Page 1: MergedFile - POWERGRID WR LTA...26 4 7 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250 17-Jan-18 31-May-19 Bhuj PS 1200000990 27 4 8 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250
Page 2: MergedFile - POWERGRID WR LTA...26 4 7 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250 17-Jan-18 31-May-19 Bhuj PS 1200000990 27 4 8 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250
Page 3: MergedFile - POWERGRID WR LTA...26 4 7 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250 17-Jan-18 31-May-19 Bhuj PS 1200000990 27 4 8 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250
Page 4: MergedFile - POWERGRID WR LTA...26 4 7 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250 17-Jan-18 31-May-19 Bhuj PS 1200000990 27 4 8 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250
Page 5: MergedFile - POWERGRID WR LTA...26 4 7 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250 17-Jan-18 31-May-19 Bhuj PS 1200000990 27 4 8 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250
Page 6: MergedFile - POWERGRID WR LTA...26 4 7 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250 17-Jan-18 31-May-19 Bhuj PS 1200000990 27 4 8 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250

Agenda of 27th Meeting of WR constituents for Connectivity & LTA applications

Page 1 of 33

Agenda for 27th Meeting of WR Constituents regarding Connectivity

& Long-term Access applications in Western Region

----------------------------------------------------------------------------------------------------------------

1. Connectivity Applications from RE Generation Developers in Western Region.

The Detailed procedure for Grant of Connectivity to projects based on Renewable

Sources was notified by the Hon’ble CERC vide its order dated 15.05.2018 as per

which all connectivity applications based on renewable energy sources are to be

processed through a two stage connectivity process viz. Stage-I & II.

Upon receipt of the Connectivity application, necessary study for grant of

connectivity in the available margin in the nearest existing ISTS substations or in

new sub-stations under implementation/ planning stage shall be carried out and two

locations for connectivity - one Primary and other alternate location shall be

identified. Grant of Stage-I Connectivity shall not create any vested right in favour of

any grantee in any particular location. The grantee shall be allocated bay in either

primary or indicated alternate location which shall be specified at the time of grant of

Stage-II Connectivity based on the then availability of bay. The Stage-I Connectivity

grantees who fail to apply for Stage-II Connectivity within 24 months from grant of

Stage-I Connectivity shall cease to be Stage-I grantee and their Application fees

shall be forfeited. Regarding the LTA applications pending with CTU, it is to mention

that LTA shall be granted along with grant of Stage-II connectivity or after the grant

of Stage-II connectivity. Accordingly, the various LTA applications shall be processed

after receipt of Stage-II connectivity applications.

As per the procedure, all the pending applications for grant of connectivity shall be

processed for Stage-I connectivity (para 5.1 (5)) and such applicants are to submit

the required documents for Stage-I Connectivity within 1 month of issue of this

Procedure. Accordingly, the following 70 nos. of connectivity applications for

cumulative quantum of 17,930 MW from RE developers in Western Region, which

were pending with CTU prior to notification of the above order, are to be processed

for Stage-I connectivity.

Table 1

Sl. No.

Name of Applicant (Organization)

Stage-I Connecti

vity Quantum (in MW)

Date of receipt of Application

Date from which

connectivity required (as per

application)

Connectivity granted/proposed

at (Primary location)

Connectivity Application

No

1 Mytrah Energy (India) Pvt. Ltd. (MEIPL-Umravati)

200 27-Feb-17 31-Mar-23 Aurangabad 1200000662

2 2 Clean Wind Power Private Limited (CWPPLRampurwadi)

300 21-Jun-17 31-Mar-22 Aurangabad 1200000785

3 3 CHIKKODI RENEWABLE POWER PRIVATE LIMITED

300 20-Mar-18 31-Mar-21 Aurangabad 1200001100

Page 7: MergedFile - POWERGRID WR LTA...26 4 7 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250 17-Jan-18 31-May-19 Bhuj PS 1200000990 27 4 8 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250

Agenda of 27th Meeting of WR constituents for Connectivity & LTA applications

Page 2 of 33

Sl. No.

