October 27, 2009, New York, NY USA 

MDMS Implementation and Lessons Learned 

Wayne Young Director Meter Reading, Billing & Collections 

JEA Jacksonville, Florida 

METERING INTERNATIONAL SMART ENERGY 

EAST COAST

Page 2: METERING INTERNATIONAL · • Network and Meter Asset Management • Remote Connect/Disconnect –Virtual Move In/Out • Outage Management • Distribution planning and engineering

JEA at a Glance 

– Originally “Jacksonville Electric Authority” • In 1997 JEA took over water and sewage for the city 

• About 2100 permanent employees – Customer base 

• 420,000 electric • 305,000 water • 231,000 sewer 

– Service Territory: 900 square miles – 8 th Largest Municipal in the US 

October 27, 2009, New York, NY USA

Page 3: METERING INTERNATIONAL · • Network and Meter Asset Management • Remote Connect/Disconnect –Virtual Move In/Out • Outage Management • Distribution planning and engineering

AMR Project Overview 

• Main focus: customer service, system reliability and accuracy, and cost savings 

•  Replacement or retro‐fit of approx. 360,000 electric an 280,000 water meters to communicate with network 

•  Development of interfaces to JEA information systems including its customer information systems (CC&B), outage management system (OMS), field maintenance system (FMS), Meter Data Management System (MDMS) etc. 

October 27, 2009, New York, NY USA

Page 4: METERING INTERNATIONAL · • Network and Meter Asset Management • Remote Connect/Disconnect –Virtual Move In/Out • Outage Management • Distribution planning and engineering

RF/Fiber Optic Network Meter Reading System 

M e te r ­R FE 

C e llM a s te r 

C e lln e t S y s tem C on tro lle r 

O C D B 

M ic roC e ll C o n tro lle r  (M C C ) 

R F  T ra n sm iss io n : ­  1  w a y  c om m un ica tio n ­  T ra n sm its  e ve ry  5  m in u te s 

R F  T ra n sm is s io n : ­  2  w a y  com m un ica tio n ­  T yp ica l c om m un ica tio n  o n ce  p e r d a y ­  O n ­d em and  c a p ab ility 

L e a se d  c ircu it: ­  2  w a y  c om m un ic a tio n ­  A lw a y s  o n 

October 27, 2009, New York, NY USA 

720,000 METERS 

32 MASTER CELLS 

3,200 MICRO CELLS 

Network center

Page 5: METERING INTERNATIONAL · • Network and Meter Asset Management • Remote Connect/Disconnect –Virtual Move In/Out • Outage Management • Distribution planning and engineering

Metering, Billing/CIS America 2008, San Diego, CA 

JEA Territory – AMI Coverage

Page 6: METERING INTERNATIONAL · • Network and Meter Asset Management • Remote Connect/Disconnect –Virtual Move In/Out • Outage Management • Distribution planning and engineering

Metering, Billing/CIS America 2008, San Diego, CA 

AMI Overview – AMI Coverage

Page 7: METERING INTERNATIONAL · • Network and Meter Asset Management • Remote Connect/Disconnect –Virtual Move In/Out • Outage Management • Distribution planning and engineering

Metering, Billing/CIS America 2008, San Diego, CA 

AMI Overview – Micro Cell Locations

Page 8: METERING INTERNATIONAL · • Network and Meter Asset Management • Remote Connect/Disconnect –Virtual Move In/Out • Outage Management • Distribution planning and engineering

Metering, Billing/CIS America 2008, San Diego, CA 

AMI Overview – Micro Cell Locations

Page 9: METERING INTERNATIONAL · • Network and Meter Asset Management • Remote Connect/Disconnect –Virtual Move In/Out • Outage Management • Distribution planning and engineering

Why JEA Chose MDMS? 

