Energy Savings Opportunity
• Electricity rates in the Philippines are second
highest in Asia (Singapore is highest)
• 40 – 60% of energy costs at most industrial plants
in Philippines come from electric motors
• 50%+ electricity wasted on motor systems due to:
Inefficient ‘induction motor’ technology
Inefficient Drive systems
Power Anomalies
Lack of maintenance (only ‘fixed when broken’)
2
![Page 3: MHC ESPC Presentation rev1](https://reader030.vdocuments.us/reader030/viewer/2022013122/55ac05481a28ab94518b4616/html5/thumbnails/3.jpg)
Motor System Inefficiencies
3
Induction
Motor
Power Anomalies
Drive
System
![Page 4: MHC ESPC Presentation rev1](https://reader030.vdocuments.us/reader030/viewer/2022013122/55ac05481a28ab94518b4616/html5/thumbnails/4.jpg)
Energy Efficiency Solutions
• Replace Induction Motors (IM) with Permanent
Magnet Synchronous Motors (PMSM), Super
Premium, or IE4 Efficiency Class.
• Correct Power Anomalies
• Refurbish and recalibrate Drive System
4
![Page 5: MHC ESPC Presentation rev1](https://reader030.vdocuments.us/reader030/viewer/2022013122/55ac05481a28ab94518b4616/html5/thumbnails/5.jpg)
Motor Electrical Losses
5
PMSM: Rotor loss & rotor iron loss are eliminated = energy savings
Efficiency is equivalent to IE3 or NEMA Premium
![Page 6: MHC ESPC Presentation rev1](https://reader030.vdocuments.us/reader030/viewer/2022013122/55ac05481a28ab94518b4616/html5/thumbnails/6.jpg)
Motor Savings
(7200 operating hours/year)
6
0
20000
40000
60000
80000
100000
120000
140000
160000
Existingpower drawn
RewoundMotor
Rewound +EMDS
Upgrade toHEM
HEM +EMDS
kW
Hrs
kWhr, 45kW
26%41%
61%
![Page 7: MHC ESPC Presentation rev1](https://reader030.vdocuments.us/reader030/viewer/2022013122/55ac05481a28ab94518b4616/html5/thumbnails/7.jpg)
Other Technologies
7
![Page 8: MHC ESPC Presentation rev1](https://reader030.vdocuments.us/reader030/viewer/2022013122/55ac05481a28ab94518b4616/html5/thumbnails/8.jpg)
Under an Energy Savings
Performance Contract (ESPC)
![Page 9: MHC ESPC Presentation rev1](https://reader030.vdocuments.us/reader030/viewer/2022013122/55ac05481a28ab94518b4616/html5/thumbnails/9.jpg)
What is ESPC?
• Develops, finances and implements end-use energy efficiency projects (EEPs) at energy consuming facilities (Hosts) and risks payment for its services on actual savings performance of the EEPs.
9
A performance-based contract with an Energy Services Company (ESCO) that:
![Page 10: MHC ESPC Presentation rev1](https://reader030.vdocuments.us/reader030/viewer/2022013122/55ac05481a28ab94518b4616/html5/thumbnails/10.jpg)
ESPC Illustration
E + O&M
E + O&M E + O&M
HOST Profit
ESA Services
FinancingDebt Servicing
HOSTProfit
E+O&MCost Savings
Ho
st C
ash
flo
w
Before During After
![Page 11: MHC ESPC Presentation rev1](https://reader030.vdocuments.us/reader030/viewer/2022013122/55ac05481a28ab94518b4616/html5/thumbnails/11.jpg)
ESCO “Turnkey” Services
• Investment Grade Energy Audit (IGA)
• Comprehensive Engineering Design
• Project Financing
• Complete Installation and Commissioning
• Long-term Performance Guarantees
• Savings Measurement &Verification (IPMVP)
• Ongoing Equipment Maintenance
11
![Page 12: MHC ESPC Presentation rev1](https://reader030.vdocuments.us/reader030/viewer/2022013122/55ac05481a28ab94518b4616/html5/thumbnails/12.jpg)
Who is Machine HealthCareTM?
