Determine the outcome or purpose of acquiring metric data Internal health check Management visibility DCMA “Standard Operating Procedure (SOP) Contractor’s Internal Assessment or Self Audit of their Property Management System”TRANSCRIPT
Metrics for Property Management
Eric Fassett
• Metrics - standards of measurement by which efficiency, performance, progress, or quality of a plan, process, or product can be assessed.
• Determine the outcome or purpose of acquiring metric data
• Internal health check• Management visibility• DCMA “Standard Operating
Procedure (SOP) Contractor’s Internal Assessment or Self Audit of their Property Management System” 5-25-11
• Determine what and how populations are to be sampled
• Capital• Tagged Customer• Material
• Determine the criteria to be evaluated
• Determine how the results are to be assessed
• Acquisition– Required– Contractually Authorized– Properly Charged– Support Documentation – Reviews of Available Excess– MILSTRIP Requisitions Properly
Prepared
• Acquisition (Cont.)– Demonstrates Appropriate Follow-up
Actions– Transfer Modifications Obtained
• Receiving– Receipt Recording Accuracy– Receipt Timeliness– Discrepancies Reported on Time– Identification Performed– Identification Timeliness
• Records– Posting Completeness– Posting Timeliness– Location Accuracy– Backup Documentation– Data Elements Recorded– Floor-to-record
• Physical Inventory– Performance– Posting Completed on Time– Line Item Accuracy– Dollar Value Accuracy
• Subcontract Management– Proper Flowdown of Property Clauses– Assessments Completed on Time– Limited Surveys Returned on Time– Reports Reconciled on Time– Acceptable Loss Report %
• Reports– LDD Reports Completed on Time– Physical Inventory Reports Completed
on Time– Self Assessment Reports Completed on
Time
• Relief from Stewardship Responsibility– Transactions Complete– Data Elements Accurate– Excess Reporting Timeliness– Authorized Disposals– Disposal Timeliness
• Utilization– Authorized Use of Assets– Justified Retention– Movement Authorized– Consumption Reasonable (material)– Storage Adequate
• Maintenance– Maintenance/Calibration Performed
• Contract Closeout– Timely Closeouts Performed– All Records Closed – Contract Closeout Forecast