WWW.vujannat.ning.COM Connecting VU Students FINALTERM EXAMINATION FALL 2007 MGT613 - PRODUCTION / OPERATIONS MANAGEMENT (Session - 4 ) Marks: 60 Time: 150min StudentID/LoginID: ______________________________ Student Name: ______________________________ Center Name/Code: ______________________________ Exam Date: Wednesday, March 05, 2008 Please read the following instructions carefully before attempting any question: All questions are compulsory. This exam consists of 15 Multiple Choice Questions (MCQs) carrying 1 mark each; 5 True/False statements carrying 1 mark each;5 Fill in the Blanks carrying 1 mark each; 1 Short Question carrying 5 marks; 2 Numerical Problems carrying 10 marks each; and 1 descriptive question carrying 10 marks. For each MCQ, read the available choices carefully and choose the most appropriate choice which you consider is the correct answer. To answer fill in the blanks questions, write the word which you think is the most suitable by comprehending the whole phrase. Attempt numerical problems with complete working (calculations). Failure to show complete working will result in deduction of marks. Remember not to spend too much time on any one objective type question since all objective type questions carry equal marks; it is important to manage your time according to the marks allocated to each question. Save your answer before proceeding to the next question. Do not click the “Finish” button while solving your paper. Once you clicked the “Finish” button, you will not be able to access your paper again. Click it at the end of your paper. That means you have submitted your complete paper. A clock is given in the exam software. Software will automatically close at the end of given time. Use of mobile phone is strictly prohibited. Switch off your mobile phone during the exam. Calculators are allowed to solve numerical problems. Mobile phones are not allowed for the same purpose. Failure to comply with the Supervisor’s directions will result in your test being cancelled. Please comply with supervisor’s directions to avoid any unpleasant event.

Upload: httpmajidvacom

Post on 04-Apr-2015

120 views

Category:

Documents


7 download

DESCRIPTION

MGT613 COLLECTION OF OLD PAPERS

TRANSCRIPT

WWW.vujannat.ning.COM Connecting VU Students

FINALTERM EXAMINATION

FALL 2007

MGT613 - PRODUCTION / OPERATIONS MANAGEMENT (Session - 4 )

Marks: 60

Time: 150min

StudentID/LoginID: ______________________________

Student Name: ______________________________

Center Name/Code: ______________________________

Exam Date: Wednesday, March 05, 2008

Please read the following instructions carefully before attempting any question:

All questions are compulsory.

This exam consists of 15 Multiple Choice Questions (MCQs) carrying 1 mark each; 5 True/False statements carrying 1 mark each;5 Fill in the Blanks carrying 1 mark each; 1 Short Question carrying 5 marks; 2 Numerical Problems carrying 10 marks each; and 1 descriptive question carrying 10 marks.

For each MCQ, read the available choices carefully and choose the most appropriate choice which you consider is the correct answer.

To answer fill in the blanks questions, write the word which you think is the most suitable by comprehending the whole phrase.

Attempt numerical problems with complete working (calculations). Failure to show complete working will result in deduction of marks.

Remember not to spend too much time on any one objective type question since all objective type questions carry equal marks; it is important to manage your time according to the marks allocated to each question.

Save your answer before proceeding to the next question.

Do not click the “Finish” button while solving your paper. Once you clicked the “Finish” button, you will not be able to access your paper again. Click it at the end of your paper. That means you have submitted your complete paper.

A clock is given in the exam software. Software will automatically close at the end of given time.

Use of mobile phone is strictly prohibited. Switch off your mobile phone during the exam.

Calculators are allowed to solve numerical problems. Mobile phones are not allowed for the same purpose.

Failure to comply with the Supervisor’s directions will result in your test being cancelled. Please comply with supervisor’s directions to avoid any unpleasant event.