Name of Applicant (Organization)

Stage-I Connecti

vity Quantum (in MW)

Date of receipt of Application

Date from which

connectivity required (as per

application)

Connectivity granted/proposed

at (Primary location)

Connectivity Application

No

(CRPPL-Buldhana)

Total: Aurangabad 800

4 4 INOX Wind Infrastructure Services. Ltd. (IWISL-Dhakna)

300 01-Jun-17 01-Jan-20 Betul 1200000760

Total: Betul 300

5 5 Renew Power Ventures Pvt Ltd.(RPVPL-Bhuvad)

110 01-Aug-17 01-Apr-19 Bhachau 1200000826

Total: Bhachau 110

6 7 Aspan Infrastructure Ltd (AIL-Baranda)

200 15-Dec-16 31-Mar-19 Bhuj PS 1200000574

7 8 Srijan Energy Systems Pvt Ltd (SESPL-Bhuj2)

200 31-Jan-17 30-Jun-19 Bhuj PS 1200000622

8 9 Mytrah Energy (India) Pvt. Ltd. (MEIPL-Hajapar)

200 27-Feb-17 30-Apr-22 Bhuj PS 1200000653

9 10

Impeccable Power Solutions Pvt. Ltd (IPSPL-Bhuj)

200 14-Mar-17 31-Dec-18 Bhuj PS 1200000685

10 11

Mytrah Energy (India) Pvt. Ltd. (MEIPL-Vithon)

500 11-May-17 30-Apr-23 Bhuj PS 1200000725

11 12

KP Energy Limited (KPEL-Muru)

400 19-May-17 25-May-17 Bhuj PS 1200000733

12 31

KP Energy Limited (KPEL-Kera)

400 19-May-17 25-May-17 Bhuj PS 1200000734

13 32

Green Infra Wind Energy Ltd. (GIWEL-Bhuj)

250 01-Jun-17 30-Sep-18 Bhuj PS 1200000761

14 33

Green Infra Wind Energy Ltd. (GIWEL-Roha)

250 01-Jun-17 31-Dec-18 Bhuj PS 1200000762

15 34

Distinguished Consultancy Solutions Private Limited (DCSPL-Bhuj)

250 14-Jun-17 31-Dec-19 Bhuj PS 1200000769

16 35

Kintech (Gujarat) Wind Park Private Limited (KWPPL-Khavda)

300 21-Jun-17 31-Mar-19 Bhuj PS 1200000782

17 36

Clean Wind Power Private Limited (CWPPL-Deshalpar)

300 21-Jun-17 30-Sep-19 Bhuj PS 1200000780

18 37

Adani Green Energy MP Ltd. (AGEMPL-Dayapar)

300 22-Jun-17 01-Sep-19 Bhuj PS 1200000778

19 38

Orange Kendra Wind Power Private Limited (OKWPPL-Ukheda)

250 30-Jun-17 31-Mar-20 Bhuj PS 1200000805

20 39

Avikiran Solar India Private Limited (ASIPL-Nadapar)

250 05-Jul-17 31-Dec-18 Bhuj PS 1200000807

21 42

Sprng Vayu Vidyut Pvt. Ltd.(SVVPL-Baranda)

202 31-Jul-17 30-Aug-18 Bhuj PS 1200000822

22 43

Clean Wind Power Pvt. Ltd.(CWPPL-Bhavnagar)

300 27-Oct-17 31-Mar-20 Bhuj PS 1200000878

23 44

Sindhanur Renewble Energy Private Limited (SREPL- Gadhsisa)

200 24-Nov-17 31-Mar-19 Bhuj PS 1200000924

24 45

Gazon Wind Energy Private Limited

250 13-Nov-17 30-Jun-18 Bhuj PS 1200000901

Page 8: MergedFile - POWERGRID WR LTA...26 4 7 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250 17-Jan-18 31-May-19 Bhuj PS 1200000990 27 4 8 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250

Agenda of 27th Meeting of WR constituents for Connectivity & LTA applications

Page 3 of 33

Sl. No.