• Initial plan to use ‘new’ CIS (CAIR) 

–JEA’s new Customer Information System (CIS) had not fully stabilized and adding complex interfaces to it was not feasible 

• JEA built its own MDM system to store data, interface with vendor data base and eliminate/reduce new CIS interfaces 

• Complexity and lack of internal SMEs in AMR lead to external vendor 

October 27, 2009, New York, NY USA

Page 10: METERING INTERNATIONAL · • Network and Meter Asset Management • Remote Connect/Disconnect –Virtual Move In/Out • Outage Management • Distribution planning and engineering

– Single repository for all meter sources 

– Easier access to meter data for analysis and business intelligence 

– Interfaces to other essential systems (Outage management, System Planning, Data Warehouse, etc.) 

–MDMS will be easier to change for BPL, mesh RF and other AMR technologies 

– Easier to develop new exception processing in MDMS 

October 27, 2009, New York, NY USA 

Why JEA Chose MDMS?

Page 11: METERING INTERNATIONAL · • Network and Meter Asset Management • Remote Connect/Disconnect –Virtual Move In/Out • Outage Management • Distribution planning and engineering

–Customer, Operational, Revenue Enhancements •  Network and Meter Asset Management 

•  Remote Connect/Disconnect 

– Virtual Move In/Out 

•  Outage Management 

•  Distribution planning and engineering •  Bellwether Meters for Outage Management 

•  Load Research and Management 

•  Leak detection, excessive consumption, etc. 

Scope of Initial AMS MDMS Project 

October 27, 2009, New York, NY USA

Page 12: METERING INTERNATIONAL · • Network and Meter Asset Management • Remote Connect/Disconnect –Virtual Move In/Out • Outage Management • Distribution planning and engineering

Other Read Sources 

(FFDS, FMS, CC&B, etc.) 

Other Read Sources 

(FFDS, FMS, CC&B, etc.) 

MV90 MV90 

AMR (Cellnet) AMR 

(Cellnet) 

ITRON ITRON 

MDMS 

CC&B 

GIS 

Data Warehouse 

• Daily usage • VEE •SLS Data •Interval usage 

• Connectivity  data 

• Interval Data • Winter Peak • Summer Peak • Non­Coincident Peak 

• Customer data 

Meter Reads  Source Systems  Data Repository  BI Applications 

Ad hoc Analytics 

Canned Reports 

GIS 

10 

20 

30 

40 

50 

60 

70 

80 

90 

1st Qtr  2nd Qtr  3rd Qtr  4th Qtr 

East 

West North 

•Transformer non coincient peak •Transformer winter peak •Transformer summer peak 

Business Intelligence 

•Transformer peak threshold •Transformer peak by month 

•Daily transformer load 

• Daily Usage 

Load Research 

AMI System Flow & Business Intelligence 

October 27, 2009, New York, NY USA

Page 13: METERING INTERNATIONAL · • Network and Meter Asset Management • Remote Connect/Disconnect –Virtual Move In/Out • Outage Management • Distribution planning and engineering

–MDMS Web Viewer (CSR/Billing Support/other areas) 

–MDMS Interface to Outage Application • Special Outage Interface – Duval County School Board 

–Load and Customer Research 

AMI Overview – MDM System Interfaces 

October 27, 2009, New York, NY USA

Page 14: METERING INTERNATIONAL · • Network and Meter Asset Management • Remote Connect/Disconnect –Virtual Move In/Out • Outage Management • Distribution planning and engineering

AMI Overview – MDMS Web Viewer 

October 27, 2009, New York, NY USA 

Daily reads for one month period

Page 15: METERING INTERNATIONAL · • Network and Meter Asset Management • Remote Connect/Disconnect –Virtual Move In/Out • Outage Management • Distribution planning and engineering

AMI Overview – MDMS Web Viewer 

October 27, 2009, New York, NY USA

Page 16: METERING INTERNATIONAL · • Network and Meter Asset Management • Remote Connect/Disconnect –Virtual Move In/Out • Outage Management • Distribution planning and engineering

