWER Applications• Separate Windows Service applications

– .NET 4 based using VB.NET• AF Template driven

– 104 Substations, 365 Feeders,2237 devices– Not ACE based

• Primary/Standby

26

Page 27: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

Asset Definition

27

Page 28: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

Template Driven

28

Page 29: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

Field Devices• Circuit Breaker/Feeder Relays (F650, SR760)• AutoReclosers

• ACR’s (Form 5, Form 6, & RC10)

• Single Wire Earth Return AutoReclosers• SWER’s (RC10S and Nulec)

• Sectionalisers• SEC (GSS100 & CAPM5)

• Data received via SCADA

29

Page 30: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

Device Definition

30

Page 31: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

Application Device Uses• High Voltage Load analysis• Substation Load Analysis• Consumption Summary• WireDown Analysis• SWER Step Event Analysis• Fire Risk Analysis

31

Page 32: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

Devices in AF• Check made for new tags• Device elements automatically created

– New device added when new tag found– Based on template

• Trigger values calculated when sufficient history is available (~ 1 week)

• Device elements used by many applications32

Page 33: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

WireDown Trigger Condition

33

Specified Period (mins)

Calculated Trigger Value (Amps)

Send Email Alarm

(based on Time weighted average data)

Page 34: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

WireDown Conditions• Important to eliminate false positives

– Otherwise ignored by Control Room• Filter out several conditions

– Abnormal Load switching– Parallel events– Relay testing

• Email Alerts issued for various cases– Embedded trends for fast assessment

34

Page 35: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

WireDown Earth Fault Alarm Email Alert

35

Page 36: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

Abnormal Load Switch - Resolved

36

Page 37: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

Real WireDown Example

37

Page 38: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

SWER Step Change Analysis

38

Alarm sent after specified

duration

Calculated Step Change exceeded (Amps)

Analysed all steps over last 60 days to calculate Step trigger value for Device

Page 39: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

SWER Earth Fault Email Alert

Page 40: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

Load Profile Project• Problem

– Planners need to know what power is going through their Pole transformers (aka Substations)

– Need to aggregate usage via Smart meter data– Simple tool required for analysis

• Proposal– Combine Oracle and PI data to analyse data– Perform calculations for 60,000 meters

• Summaries for Weekly, Yearly data• Calculation run over 3 – 4 days

– Provide Web based tool for planners

40

Page 41: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

Web site for Load Profile Analysis

41

Page 42: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC. 42

Page 43: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

Search by Name or NMI

43

Page 44: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

Select Time to see trend

44

Page 45: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

Plot Load and Frequency

45

Page 46: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

Load Plot

46

Page 47: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

Frequency and Duration Plots

47

Page 48: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

Applications Settings via Web page

48

Page 49: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

Application Management Project

• Problem– Growing number of Windows Services installed– Installed in Primary/Standby configuration– Need to monitor performance and track activity

• Proposal– Define Application template for common approach– Provide Element Relative display for PI System Manager

49

Page 50: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

Application Management• Currently running 9 Windows Services

– Performing a variety of tasks• Consumption Summaries• Automated Data Transfers via FTP/Email• Substation Load Profile calculations• Tracking Gas Corrosion Loggers• Tracking Wiredown and Earth faults

– Running in Primary/Standby mode• AF used to monitor Services

50

Page 51: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

Applications in AF

51

Page 52: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

Application Template

52

Page 53: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

Application Monitoring via ER displays

53

Page 54: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC. 54

Application Monitoring via ER displays

Page 55: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

Conclusions• Trials have proven effective

– Real and impending faults identified early– No cost benefits done as yet

• AF is very versatile for developing applications– AF Templates reduce significant re-work

55

Page 56: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

Questions ?

56

Page 57: Migrating to AF and AF driven Power applications...B Stage 5 – New SharePoint portal 18 New SCADA Interfaces Collective Server A Server B SharePoint PI ACE PI ACE SharePoint SharePoint

© Copyr igh t 2013 OSIso f t , LLC.

Henryk [email protected] AnalystSP-AusNet

57

Steve O’[email protected] DirectorRealtime Results Ltd