Name of Applicant (Organization)

Stage-I Connecti

vity Quantum (in MW)

Date of receipt of Application

Date from which

connectivity required (as per

application)

Connectivity granted/proposed

at (Primary location)

Connectivity Application

No

(GWEPL-Kutch)

25 46

Adani Green Energy MP Ltd. (AGEML-Dayapar/Ratadiya)

300 16-Feb-18 01-Oct-19 Bhuj PS 1200001038

26 47

Renew Solar Power Private Ltd. (RSPPL-Bhuj)

250 17-Jan-18 31-May-19 Bhuj PS 1200000990

27 48

Renew Solar Power Private Ltd. (RSPPL-Bhuj)

250 17-Jan-18 31-May-19 Bhuj PS 1200000984

28 49

Torrent Power Ltd.(TPL- Lakhpat Bhuj)

300 07-Mar-18 30-Jun-19 Bhuj PS 1200001054

29 50

Torrent Power Ltd.(TPL- Nakhatrana Bhuj)

400 07-Mar-18 01-Jul-19 Bhuj PS 1200001067

30 51

Torrent Power Ltd.(TPL- Junachay Bhuj)

200 07-Mar-18 30-Jun-19 Bhuj PS 1200001075

31 52

Renew Power Ventures Pvt Ltd (RPVPL-Mandvi)

300 20-Feb-18 01-Dec-19 Bhuj PS 1200001053

32 53

ALFANAR ENERGY PRIVATE LIMITED (AEPL- Kotda Madh)

300 12-Mar-18 30-Jun-19 Bhuj PS 1200001068

33 54

NIRLOOTI RENEWABLE PRIVATE LIMITED (NRPL-Jarjok)

300 20-Mar-18 31-Mar-21 Bhuj PS 1200001096

34 55

RENEW POWER VENTURES PRIVATE LIMITED (RPVPL-Nakhatrana)

300 19-Mar-18 01-Jan-20 Bhuj PS 1200001097

35 56

KILAJ SOLAR (MAHARASHTRA) PRIVATE LIMITED (KSMPL-Lakpat)

300 09-Apr-18 30-Dec-19 Bhuj PS 1200001115

36 57

Netra Wind Pvt Ltd 300 23-Apr-18 31-Jan-20 Bhuj PS 1200001128

Total: Bhuj 8702

37 58

Mytrah Energy (India)Pvt. Ltd. (MEIPLChhipon)

200 27-Feb-17 31-Mar-23 Bina-II 1200000663

Total: Bina-II 200

38 62

POWERICA Ltd. (POWERICA-Jam Khambhaliya)

250 26-May-17 01-Sep-18 Jam Khambhaliya

PS 1200000739

39 63

Airpower Windfarms Pvt. Ltd. (AWPL-Jam Khambhaliya)

250 12-Sep-17 01-Sep-18 Jam Khambhaliya

PS 1200000850

40 64

KP Energy Ltd.. (KPEL-Sidhpur)

400 16-Oct-17 15-Aug-19 Jam Khambhaliya

PS 1200000836

41 65

MATHAK WIND FARMS PRIVATE LIMITED (MWFPL-Modpar)

300 20-Mar-18 31-Mar-21 Jam Khambhaliya

PS 1200001099

Total: Jam

Khambhaliya 1200

42 99

Mytrah Energy (India) Pvt. Ltd. (MEIPL-Sehore)

200 27-Feb-17 31-Mar-22 Shujalpur-II PS 1200000664

43 66

GUDADANAL RENEWABLE

300 20-Mar-18 31-Mar-21 Shujalpur-II 1200001101

Page 9: MergedFile - POWERGRID WR LTA...26 4 7 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250 17-Jan-18 31-May-19 Bhuj PS 1200000990 27 4 8 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250

Agenda of 27th Meeting of WR constituents for Connectivity & LTA applications

Page 4 of 33

Sl. No.

