miami in touch-amdocs-lte-2011-05-16-handout
TRANSCRIPT
The Strategic Role of OSS in LTE Deployments:A Case study from Vodafone D2y
Christos Bo rlakosChristos BourlakosHead of Network Support Systems
Vodafone Germany
Amdocs InTouch 2011Miami, 18th May
Confidentiality level on title masterVersion number on title master
May 18, 2011
Agenda
> Introduction Vodafone
> LTE @ Vodafone Germany
> Amdocs OSS Solution for LTE
> Business Benefits
> Lessons learned
Confidentiality level on title masterVersion number on title master
May 9, 2011Christos BourlakosDepartment on title master
2
Confidentiality level on title masterVersion number on title master
May 9, 2011Christos BourlakosDepartment on title master
3
We want to winVodafone Deutschland – this is who we are
“We base our future structures and actions on the qualities of the Vodafone Way: Simplicity, speed and trust. Every process, every product, every service without added value for our customers will either be improved or abandoned This way we inspire ourimproved or abandoned. This way we inspire our customers and grow as a company.”
Friedrich JoussenChief Executive OfficerVodafone Deutschland
Confidentiality level on title masterVersion number on title master
May 9, 2011Christos BourlakosDepartment on title master
4
What is LTE and why do we need it ?GSM EDGE LTE
GPRS UMTS
LTE is the next evolutionary step for VFD2
Advantages of LTEg
Higher bandwidth
High Speed Internet in rural areas
Increase customer base
Reduce network TCO (technology, support systems, etc…)
Smart Network: self-Optimising and Self-Organising
Confidentiality level on title masterVersion number on title master
May 9, 2011Christos BourlakosDepartment on title master
5
Why did we choose the Amdocs solution for LTE ?
Amdocs proposed the right solution:
– Amdocs OSS as the strategic LTE platform to support network planning, rollout and maintenance
Amdocs is committed:
– To invest effort to understand our system landscape
– To deliver a solution within the required timelines
– To adopt VFD2‘s requirements into their OSS product roadmap (Integrated Roadmap)
– To support us in ensuring Return on Investment for our project, underlining the validity of our decision t l l OSS ith A dto replace legacy OSS with Amdocs
– To leverage the onsite Amdocs TEAM in Düsseldorf to ensure optimal communication and creative, reliable teamwork
Confidentiality level on title masterVersion number on title master
May 9, 2011Christos BourlakosDepartment on title master
Technical Scope & Principles
Scope of solution> Inventory of record for all LTE equipment, VLAN configurations, IP addressing etc.
> Automated processes for supporting rapid site roll out> Automated processes for supporting rapid site roll-out
> Utilise existing processes within legacy systems for planning capacity in the core networks and for service assurance
> Tactical interfaces phased to SID/SOA over time> Tactical interfaces phased to SID/SOA over time
Design Principles > All New LTE Objects and circuits models etc. to be mastered in Amdocs OSSe Objects a d c cu ts ode s etc to be aste ed docs OSS
> Use Process Automation & Device Models for LTE (Amdocs Product Packs)
> Minimise Object Duplication between systems
> Maximise process automation within Amdocs OSS to simplify user processes
Confidentiality level on title masterVersion number on title master
May 9, 2011Christos BourlakosDepartment on title master
> Maximise process automation within Amdocs OSS to simplify user processes
Technical Scope Summary Highlights Architecture Summary – Amdocs Modules
#1 #1DesignLTE RAN
Upper Layer Project Workflow (LTE Rollout Process Flow)
ce M
anag
er
ResourcePlanner -
Build
Templatest
Task Engine
R M
Tasks
s TE d
evic
e m
odel
sy
Inve
ntor
y -
#1A
utom
atio
nServ
ice
Fulfi
lmen
tAd
apto
r
#1
#1
#1DesignAutomation
LTE RANPlanner
O&MSupport
Am
docs
Res
ourc
Clie
nt Resource Manager
Delivery Engine
Design Records
Implementation
Pack
sric
sson
& H
uaw
ei L
TN
etw
ork
Tech
nolo
gy•M
obile
Bui
ld A
#1
#1Network Inventory
ResourcePlanner -
Plans
Implement &Change Job
StatusTeMIP
Plan and Jobs
•Er •N
Now & Next
Confidentiality level on title masterVersion number on title master
May 9, 2011Christos BourlakosDepartment on title master
TCCM/TTWOS
Cramer LTE RAN Connectivity Model (draft)
Confidentiality level on title masterVersion number on title master
May 9, 2011Christos BourlakosDepartment on title master
Technical Scope Summary Highlights Architecture Summary - Interfaces
Manual
Automated SID/SOA
START NDT/OpenlapRadio planning
Device
Radio Equipment
(K l D )
Existing
SID/SOA
Automated Interim / Tatical
FND TCCM/TTWOS
eNB & Lease Line connection
Creation
(Kernel Dummy)Creation
FNDFixed line planning
TCCM/TTWOSRequest are create
Status update
TCCM XML extraction
LocationC ti
LTE Amdocs OSS
Confidentiality level on title masterVersion number on title master
May 9, 2011Christos BourlakosDepartment on title master
extractionCreation
Business Benefits for VFD2
Planner Efficiency
– Accelerated processes for LTE planning and rollout
– Intelligent interfaces (eg. to eliminate double data entry)
Ensure Business Adoption
– Improved SME collaboration and transition readiness
Reduced TCOReduced TCO
– LTE Inventory Packs and LTE Device Packs are part of the core productand will reduce effort and implementation time when LTE hardware updates take place
Accelerate ROIAccelerate ROI
– The LTE implementation on Amdocs OSS will mark an early milestone in realizing return on investment
Confidentiality level on title masterVersion number on title master
May 9, 2011Christos BourlakosDepartment on title master
11
Lessons learned: how we are succeeding with Amdocs OSS for LTE
> Project approach:
– You must have onsite Amdocs presence
> Management Attention:> Management Attention:
– Presentation of VFD2 business objectives to Amdocs management at start of project was a good vehicle to reconfirm the importance of this project and secure Amdocs management attention
> Project Iteration Planning
– Find the right balance between rigorous design document signoff vs flexibility in the implementationp e e tat o
– Ensure visibility to future iterations and manage design implications at an early stage
Confidentiality level on title masterVersion number on title master
May 9, 2011Christos BourlakosDepartment on title master
12