AMI Overview – Outage Map 

October 27, 2009, New York, NY USA

Page 17: METERING INTERNATIONAL · • Network and Meter Asset Management • Remote Connect/Disconnect –Virtual Move In/Out • Outage Management • Distribution planning and engineering

Used during Tropical Storm FAY – August 2008 

AMI Overview – Outage Map 

October 27, 2009, New York, NY USA

Page 18: METERING INTERNATIONAL · • Network and Meter Asset Management • Remote Connect/Disconnect –Virtual Move In/Out • Outage Management • Distribution planning and engineering

Each extrapolation means an avoided AMRLAG read 

500 

1000 

1500 

2000 

2500 

3000 

3500 

4000 

4500 

Feb‐09  Mar‐09  Apr‐09  May‐09  Jun‐09  Jul‐09  Aug‐09 

Electric 

Water 

Total 

October 27, 2009, New York, NY USA 

Extrapolation for electric and water reads 

Extrapolated Reads Used for Billing

Page 19: METERING INTERNATIONAL · • Network and Meter Asset Management • Remote Connect/Disconnect –Virtual Move In/Out • Outage Management • Distribution planning and engineering

–Utilized Data • 15 Minute electric interval consumption (AMI / MV90, MDMS, Data Warehoue) • Daily electric and water consumption (MDM System) –Electric  ‐ Load characteristics –Water ‐ Usage Statistics / Seasonal Indexes 

Load and Customer Research 

October 27, 2009, New York, NY USA

Page 20: METERING INTERNATIONAL · • Network and Meter Asset Management • Remote Connect/Disconnect –Virtual Move In/Out • Outage Management • Distribution planning and engineering

Electric Meters Currently Monitored  ­ “Today” 

AMR (~2500) + MV90 (~1000)  3,500 

Intervals per Day  96 

Total readings per day  336,000 

Total readings per year  122,640,000 

Load Research ­ Tallying The Data 

October 27, 2009, New York, NY USA

Page 21: METERING INTERNATIONAL · • Network and Meter Asset Management • Remote Connect/Disconnect –Virtual Move In/Out • Outage Management • Distribution planning and engineering

•  Using AMS Data – Develop table of factors to convert daily energy use into peak demand estimates 

–  Factors developed for high, medium and low customers 

•  Data Collection & Cleaning – Collected 15 minute interval data for one year –Very High Quality AMR Data –Validation, Estimation & Edit (VEE) Process 

Transformer Load Management (TLM) Factors 

October 27, 2009, New York, NY USA

Page 22: METERING INTERNATIONAL · • Network and Meter Asset Management • Remote Connect/Disconnect –Virtual Move In/Out • Outage Management • Distribution planning and engineering

–  Aqua Lines show 15 Min Interval Data Missing from Data Warehouse 

– Multiple reasons: Data ‘Stuck’ in MDM System, network wide issue for example early Nov data missing across all accounts 

– Missing data is experienced with all rate classes 

Visualize IT Energy Print – AMR Res Customer 15 Minute Interval Data 

Current AMI­MDM Data Challenges 

October 27, 2009, New York, NY USA

Page 23: METERING INTERNATIONAL · • Network and Meter Asset Management • Remote Connect/Disconnect –Virtual Move In/Out • Outage Management • Distribution planning and engineering

AMI Electric Outputs – Load Research Interruptible Customers Hourly KW MV90 Meter Readings on 08­07­07 

Service Point 

Customer Name 1:00  3:00  5:00  7:00  9:00  11:00  13:00  15:00  16:00  18:00  23:00 