Name of Applicant (Organization)

Stage-I Connecti

vity Quantum (in MW)

Date of receipt of Application

Date from which

connectivity required (as per

application)

Connectivity granted/proposed

at (Primary location)

Connectivity Application

No

PRIVATE LIMITED (GRPL-Badgaon)

Total: Shujalpur-II 500

44 67

Gamesa Renewable Pvt. Ltd. (GRPL-Kod)

218 22-Jul-16 31-Mar-17 Kolhapur 1200000445

45 68

Mytrah Energy (India) Pvt. Ltd. (MEIPL-Mudshingi)

200 27-Feb-17 31-Mar-22 Kolhapur 1200000654

Total: Kolhapur 418

46 69

Kadappa Wind Farms Pvt. Ltd.(KWFPL-Mathak)

100 19-Dec-16 31-Mar-17 Lakadia PS 1200000594

47 75

Tirupur Renewable Energy Pvt. Ltd. (TREPL-Gagodhar)

150 14-Feb-17 31-Mar-18 Lakadia PS 1200000627

48 76

Jalore Wind Park Pvt. Ltd. (JWPPL-Gagodhar)

150 14-Feb-17 31-Mar-18 Lakadia PS 1200000626

49 77

Mytrah Energy (India) Pvt. Ltd. (MEIPL-Ambapar)

200 27-Feb-17 31-Mar-23 Lakadia PS 1200000659

50 78

Fascinating Power Solutions Private Limited (FPSPL-Bhimasar)

200 30-Mar-17 30-Jun-18 Lakadia PS 1200000698

51 81

Renew Power Ventures Pvt. Ltd. (RPVPL-Lakadiya)

500 17-Apr-17 01-Apr-20 Lakadia PS 1200000620

52 82

Green Infra Wind Energy Ltd. (GIWEL-Lakadiya)

250 02-Jun-17 30-Sep-18 Lakadia PS 1200000763

53 83

Kintech (Gujarat) Wind Park Private Limited (KWPPL-Vondh)

300 21-Jun-17 31-Mar-19 Lakadia PS 1200000771

54 85

Clean Wind Power Private Limited (CWPPL-Sukhpar)

300 21-Jun-17 31-Mar-20 Lakadia PS 1200000784

55 86

Sri Maruti Wind Park (Mendigiri) Private Limited (SMWPPL-Lakhagadh)

400 21-Jun-17 20-Jun-17 Lakadia PS 1200000718

56 87

Gala Energy Private Limited (GEPL-Morbi)

250 14-Jun-17 31-Dec-19 Lakadia PS 1200000768

Total: Lakadia 2800

57 88

Green Infra Wind Energy Ltd. (GIWEL-Osmanabad)

500 04-Jan-17 31-Mar-18 Parli 1200000563

58 89

Gagodar Renewable Energy Pvt. Ltd. (GREPL-Deosingha)

200 14-Feb-17 30-Sep-18 Parli 1200000630

59 91

Osmanabad Renewable Pvt. Ltd. (ORPL-Vaidyakinhi)

200 20-Feb-17 30-Sep-18 Parli 1200000636

60 92

Ghatpimpri Renewable Pvt. Ltd. (GRPL-Ghatpimpri)

200 20-Feb-17 30-Sep-18 Parli 1200000638

61 94

Nellore Renewable Pvt. Ltd. (NRPL-Chinchoti)

100 02-Mar-17 30-Sep-18 Parli 1200000667

62 95

Bhuj Renewable Pvt. Ltd. (BRPL-Sarfarajpur)

150 07-Mar-17 30-Sep-18 Parli 1200000670

63 96

Bapuram Renewable Pvt. Ltd. (BRPL-

150 30-May-17 31-Mar-19 Parli 1200000753

Page 10: MergedFile - POWERGRID WR LTA...26 4 7 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250 17-Jan-18 31-May-19 Bhuj PS 1200000990 27 4 8 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250

Agenda of 27th Meeting of WR constituents for Connectivity & LTA applications

Page 5 of 33

Sl. No.

