mic adaptation in innocellcic.hk/files/page/10343/20190917hip hing & hkstp... · 2019-09-19 ·...
TRANSCRIPT
MiC Adaptation in InnoCell
INNOCELL
Location
InnoCell
WIFI
REFRESHMENT
LOUNGE
ROOFTOPTERRACE
OUTDOOR SPACE
SHARED KITCHEN
COFFEE SHOP
GYM
GAME ROOM
EVENTS
WORKPLACE
PREMIUM TV
HOUSEKEEPING
LAUNDRY
BICYCLE PARKING
LOCATION
TAI PO
GFA
15,300 m2
HEIGHT
59.2 mPd
STOREY
15
SITE AREA
2,990 m2
Project Parameter
4. One-stop accommodation
Attracting &
Retaining
Talents to
Hong Kong
Affordable
On-Campus
Accommodation
A Community
to foster
communication
and exchange
ideas
Offer one-stop
accommodation
to visiting
scientist and
researchers
1. Affordable Housing 3. Community
3. Attracting & Retaining Talents
Smart Living & Co-creation CommunityVibrant. Smart. Green. Energetic. Lifestyle.
4
Development of Concept Design Embracing MiC
Allocation of Volumetric MiC
4
MODULE SIZE : 3100mm x 7350mm
70% of CFA
Module Size
MODULE SIZE : 3100mm x 7350mm
Access Hatch
Access Hatch
31007
35
0
MiC Structure in Prototypes
4
VENDOR 3VENDOR 2VENDOR 1
Journey for InnoCell MiC
Tender Documentation (Tender A + B)
PQ for MWC and
MiC Vendors
Procurement
Stragety
Approved
Award of MWC
Tender B (MiC)
Tender
Assessment
JunAug Sep Oct Nov Dec Feb AprJan JulyMar May
Piling
Commencement
Main Works
EOI for MiC
Prototype
Piling
Completion
Aug
Target Mock-up
Completion for Bulk
Production
Design
Finalization for
MiC
MiC
Prototype
(CIMC, UB,
Hailong)
Tender A (Conventional) +
Tender B (MiC)
Pre-acceptance
Approval for MiC
Vendors
MWC to
confirm MiC
Vendor
2018 2019
Sep
10
Main Works Contract for InnoCellfor Hong Kong Science Park at Pak Shek Kok, Tai Po, TPTL No. 245, New Territories.
Selection of MiC Vendor
• Factory Location.
• Factory Experience & Productivity.
• Logistic by Shipment/ On Road.
• Overseas Experience/ Track Records.
• BD Pre-Acceptance Approval.
• Lesson Learning & Sharing.
11
Main Works Contract for InnoCellfor Hong Kong Science Park at Pak Shek Kok, Tai Po, TPTL No. 245, New Territories.
MiC Production Process
12
Main Works Contract for InnoCellfor Hong Kong Science Park at Pak Shek Kok, Tai Po, TPTL No. 245, New Territories.
MiC Production Process
13
Main Works Contract for InnoCellfor Hong Kong Science Park at Pak Shek Kok, Tai Po, TPTL No. 245, New Territories.
MiC Production Process
14
Main Works Contract for InnoCellfor Hong Kong Science Park at Pak Shek Kok, Tai Po, TPTL No. 245, New Territories.
MiC Production Process
15
Main Works Contract for InnoCellfor Hong Kong Science Park at Pak Shek Kok, Tai Po, TPTL No. 245, New Territories.
16
Main Works Contract for InnoCellfor Hong Kong Science Park at Pak Shek Kok, Tai Po, TPTL No. 245, New Territories.
Structural Fabrication Fitting-out Installation
Mock Up Progress Photos
17
Main Works Contract for InnoCellfor Hong Kong Science Park at Pak Shek Kok, Tai Po, TPTL No. 245, New Territories.
Mock Up Completion Photos
18
Main Works Contract for InnoCellfor Hong Kong Science Park at Pak Shek Kok, Tai Po, TPTL No. 245, New Territories.
Code Item PRC to PRCThailand via HK to
PRC
SN-01 custom made toilet sink(new design)
P
SN-02 waster closet P
SN-03 desk mount mixer(new design)
P
SN-04 shower set P
SN-06 toilet tissue holder w/ shelf P
SN-07 hook P
SN-09 floor drain P
SN-21 ready made pantry sink(new design)
P
SN-22 ready made pantry sink(new design)
P
San-Fit Material Summary
• Design intent frozen in early stage.• Advance approval & procurement of Material.
(at least 4 months ahead) Add-on Tax Included Add on Border Tax
19
Main Works Contract for InnoCellfor Hong Kong Science Park at Pak Shek Kok, Tai Po, TPTL No. 245, New Territories.
MEP Materials Summary
Plumbing & Drainage
MVAC
Electrical
3C 认证实际上是英文名称“China Compulsory Certification”(中国强制性
产品认证制度)的英文缩写,也是国家对强制性产品认证使用的统一标志。
当前,中国公布的首批必须通过强制性认证的产品共有十九大类一百三十二种。
主要包括电线电缆、低压电器、信息技术设备、安全玻璃、消防产品、机动车辆轮胎、乳胶制品等。
-> Allow time for Doc. Submission & Border Clearance.
20
Main Works Contract for InnoCellfor Hong Kong Science Park at Pak Shek Kok, Tai Po, TPTL No. 245, New Territories.
BEAM Plus for New Buildings Version 1.2Category Applicable
creditsAchievedcredits
% of achievedcredits
Category weightfactor
Weightedachieved score
Site aspect 21 16 76% 25% 19Material Aspect 18 9 50% 8% 4
Energy use 38 27 71% 35% 24.9Water use 9 5 56% 12% 6.7Indoor Envt.Quality
27 21 78% 20% 15.6
Innovation 1 6 - 100% 6Total - - - - 76.1
Marginal credits in energy use aspect:• If one credit becomes unachievable, the percentage of
achieved credits will be 68%• Rating will be dropped from platinum to gold• Keep tight monitoring on site works and documentation• Discuss with BEAM Plus consultant if there is possibility to
achieve extra credits as buffer
21
Main Works Contract for InnoCellfor Hong Kong Science Park at Pak Shek Kok, Tai Po, TPTL No. 245, New Territories.
• Modules are fabricated in China.
• Installs sanitary fitments, selected electrical appliances in China.
• Procure in HK and deliver to China for installation to meet the HK standards and BEAM Plus requirements.
• Relevant documents shall be maintained carefully.
• Freshwater quality test, comply with latest WSD requirements.
BEAM Plus for New Buildings Version 1.2
22
Main Works Contract for InnoCellfor Hong Kong Science Park at Pak Shek Kok, Tai Po, TPTL No. 245, New Territories.
Offsite Mobile Application - Novade
23
Main Works Contract for InnoCellfor Hong Kong Science Park at Pak Shek Kok, Tai Po, TPTL No. 245, New Territories.
• Digitizing paper record in online platform
Offsite Mobile Application - Novade
24
Main Works Contract for InnoCellfor Hong Kong Science Park at Pak Shek Kok, Tai Po, TPTL No. 245, New Territories.
PPVC/ MiC would be a “Game Changing” step in our industry.
根據世界經濟論壇2016年報告《塑造建築業的未來(Shaping the Future of Construction)》
25