271620939  VARIOUS C/I CUSTOMERS  1,755.00  1,962.60  1,849.20  2,154.30  1,624.50  2,080.50  1,988.70  1,915.20  1,856.10  2,091.00  1,720.50 3298800400  34.56  30.72  34.56  30.72  34.56  26.88  26.88  34.56  30.72  34.56  34.56 1298800258  11,445.12  13,995.36  12,227.04  13,908.96  13,700.16  10,333.44  8,688.96  10,277.28  10,620.00  10,458.72  13,102.56 4347910179  82.62  85.26  83.34  265.80  388.44  495.72  496.80  493.38  493.80  494.94  189.18 1603910253  1,008.84  1,082.65  1,018.29  1,068.48  1,065.22  1,019.76  1,019.34  924.42  894.18  853.65  962.43 7098100530  4,672.80  4,756.32  4,728.24  4,620.96  4,634.64  4,631.04  4,735.44  4,722.48  5,049.36  4,929.12  5,172.48 7103330884  297.90  299.78  324.15  310.73  315.45  298.05  301.13  306.15  321.53  303.60  321.38 1861900152  8,146.56  8,471.04  8,443.20  8,410.56  8,174.40  8,440.32  8,198.40  8,428.80  8,291.52  8,111.04  7,985.28 2312920580  1,158.99  1,178.41  1,041.28  1,139.88  1,185.87  1,058.50  1,083.18  1,056.09  1,063.96  1,169.28  1,008.21 5060600050  1,076.16  1,097.76  1,095.84  1,133.52  1,154.16  1,143.12  1,167.72  1,349.64  1,189.68  1,215.96  1,175.28 2072810975  231.68  227.96  224.68  218.88  248.40  242.48  227.32  233.08  248.28  233.68  238.28 1057700599  268.86  242.22  226.92  344.46  388.56  417.30  450.72  439.86  470.10  455.04  450.42 6679910067  367.20  372.24  380.25  454.14  518.67  532.98  520.02  427.59  424.71  401.58  361.17 1650600276  21,898.80  22,876.00  22,565.20  22,500.80  21,271.60  10,208.80  6,358.80  14,400.40  18,068.40  17,964.80  21,683.20 4294400683  317.34  356.85  456.84  489.96  680.67  994.14  861.66  907.29  956.61  975.60  345.33 4690120687  423.79  455.90  518.18  479.23  435.31  470.74  525.31  508.32  529.99  482.40  451.37 7372920427  5,916.00  5,826.00  5,779.20  5,778.00  5,800.80  5,493.60  5,869.20  5,470.80  5,636.40  5,748.00  5,684.40 7456920914  847.39  839.49  829.95  771.33  780.22  782.34  808.26  809.54  807.39  755.01  854.27 Hourly Total Interruptible Load MW  82.52  86.38  84.13  88.67  86.34  77.25  72.19  81.28  85.07  80.12  86.09 

8610810406  VARIOUS C/I CUSTOMERS  1,746.64  1,760.64  1,753.92  1,794.80  1,816.08  1,839.04  1,885.52  1,866.48  1,859.76  1,857.52  1,841.28 5046620135  1,018.68  993.36  987.36  1,014.72  1,037.16  1,130.16  1,228.68  1,245.12  1,244.04  1,232.76  1,061.04 5080695950  1,179.30  1,148.10  1,139.20  1,160.70  1,153.20  1,301.70  1,341.70  1,402.40  1,389.40  1,427.60  1,224.40 7012500939  99.36  101.28  83.04  240.00  1,845.12  2,583.36  2,385.12  2,516.16  1,264.32  1,048.80  68.16 2467420688  255.00  265.30  260.50  268.70  285.70  313.10  336.20  334.90  339.20  330.60  279.50 272710030  400.49  394.15  386.67  435.42  554.84  585.64  521.49  524.22  501.86  464.46  377.08 1974110507  62.90  62.85  63.53  65.50  67.04  67.87  68.30  66.94  66.90  65.12  62.25 7791800792  229.56  218.88  225.12  219.24  209.52  210.60  207.96  207.12  213.36  212.04  215.64 3055800469  462.00  465.50  480.00  470.60  477.00  481.20  478.00  492.70  499.80  493.30  491.70 Hourly Total Curtailable Load MW  13.95  13.84  13.71  14.50  16.94  18.49  18.61  17.84  16.72  16.02  13.95 