For Teacher's use only Question 1 2 3 4 5 6 7 8 9 10 Total

Marks Question 11 12 13 14 15 16 17 18 19 20

Marks Question 21 22 23 24 25 26 27 28 29

Marks Question

Marks Question No: 1 ( Marks: 1 ) - Please choose one The purpose of _________ is to avoid having one or a few employees stuck in monotonous jobs. ►

Job enlargement

Job rotation

Job enrichment

Job description

Question No: 2 ( Marks: 1 ) - Please choose one Which of the following factors should a company consider while deciding upon a certain process choice? ►

Capital requirements, leadership skills, technology and labor

Technology, capital requirements, leadership skills and market conditions

Labor, raw materials, market conditions and capital requirements

Capital requirements, labor, technology and market conditions

Question No: 3 ( Marks: 1 ) - Please choose one The focus of ___________ is customer satisfaction by incorporating quality into all phases of the organization. ►

SWOT analysis

Quality based strategies

Operations strategies

► Organizational strategies

Question No: 4 ( Marks: 1 ) - Please choose one A disadvantage of __________ forecasts is the induction of personal biases. ►

Qualitative

Quantitative

Associative

All of the given options

Question No: 5 ( Marks: 1 ) - Please choose one Applied research appeals to a wide spectrum of business organizations mainly because: ►

It deals with a huge number of variables

It has potential for achieving commercial applications

It does not involve high costs

It is relatively easy to conduct

Question No: 6 ( Marks: 1 ) - Please choose one Cycle time can be calculated as: ►

D/OT

OT/D

D+OT

D-OT

Question No: 7 ( Marks: 1 ) - Please choose one The four "costs of quality" include all of the following except: ►

Internal failure costs

External failure costs

Supply chain failure costs

Prevention costs

Question No: 8 ( Marks: 1 ) - Please choose one Numerous quality improvement strategies exist. Which of the following is not a strategy discussed by the author? ►

ISO 9000

PPM Matrix approach

Statistical process control

Six Sigma approach

Question No: 9 ( Marks: 1 ) - Please choose one The popular "seven tools of quality control" include all of the following except: ►

Pareto chart

Cause and effect (fishbone) diagram

Scatter diagram

Brainstorming

Question No: 10 ( Marks: 1 ) - Please choose one Which of the following statements about Six Sigma is incorrect? ►

Six Sigma employs structured process improvement technique.

Six Sigma programs employ full time specialists called Black Belts.

Six Sigma approach is best suited for manufacturing process.

Data and metrics are vital in a Six Sigma approach

Question No: 11 ( Marks: 1 ) - Please choose one A key supply chain management strategy for some firms is to rely upon outsourcing of tasks. Identify the incorrect statement concerning outsourcing of tasks or functions from the following. ►

Outsourcing entails contracting with another firm to perform certain tasks or functions.

A primary incentive for firms outsourcing various functions is the desire to focus on core competencies.

► Firms that perform the outsourced tasks are specialists and are able to achieve

economies of scale with the greater volume of business.

All firms that outsource various activities achieve benefits including enhanced productivity, reduced cycle times, greater inventory turns, and higher customer service levels.

Question No: 12 ( Marks: 1 ) - Please choose one Which of the following statements concerning differences between continuous review (Q systems) and periodic review (P systems) inventory systems is false? ►

In periodic review systems, orders are placed after an elapsed period of time, P, has passed for a variable quantity of units.

In continuous review systems, orders are placed for a fixed quantity of goods after a variable length of time has passed.

Higher than normal demand during the order cycle leads to a shorter time between orders for Q Systems while in P Systems it leads to larger order sizes.

P systems require a perpetual inventory count while Q systems require a periodic inventory counting system.

Question No: 13 ( Marks: 1 ) - Please choose one Which one of the following is not an element of MRP System? ►

Inventory Record

Capacity Planning System

Master Scheduling

Sales and Operations Planning System

Question No: 14 ( Marks: 1 ) - Please choose one Which one of the following is not an element of lean thinking? ►

Value stream mapping

Specifying value from customer’s point of view

Striving for perfection

Increasing the production capacity

Question No: 15 ( Marks: 1 ) - Please choose one Which of the following statements is incorrect about lean thinking approach?

Lean thinking approach can be extended beyond the production process including finance, marketing and accounting functions

Lean thinking approach was popularized by Womack and Jones

Lean thinking approach can be easily applied to service operations

Lean thinking approach takes an internal perspective of the firm starting with the production process.

