    MET SEMINAR2007

    Bon PipkinAT&T

    1

  • 8/2/2019 MET_2007A

    2/17

    2

    MET SEMINAR - 2007

    The New AT&T

    Recent Merger Activities Combined:

    SBC

    AT&T Corporation

    Bell South

    Cingular

    News Release:

  • 8/2/2019 MET_2007A

    3/17

    3

    MET SEMINAR - 2007

  • 8/2/2019 MET_2007A

    4/17

    4

    Industry LeaderWireless serviceswith 61 millionsubscribers

    Broadband or high speed InternetDSL, with more than 11.5 millionlines in service

    Businessvoice and data services

    IP-based services, one of the

    worlds leading providers

    WirelessAT&Thas nations largest digital voiceand data network

    AT&Ts new 3G networkis a super-fast,

    IP-based voice and data network

    AT&T delivers the widest internationalcoverage of any U.S.-based wirelesscarrier

    We provide more than47,500 hot spots

    Wi-Fi access points in 79 countries

    Voice TV

    Messaging

    High SpeedInternet

    Virtual Private Network (VPN)

    Voice over IP (VoIP)

    IP-based and managed services

    Web-hosting

    Network security

    Platform for the Future Global Business Portfolio

  • 8/2/2019 MET_2007A

    5/17

  • 8/2/2019 MET_2007A

    6/17

    6

    AT&T Services, Inc.

    Common Systems District Compliance:

    Sets equipment standards and evaluates newtechnologies for compliance:

    ATT-TP-76200: Physical Design (NEBS)

    ATT-TP-76450: Interconnection Requirements

    Available at https://ebiznet.sbc.com/sbcnebs/

    MET SEMINAR - 2007

    https://ebiznet.sbc.com/sbcnebs/https://ebiznet.sbc.com/sbcnebs/
  • 8/2/2019 MET_2007A

    7/177

    Bon Pipkin

    Associate Director

    John TablerionNEBS Evaluation Group SPOC John Messina - SMEBonding & Grounding/ESD/DC Power

    Larry Wong - SMEHeat Dissipation/Shock & Vibration

    Fire StoppingMahmoud Elkenaney - SME

    Electrical Safety/EMI/Lightning & PowerFault/Acoustic Noise/ICEP/

    Bon Pipkin - SMETemperature &Humidity/

    Airborne Contaminants/Altitude

    Sha Hoda - SMEFire Spread/ Space Planning

    AT&T Network Equipment Physical RequirementsATT-TP-76200 TEAM

    MET SEMINAR - 2007

  • 8/2/2019 MET_2007A

    8/178

    MET SEMINAR - 2007

    AT&T Network Equipment Interconnection RequirementsATT-TP-76450 SMEs

    Ed Granger: DC Power Dareus Starr: Synchronization

    Jeff Langley: Alarms Mike Yeilding: Fiber

    Wing Eng: Copper Doug Florence: VendorDocumentation

  • 8/2/2019 MET_2007A

    9/179

    MET SEMINAR - 2007

    Standards Document Merger Underway for:

    AT&T Local Exchange Carriers (Telcos) AT&T Internet Services, Inc. (U-Verse)

    AT&T L.D., ASI (LD, DSL)

    AT&T Corporation (Backhaul, Global, VoIP) Cingular (AT&T Wireless)

  • 8/2/2019 MET_2007A

    10/1710

    MET SEMINAR - 2007

    Standards Merger: AT&T Corp.

    NEDS Standard Now

    Delays due to regulatory issues

    Requirements will be in ATT-TP-76200 & ATT-TP-76450

    Teams meeting now

    ATT-TP-76200 Issues: DC Power Transients

    ATT-TP-7645O Issues: AC Power, Dual Power Plants

    International Standards

  • 8/2/2019 MET_2007A

    11/1711

    MET SEMINAR - 2007

    Standards Merger: Bell South

    Currently NEBS is TR-73638BT

    No Significant Differences due to TCG

    ATT-TP-76200 Standard & Process EffectiveImmediately

    ATT-TP-76450 under review

  • 8/2/2019 MET_2007A

    12/1712

    MET SEMINAR - 2007

    Standards Merger: Cingular

    No Legacy Standards Document

    Notification sent to suppliers that ATT-TP-76200and ATT-TP-76450 are now standards

    ATT-TP-76200 applicable levels and processunder review

    ATT-TP-76450 under review

  • 8/2/2019 MET_2007A

    13/17

  • 8/2/2019 MET_2007A

    14/1714

    AT&T Network Equipment PhysicalRequirements

    TP 76200 Evaluation Levels

    Level 1: Safety Requirements (Collocation, test

    heads, FOAs)

    Level 2: Safety and Modified ReliabilityRequirements

    Level 3: Safety and Full Reliability Requirements

    Ancillary

  • 8/2/2019 MET_2007A

    15/1715

    AT&T Network Equipment PhysicalRequirements

    Equipment Deployment Locations

    CO, Huts, CEVs

    Customer Premises

    Non-CO Buildings

    Mission Critical Data Rooms

    OSP Cabinets, Level 2, 3 Environments

    OSP Customer Premises

    AT&T Labs

  • 8/2/2019 MET_2007A

    16/1716

    MET SEMINAR - 2007

    Industry Issues:

    RoHS Energy Efficiency

    Equipment Size

  • 8/2/2019 MET_2007A

    17/17

    17

    AT&T Network Equipment PhysicalRequirements

    END

    Questions?