Hourly Total Interrupti ble/Curta ilable Load MW  96.47  100.22  97.84  103.17  103.28  95.74  90.80  99.12  101.79  96.14  100.04 

•  ~60 Interruptible/Curtailable Customers •  Summer Peak: 07­Aug at 4:00 PM ­ 102 MW available for DSM Consideration •  Winter Peak: 30­Jan at 7:00 AM ­ 118 MW Available for DSM Consideration 

October 27, 2009, New York, NY USA

Page 24: METERING INTERNATIONAL · • Network and Meter Asset Management • Remote Connect/Disconnect –Virtual Move In/Out • Outage Management • Distribution planning and engineering

MDM Water Outputs – Load Research Customer Name  Winter  Summer  Win/Sum Index 

Usage Indicator 

VARIOUS C/I CUSTOMERS  ­­  52,421,062.91  ­­  HS/LW** 2,954,003.54  48,749,058.50  0.060596115 HS/LW 5,570,006.68  38,521,046.23  0.144596454 HS/LW 10,318,012.38  39,182,047.02  0.263335205 HS/LW 16,336,019.60  52,255,062.71  0.312620802 HS/LW 

981,376.00  2,861,100.00  0.343006536 HS/LW 15,512,018.61  35,010,042.01  0.443073408 HS/LW 13,780,016.54  29,456,035.35  0.467816404 HS/LW 18,864,560.00  39,935,720.00  0.472373104 HS/LW 7,146,008.58  14,819,017.78  0.482218773 HS/LW 58,525,016.00  115,330,138.40  0.507456393 HS/LW 11,320,013.58  21,385,025.66  0.529342997 HS/LW 39,120,046.94  70,130,084.16  0.557821189 HS/LW 25,789,030.95  44,129,052.95  0.584400281 HS/LW 27,939,033.53  45,858,055.03  0.609250294 Neutral 38,315,045.98  53,705,064.45  0.713434503 HW/LS*** 69,847,083.82  93,001,111.60  0.751034935 HW/LS 23,887,028.66  29,379,035.25  0.813063753 HW/LS 26,385,700.00  32,272,460.00  0.817591841 HW/LS 14,370,017.24  9,846,011.82  1.459475929 HW/LS 33,122,039.75  5,001,006.00  6.623075385 HW/LS 

•  Monthly Usage from MDM of Top Water Users •  Winter: Dec thru Feb and Summer: May thru Sep •  0.6 is Neutral Customer (HS/LW < 0.6, HW/LS > 0.6) 

October 27, 2009, New York, NY USA

Page 25: METERING INTERNATIONAL · • Network and Meter Asset Management • Remote Connect/Disconnect –Virtual Move In/Out • Outage Management • Distribution planning and engineering

– Customer • Household usage rates with comparable homes • Real time notification of higher than expected usage 

• Customer access through Google • Partnership with Commercial Customers for DSM implementation 

– Engineering and Operations • Water hydraulic model calibration • Water and Wastewater system optimization 

Business Enablement 

October 27, 2009, New York, NY USA

Page 26: METERING INTERNATIONAL · • Network and Meter Asset Management • Remote Connect/Disconnect –Virtual Move In/Out • Outage Management • Distribution planning and engineering

– Partner with the right vendor 

• AMR/MDMS is a new field for most utilities and so, finding internal resources with right skills/experience will be difficult 

– Develop separate system to house data and interface with other systems 

• CIS is not the right system 

Lessons Learned 

October 27, 2009, New York, NY USA

Page 27: METERING INTERNATIONAL · • Network and Meter Asset Management • Remote Connect/Disconnect –Virtual Move In/Out • Outage Management • Distribution planning and engineering

–Manage stakeholder expectation 

• Requirements will be fuzzy at best.  New requirements will be surfacing as you deliver basic functionality.  You must have a process to enhance the functionally delivered at the same time as you are adding new functionality. 