• MHC is a local ESCO that implements and funds
new energy-efficient industrial motor systems
under the ESCO Shared Savings model.
• Under Shared Savings, MHC provides 100% of all
upfront capital cost for it to implement the Motor
Systems in exchange for receiving a majority of the
Savings over the specified ESPC term.
![Page 13: MHC ESPC Presentation rev1](https://reader030.vdocuments.us/reader030/viewer/2022013122/55ac05481a28ab94518b4616/html5/thumbnails/13.jpg)
Host approves
Project Concept
MHC Develops initial
“Project Concept” Proposal
No Host
Payment
Host signs LOU for MHC to conduct IGA with agreed
“Minimum Criteria” as basis for “IGA Fee”
IGA completed that meets
“Minimum Criteria”
MHC Begins Project Installation
NO
YES
Host signs ESA with MHC
to implement Project per IGA
YES
NO
Host Pays
IGA Fee
No Host
Payment
NO
YES
MHC Project Development Process
YES
![Page 14: MHC ESPC Presentation rev1](https://reader030.vdocuments.us/reader030/viewer/2022013122/55ac05481a28ab94518b4616/html5/thumbnails/14.jpg)
MHC MANAGEMENT TEAM
LEONARDO A. DAYON
• President, Machine HealthCare
• Founder, ALPS Maintaineering Services, Inc.
• Professional Electrical Engineer
JESSIE L. TODOC
• Project Manager, Machine HealthCare
• Registered Electrical Engineer
• MBA
14
![Page 15: MHC ESPC Presentation rev1](https://reader030.vdocuments.us/reader030/viewer/2022013122/55ac05481a28ab94518b4616/html5/thumbnails/15.jpg)
MHC Principals
Thomas K. Dreessen
• Formed ESCOs in 10 Countries & developed EEPs in 24 Countries
• Financed over $200 million of “savings-based” EEPs including
the first ones in eastern Europe in 1995
• Created SPC “paid-from-savings” structure and debt guarantee
mechanisms for EE financings in Mexico
• Created/conducted EE loan training program Mexican banks
• Past President of US National Association of ESCOs
• Past Board Member & Chairman of International Committee for
the Alliance to Save Energy
• Chairman of Evaluation Efficiency Organization (“EVO”)
• BBA - Accounting; MBA and a Certified Public Accountant
![Page 16: MHC ESPC Presentation rev1](https://reader030.vdocuments.us/reader030/viewer/2022013122/55ac05481a28ab94518b4616/html5/thumbnails/16.jpg)
Bruce K. Colburn, Ph.D., P.E.
• 30+ years of experience in energy engineering and
development of EEPs for ESCOs
• Involved in developing over $300 million of EEPs including:
- $ 10 Million project Brazil Aluminum plant
- Design of $12 million ESCO project at Russian Steel Mill
- Implementing a $4 Million ESCO project @ GE Aircraft.
• Former principal for 13 years of Texas Energy Engineers
• Member of U. S. Association of Energy Engineers
• Ph.D. - Electrical Engineering
MHC Principals
![Page 17: MHC ESPC Presentation rev1](https://reader030.vdocuments.us/reader030/viewer/2022013122/55ac05481a28ab94518b4616/html5/thumbnails/17.jpg)
MHC Core Strengths
•Management Team with deep experience in local
motor implementation combined with international
ESCO, project finance and industrial EEP expertise
•Unique financial and industrial technical know-how;
•Access to best-in-class international and domestic
technologies that deliver most cost-effective energy
efficieincy solutions;
•Access to cost effective capital for funding EEPs on
a Shared Savings basis.
17
![Page 18: MHC ESPC Presentation rev1](https://reader030.vdocuments.us/reader030/viewer/2022013122/55ac05481a28ab94518b4616/html5/thumbnails/18.jpg)
Host Benefits from ESPC
• Positive Cash Flow:
No upfront capital to develop/implement EEP;
Savings payments from current operating costs
• Ownership transferred to Host at end of ESPC Term
• No development or implementation costs or risks
• Savings are Measured & Verified per IPMVP
• Improved competitiveness and “green” footprint