Question No: 16 ( Marks: 1 ) - Please choose one The measures of quality used in manufacturing processes can be readily transferred to service operations. ►

TRUE

FALSE

Question No: 17 ( Marks: 1 ) - Please choose one Parabolic trends are concaved upwards and downwards. ►

TRUE

FALSE

Question No: 18 ( Marks: 1 ) - Please choose one A Histogram is a simple chart that differentiates the vital few causes from trivial many causes. ►

TRUE

FALSE

Question No: 19 ( Marks: 1 ) - Please choose one The basic idea behind the ABC classification is to separately manage the inventories on the basis of the annual demand patterns. ►

TRUE

FALSE

Question No: 20 ( Marks: 1 ) - Please choose one Just-In-Time manufacturing approach is well suited for a job-shop type of production process.

TRUE

FALSE

Question No: 21 ( Marks: 1 ) Precedence diagram is used in _________ to display elemental tasks and sequence requirements. Question No: 22 ( Marks: 1 ) Operational strategies mostly function on two dimensions of quality management and ____________ . Question No: 23 ( Marks: 1 ) _____________is planning the tasks from the due date to determine the start date and/or any changes in capacity required. Question No: 24 ( Marks: 1 ) __________ refers to a system that renders unit or small lot production or service with varying specifications according to customer needs. Question No: 25 ( Marks: 1 ) __________ is the systematic study of the human motions used to perform an operation. Question No: 26 ( Marks: 5 ) Mr. Ali is the team leader at an organization ABC. While undertaking a project, he gave briefing to the team members about acceptance sampling. What could be the purpose of acceptance sampling in your view? How does acceptance sampling differ from process control? Question No: 27 ( Marks: 10 ) What are Gantt charts? How are they used in scheduling? What are the advantages and disadvantages of using Gantt charts? Question No: 28 ( Marks: 10 ) Given the following data:

Period No. of complaints 1 34 2 39 3 25 4 22 5 40

Prepare a forecast using each of these approaches: a) A three period moving average b) A weighted average using weights of 0.50 (most recent), 0.30 and 0.20

c) Exponential smoothing with a smoothing constant of 0.40 Note: Give the answers with complete working (calculations). Failure to show complete working will result in deduction of marks. Question No: 29 ( Marks: 10 ) The Dine Corporation is both a producer and a user of brass couplings. The firm operates 180 days a year and uses the couplings at a steady rate of 40 per day. Couplings can be produced at a rate of 200 per day. Annual storage cost is $1 per coupling and machine setup cost is $30 per run. a. Determine the economic run size b. Approximately how many runs per year will there be? c. Compute the maximum inventory level Note: Give the answers with complete working (calculations). Failure to show complete working will result in deduction of marks.

WWW.vujannat.ning.COM Connecting VU Students

MIDTERM EXAMINATION

FALL 2007

MGT613 - PRODUCTION / OPERATIONS MANAGEMENT (Session - 5 )

Marks: 40

Time: 120min

StudentID/LoginID: ______________________________

Student Name: ______________________________

Center Name/Code: ______________________________

Exam Date: Wednesday, November 21, 2007

Please read the following instructions carefully before attempting any question: All questions are compulsory.

This exam consists of 10 Multiple Choice Questions (MCQs) carrying 1 mark each; 5 Fill in the Blanks carrying 1 mark each; 3 Short Questions carrying 5 marks each; and 1 descriptive question –carrying 10 marks.

For each MCQ, read the available choices carefully and select the most appropriate choice which you consider is the correct answer, by clicking on the appropriate check box.

To answer fill in the blanks questions, write the word which you think is the most suitable by comprehending the whole phrase.

Remember not to spend too much time on any one objective type question since all objective type questions carry equal marks; it is important to manage your time according to the marks allocated to each question.

Calculators are allowed to solve numerical problems. Mobile phones are not allowed for the same purpose.

Save your answer before proceeding to the next question.

Do not click the “Finish” button while solving your paper. Once you clicked the “Finish” button, you will not be able to access your paper again. Click it at the end of your paper. That means you have submitted your complete paper.