– Use Six Sigma or other quality tools during the project to run things smoothly 

Lessons Learned 

October 27, 2009, New York, NY USA

Page 28: METERING INTERNATIONAL · • Network and Meter Asset Management • Remote Connect/Disconnect –Virtual Move In/Out • Outage Management • Distribution planning and engineering

–Must have the highest level of sponsorship and buy‐in 

• Have a vision/plan to use data beyond billing 

• Identify short and long term owners 

– New method of doing business 

• Advanced Metering Systems Steering Committee  established to provide formal structure and process for planning, decision making and policy recommendations to support AMS 

Lessons Learned 

October 27, 2009, New York, NY USA

Page 29: METERING INTERNATIONAL · • Network and Meter Asset Management • Remote Connect/Disconnect –Virtual Move In/Out • Outage Management • Distribution planning and engineering

Wayne Young Director Meter Reading, Billing & Collections JEA 

21 West Church St. Jacksonville Florida, 32202 

Office: 904­665­7728 email: [email protected] 

Questions? 

October 27, 2009, New York, NY USA

Page 30: METERING INTERNATIONAL · • Network and Meter Asset Management • Remote Connect/Disconnect –Virtual Move In/Out • Outage Management • Distribution planning and engineering

AMS System Performance 

89.0 

91.0 

93.0 

95.0 

97.0 

99.0 

Monthly Billing Read % Electric 

Daily Read % Electric 

Monthly Billing Read % Water 

Daily Read % Water 

Merrill Rd Cellmaster down from May 12 to May 20 

October 27, 2009, New York, NY USA

Page 31: METERING INTERNATIONAL · • Network and Meter Asset Management • Remote Connect/Disconnect –Virtual Move In/Out • Outage Management • Distribution planning and engineering

Current AMI‐MDM Data Challenges 

Visualize IT Energy Print – AMR Commercial Customers 15 Minute Interval Data – Aug  to Feb 

–  Pulled ~300 Sample Points from ~2500 AMR Load Profile Accounts (6 Samples Shown Above) 

–  Aqua Lines show Interval Data Missing from DW. Multiple reasons: Data ‘Stuck’ in MDM System, network wide issue for example early Nov data missing across all accounts 

October 27, 2009, New York, NY USA

Page 32: METERING INTERNATIONAL · • Network and Meter Asset Management • Remote Connect/Disconnect –Virtual Move In/Out • Outage Management • Distribution planning and engineering

AMI Electric Outputs – Load Research Interruptible Customers Hourly KW MV90 Meter Readings on 01­30­07 

Service Point 

Customer Name 1:00  2:00  3:00  4:00  5:00  6:00  7:00  8:00  9:00  10:00  11:00  24:00 

