  As for the emails from the outside, the sender should be checked. Such emails may contain spyware or malicious codes in the link or the attached file. Classification: Saudi Aramco Company General Use Dear Alvin - FYI This email has been classified as Saudi Aramco: Company General Use on Thursday, April 23, 2015 10:18:47 AM by Sagour , Hassan S.  From: Sagour, Hassan S Sent: Thursday, April 23, 2015 10:18 AM To: Omary, Ibrahim A (PID) Subject: RE: CRM Classification: Saudi Aramco Company General Use Dear Ibrahim, Based on our discussion and further technical discussions with the contractor, the attached method statement cannot be accepted as is. You will find my comments in the form of sticky notes on the attached document. Basically, the contractor needs to address the following: 0 Abrasive material used, shall b e approved by Saudi Aramco. Not all sources of steel shots/grits are acceptable. 0 In their system, they n eed to control the salt c ontamination of abrasives to meet the requirements of SAES-H-001 0 Upon completion of blasting, substrates shall be tested f or salt contamination to avoid osmoti c blistering

Upload: muhammedemraan

Post on 02-Nov-2015

216 views

Category:

Documents


0 download

DESCRIPTION

Method Statement for Indoor Auto Blasting

TRANSCRIPT

  • As for the emails from the outside, the sender should be checked. Such emails may contain spyware or malicious codes in the

    link or the attached file.

    Classification: Saudi Aramco Company General Use

    Dear Alvin - FYI

    This email has been classified as Saudi Aramco: Company General Use on Thursday, April 23, 2015 10:18:47 AM by Sagour, Hassan S.

    From: Sagour, Hassan S

    Sent: Thursday, April 23, 2015 10:18 AM

    To: Omary, Ibrahim A (PID)

    Subject: RE: CRM

    Classification: Saudi Aramco Company General Use

    Dear Ibrahim,

    Based on our discussion and further technical discussions with the contractor, the attached method

    statement cannot be accepted as is. You will find my comments in the form of sticky notes on the

    attached document.

    Basically, the contractor needs to address the following:

    0 Abrasive material used, shall be approved by Saudi Aramco. Not all sources of steel shots/grits are

    acceptable.

    0 In their system, they need to control the salt contamination of abrasives to meet the requirements

    of SAES-H-001

    0 Upon completion of blasting, substrates shall be tested for salt contamination to avoid osmotic

    blistering

  • Once their system is rectified, they should update the changes on the method statement and re-submit

    for approval.

    Best Regards,

    Hassan

    This email has been classified as Saudi Aramco: Company General Use on Thursday, April 23, 2015 10:18:05 AM by Sagour, Hassan S.

    From: Omary, Ibrahim A (PID)

    Sent: Wednesday, April 22, 2015 7:29 AM

    To: Sagour, Hassan S

    Subject: RE: CRM

    Classification: Saudi Aramco Company General Use

    Thanks & I appreciated your usual support .

    This email has been classified as Saudi Aramco: Company General Use on Wednesday, April 22, 2015 7:29:01 AM by Omary, Ibrahim A (PID).

    From: Sagour, Hassan S

    Sent: Wednesday, April 22, 2015 7:23 AM

    To: Omary, Ibrahim A (PID)

    Subject: RE: CRM

    Classification: Saudi Aramco Company General Use

    Good morning Ibrahim,

  • Please note that I had a conference call from the technical engineer from Samsung, and he promised to

    send me a few photos illustrating the system they are using. I am waiting for their feedback so I can

    properly review this procedure.

    Best Regards,

    Hassan

    This email has been classified as Saudi Aramco: Company General Use on Wednesday, April 22, 2015 7:23:09 AM by Sagour, Hassan S.

    From: Omary, Ibrahim A (PID)

    Sent: Tuesday, April 21, 2015 10:06 AM

    To: Sagour, Hassan S

    Subject: RE: CRM

    Classification: Saudi Aramco Company General Use

    Dear Hassan ,

    SAMSUNG representative will contact you to answer all questions about the Auto Blasting System .

    Thanks ,

    This email has been classified as Saudi Aramco: Company General Use on Tuesday, April 21, 2015 10:05:48 AM by Omary, Ibrahim A (PID).

    From: Sagour, Hassan S

    Sent: Monday, April 20, 2015 10:55 AM

    To: Omary, Ibrahim A (PID)

    Subject: CRM

  • Classification: Saudi Aramco Company General Use

    Salam Ibrahim

    Please call me at your convenience at 880-9581

    Thanks Hassan Alagour / CSD

    This email has been classified as Saudi Aramco: Company General Use on Monday, April 20, 2015 10:55:21 AM by Sagour, Hassan S.

    The contents of this email, including all related responses, files and attachments transmitted

    with it (collectively referred to as this Email), are intended solely for the use of the

    individual/entity to whom/which they are addressed, and may contain confidential and/or

    legally privileged information. This Email may not be disclosed or forwarded to anyone else

    without authorization from the originator of this Email. If you have received this Email in

    error, please notify the sender immediately and delete all copies from your system. Please

    note that the views or opinions presented in this Email are those of the author and may not

    necessarily represent those of Saudi Aramco. The recipient should check this Email and any

    attachments for the presence of any viruses. Saudi Aramco accepts no liability for any

    damage caused by any virus/error transmitted by this Email.

  • AdministratorSticky NoteAbrasive material shall be approved by Saudi Aramco, as below:

    5000441776 10015645 Manufacturer WINOA FRANCE (Wheelabrator-Allevard) 5001318596 10027128 Manufacturer Pometon

  • AdministratorSticky NoteWhat about dust contamination. In abrasive material, the sulfate content shall be less than 50 PPM, the chloride shall be less than 50 PPM, and calcium carbonate shall be 0.1 0% maximum by weight.

    AdministratorSticky Notewhat about salt contamination? It shall not exceed 40 mg/m