A clock is given in the exam software. Software will automatically close at the end of given time.

Use of mobile phone is strictly prohibited. Switch off your mobile phone during the exam.

Failure to comply with the Supervisor’s directions will result in your test being cancelled. Please comply with supervisor’s directions to avoid any unpleasant event.

For Teacher's use only Question 1 2 3 4 5 6 7 8 9 10 Total

Marks Question 11 12 13 14 15 16 17 18 19

Marks Question

Marks Question No: 1 ( Marks: 1 ) - Please choose one Operations manager is responsible for all of the following except: ►

Forecasting

Capacity planning

Inventory management

Distribution of organizations’ goods

Question No: 2 ( Marks: 1 ) - Please choose one The sources of competitive advantage include : ►

Price

Quality

Location

All of the given options

Question No: 3 ( Marks: 1 ) - Please choose one External factors include all of the following except: ►

Economic conditions

Political conditions

Competitive forces

Human resources

Question No: 4 ( Marks: 1 ) - Please choose one A 35% chance of demand of 3000 units, 40% chance of demand of 2000 units and 25% chance of demand of 1000 units represent a state of: ►

Certainty

Uncertainty

Risk

None of the given options

Question No: 5 ( Marks: 1 ) - Please choose one _________ is an optimistic approach. ►

Maximin

Maximax

Laplace

Minimax regret

Question No: 6 ( Marks: 1 ) - Please choose one Using a simple three-period moving average forecast model, what would the forecast of demand be for the upcoming week 6? The historical demands are shown below: Week Demand 1 21 2 25 3 20 4 13 5 15 ►

22 units

18.25 units

18.8 units

16 units

Question No: 7 ( Marks: 1 ) - Please choose one Technique for fitting a line to a set of points is called ____________. ►

Least square line

Mean Squared Error (MSE)

Mean absolute Deviation (MAD)

Regression

Question No: 8 ( Marks: 1 ) - Please choose one Availability can be calculated by the formula: ► (MTBF)/(MTBF+MTR)

MTR/MTBF

(MTBF)/(MTBF-MTR)

(MTR)/(MTR-MTBF)

Question No: 9 ( Marks: 1 ) - Please choose one The formula to calculate breakeven quantity is: ►

FC+ R+VC

R/(FC-VC)

FC/ (R-VC)

VC / (R-FC)

Question No: 10 ( Marks: 1 ) - Please choose one _________ is a user of resources to transform inputs into some desired outputs. ►

Productive system

Production system

Supply chain management

Lean production system

Question No: 11 ( Marks: 1 ) ________ is an elaborated and systematic plan of action with defined resources. Question No: 12 ( Marks: 1 ) ________ is a long term upward or downward movement in data. Question No: 13 ( Marks: 1 ) ________ refers to a situation in which a product, part or system does not perform as intended. Question No: 14 ( Marks: 1 ) ____________strategy is longer in terms of time horizon. Question No: 15 ( Marks: 1 ) OSHA stands for__________________. Question No: 16 ( Marks: 5 )

Justify the statement “Both qualitative and quantitative techniques should be used together to generate a realistic forecast.” Question No: 17 ( Marks: 5 ) The manager of a crew that installs carpeting has tracked the crew’s output over the past several weeks, obtaining theses figures:

Week Crew size Yards installed1 6 962 2 4 870 3 5 940 4 3 820

Compute the labor productivity for each of the weeks. On the basis of your calculations, what can you conclude about crew size and productivity? Question No: 18 ( Marks: 5 ) A small building contractor has recently experienced two successive years in which work opportunities exceeded the firm’s capacity. The contractor must now make a decision on capacity for next year. Estimated profits under each of the two possible states of nature as shown in the table below:

Next year’s demandAlternative Low High

Do nothing $40,000 $30,000 Expand $60,000 $40,000 Subcontract $20,000 $10,000

Now if probabilities of low and high demand are: P (low) = 0.3 and P (high) = 0.7, determine the expected profit of each alternative. Which alternative is best? Why? Question No: 19 ( Marks: 10 ) What are the key reasons for poor competitiveness of some companies?