271620939  VARIOUS C/I CUSTOMERS  1,995.00  2,233.80  2,220.90  1,884.90  1,951.80  2,223.90  2,135.70  2,212.20  2,111.10  2,310.30  2,114.70  2,224.50 3298800400  32,739.84  35,343.36  37,071.36  33,446.40  35,919.36  34,440.96  35,765.76  28,800.00  35,646.72  35,324.16  35,846.40  32,413.44 1298800258  10,477.44  11,592.00  11,756.16  11,116.80  11,900.16  12,067.20  11,197.44  11,937.60  11,113.92  11,378.88  11,364.48  13,524.48 1099530307  129.60  110.88  80.64  77.76  79.20  108.00  2,520.96  4,641.60  3,860.64  4,748.16  4,513.44  113.76 5720300297  6,663.83  6,862.28  6,810.30  6,678.00  6,934.73  6,745.73  6,700.05  6,591.38  6,507.90  6,733.13  6,578.78  6,358.28 7586600379  2,285.28  2,362.50  2,234.34  1,962.36  1,924.20  1,857.78  1,826.64  1,879.74  1,402.92  1,356.48  1,602.18  2,361.42 7573800553  370.80  417.15  390.69  378.27  387.54  457.74  421.65  475.47  459.72  447.66  478.80  437.13 2312920580  526.68  603.75  646.27  642.07  649.42  649.84  622.44  500.43  481.85  463.58  566.27  402.99 5060600050  1,319.40  1,145.76  1,235.88  1,050.24  1,317.48  1,113.96  1,091.28  1,182.24  1,108.68  1,114.68  1,304.28  1,128.48 2072810975  212.24  208.56  212.60  214.88  210.44  184.44  178.48  221.08  235.04  234.72  232.60  231.60 1057700599  383.16  363.66  306.48  197.34  192.42  271.44  371.64  391.74  363.96  361.50  382.92  420.66 2139196838  156.80  156.20  152.20  152.90  155.00  237.70  464.20  469.60  482.30  482.50  476.70  434.40 1650600276  13,932.80  14,512.40  13,983.20  12,930.40  11,527.60  8,724.80  7,145.60  4,698.40  3,948.00  6,739.60  6,652.80  6,092.80 2258085055  86.58  86.04  88.11  83.25  90.27  91.98  92.70  79.02  78.84  74.16  71.10  83.25 4294400683  428.83  434.11  463.78  508.13  604.70  746.88  814.66  1,079.04  1,216.61  1,031.90  961.06  371.52 4690120687  461.30  432.86  418.39  453.46  470.09  489.38  491.47  458.71  456.55  450.22  478.37  474.84 7372920427  12,420.00  11,911.20  11,542.80  11,650.80  12,121.20  11,946.00  11,157.60  10,448.40  10,532.40  10,573.20  10,480.80  12,254.40 7456920914  714.82  696.48  679.10  687.74  623.62  495.84  665.09  562.18  532.80  671.14  664.03  776.54 Hourly Total Interruptible Load MW  108.30  112.52  113.13  107.03  110.16  106.36  107.38  100.84  105.10  108.92  109.31  103.81 

8610810406  VARIOUS C/I CUSTOMERS  1,601.04  1,588.72  1,591.52  1,587.60  1,591.52  1,597.12  1,600.48  1,629.60  1,629.04  1,638.00  1,648.08  1,607.76 5046620135  957.36  952.68  959.16  957.36  949.80  955.80  966.48  965.88  944.16  955.32  959.76  945.24 8507067450  236.64  239.91  243.06  235.20  226.98  242.73  239.94  233.34  287.13  342.57  308.91  271.17 7012500939  36.48  35.04  35.52  35.52  34.56  42.72  755.52  996.96  2,561.28  2,276.64  2,119.68  36.00 2467420688  234.07  242.21  232.06  234.07  246.67  254.95  279.79  316.66  288.72  270.86  265.75  240.41 272710030  309.14  327.10  317.50  310.46  319.88  321.64  367.93  409.02  414.22  422.14  406.56  294.98 1974110507  59.63  59.84  60.29  60.97  61.10  63.01  63.94  67.14  70.21  72.04  73.53  60.76 7791800792  141.48  138.12  133.80  142.56  143.16  138.72  138.48  131.76  131.52  129.48  129.12  130.20 3055800469  429.50  424.00  439.20  438.00  434.10  444.80  442.70  434.40  445.60  451.10  441.90  432.40 Hourly Total Curtailable Load MW  10.92  10.90  10.89  10.28  9.59  9.77  10.73  11.37  13.21  13.27  13.21  9.84 

Hourly Total Interrupti ble/Curtai 

119.22  123.42  124.02  117.31  119.76  116.13  118.12  112.21  118.32  122.19  122.52  113.65 

§  ~60 Interruptible/Curtailable Customers §  Winter Peak: 30­Jan at 7:00 AM §  I/C Coincident Peak (CP) ­ 118 MW Available for DSM Consideration 