METHOD STATEMENT
Description ofTask / Activity:
METHOD STATEMENT FOR PAINTING WORKS
Project Name:
Company:
Associated JSA
Reference Number Attached
Yes No
Prepared By:
Position: Mechanical Engineer Date: 05th July,2015
Discipline Engineer:
Position: Mechanical Engineer Date: 05th July, 2015
Contractor Project Manager Review:
Position: MEP Manager Date: 05th July, 2015
DL Discipline Engineer/Manager Review:
Bassam Alameer
Position: MEP Manager Date: 05th July, 2015
DL HSE Manager Review:
Position: Date:
WPF Review:
Position: Date:
Key Plant and Tools Required:
Paint brush, roller, Scaffolding and Ladder
DL/HSE/MS/0001 Rev. 01
Document Reference:
METHOD STATEMENT
Key Materials Required:
Paint
Other Essential Equipment:
(ie: access platforms/winches/ladders etc)
Specific Identified Residual Hazards:(or refer to the task specific risk assessment(s))
Specific Staff Training Requirements:
WORKING AT HEIGHT
Temporary Supports and Props needed to facilitate the works:
NONE
Method of Access and Egress to the work area:
LADDERS
SCAFFOLDS
Fall Protection Measures:(Where work at height cannot be eliminated - consider both Personnel & Materials)
SAFETY HARNESS
Hazardous Substances:(Attach COSHH Assessments and MSDS)
Very Toxic Harmful/Irritant
Corrosive Dangerous for the
environment
Oxidising Highly flammable
Explosive
Applicable: No Yes No Yes Yes Yes No
SWL's:
(Detail any limits on the loadings applicable to temporary plant/equipment or fixed elements of the structure where the work is taking place.)
Required Personnel Protective Equip.:
OTHER:
1: Coveralls
DL/HSE/MS/0001 Rev. 01
METHOD STATEMENT2: Gas Detector
3: Gas Mask/Hood
:
Safety Boots
Hard Hats Safety Gloves
Hearing Protection
Respiratory Protection
Eye Protection
High Visibility
Welder Shield
Face Shield Fall Arrest Disposable Mask
Goggles
Emergency Procedures:
First Aid Facilities:
Name of On-Site First Aider: ABBAS
First Aid Box Location:
Location of Nearest Hospital:
Other Information & Comments:
RESPONSIBILITIES
1) All work will be undertaken by qualified competent persons with experience of the type of work described above, and in all cases in full accordance with safety procedures specified.
2) It is the responsibility of the supervisor to ensure prior to giving any personnel the job of Painting that they are fully aware of the hazards involved and are competent to carry out the work safely.
3) The supervisor must ensure that this procedure is fully complied with.
DL/HSE/MS/0001 Rev. 01
METHOD STATEMENT
Sequence of Operations:(Specifying methods of working, tools, materials and equipment utilised)
1) Ensure the surface is free from any grease and dust prior to application of
painting.
2) Paint/ Primer to properly mixed in a steel pail separately.
3) Apply the primer by means of paint roller/ brush to as many as coat to
achieve the thickness.
4) Allow the painted surface to fully cue as per the painting procedure and
project specification.
5) Carry out the second coat and final coat painting as per approved project
specification.
6) After the completion of Final Inspection remove ladders and scaffolds for the
work area.
7) Remove all the debris and garnet spillage from the work spot
8) All the tools from the work area to be removed and area to be thoroughly
clean the area.
9) For Mixing ratio and dry time refer Data Sheet.
DL/HSE/MS/0001 Rev. 01
METHOD STATEMENTMETHOD STATEMENT ACCEPTANCE FORM
TITLE PAINTING WORKS ON PIPES IN POWER GENERATION BUILDING
DATE TRADENAME
PRINT SIGNATURE
RESPONSIBLE ENGINEER / SUPERVISOR
DL/HSE/MS/0001 Rev. 01
I HAVE READ AND UNDERSTOOD THE METHOD STATEMENT FOR THE WORK ACTIVITIES ABOVE