Name of Applicant (Organization)

Stage-I Connecti

vity Quantum (in MW)

Date of receipt of Application

Date from which

connectivity required (as per

application)

Connectivity granted/proposed

at (Primary location)

Connectivity Application

No

Nekhnoor)

Total: Parli 1500

64 97

Green Infra Wind Energy Ltd. (GIWEL-Rajgarh)

250 07-Dec-16 31-Mar-18 Rajgarh 1200000560

65 98

Sankanur Renewable Energy Pvt. Ltd. (SREPL-Kod)

200 14-Feb-17 30-Sep-18 Rajgarh 1200000631

Total: Rajgarh 450

66 100

Aspan Infrastructure Ltd (AIL-Nagral)

200 15-Dec-16 31-Mar-18 Tuljapur PS 1200000568

67 101

Suvidha Renewable Energy Pvt. Ltd. (SREPL-Morda)

250 27-Jan-17 30-Mar-18 Tuljapur PS 1200000611

68 102

Mytrah Energy (India) Private Ltd. (MEIPL-Dahitanewadi)

200 10-Jan-17 31-Mar-20 Tuljapur PS 1200000614

69 103

Gadag Renewable Pvt. Ltd. (GRPL-Lohara)

200 20-Feb-17 30-Sep-18 Tuljapur PS 1200000634

Total: Tuljapur 850

70 104

Azure Power India Private Limited (APIPL-Amreshwar)

100 08-Sep-17 10-Oct-17 Vadodara-II 1200000831

Total: Vadodara-II 100

17930

In addition to the above applications, some requests for connectivity capacity

enhancement from RE developers near Bhuj/Bhachau area have also been received

as tabulated below:

Sl. No.

Name of Applicant (Organization)

Stage-I Connecti

vity Quantum (in MW)

Enhancement in Connectivity sought (in MW)

Enhancement in

Connectivity sought vide letter dated

Connectivity granted/propos

ed at (Primary location)

Original Connectivity Application

No.

Enhancement sought in new applied connectivity

1 Srijan Energy Systems Pvt Ltd (SESPL-Bhuj2)

200 100

(Cum. 300MW) 17.05.2017 Bhuj

1200000622 (Applied)

2 3 Aspan Infrastructure Ltd (AIL-Baranda)

200 50

(Cum. 250MW) 16.11.2017 Bhuj

1200000574 (Applied)

3 4 Green Infra Wind Energy Ltd. (GIWEL-Roha)

250 50

(Cum. 300MW) 26.03.2018 Bhuj

1200000762 (Applied)

4 Renew Power Ventures Pvt Ltd. (RPVPL-Bhuvad2)

110 90

(Cum. 200MW) 03.04.2018 Bhachau

1200000826 (Applied)

Enhancement sought in already granted connectivity

5 2 Orange Rajkot Wind Power Pvt. Ltd. (ORWPPL-Hajapar)

100 100

(Cum. 200MW) 09.05.2017 Bhuj

1200000432 (Granted)

390

(Bhuj: 300 & Bhachau: 90)

Page 11: MergedFile - POWERGRID WR LTA...26 4 7 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250 17-Jan-18 31-May-19 Bhuj PS 1200000990 27 4 8 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250

Agenda of 27th Meeting of WR constituents for Connectivity & LTA applications

Page 6 of 33

The following may be noted with respect to grant of connectivity to the ISTS Grid:

1 CERC in its order dated 05.01.2016 in Petition No: 420/MP/2014 has directed

that wind developers should comply to the provision of LVRT (Low Voltage Ride

Through). Further, the wind developers shall provide adequate reactive

compensation so that under all dispatch scenarios Power Factor of 0.98 shall be

maintained.

2 As per the Clause (6) of Regulation 8 of Connectivity Regulations, the Grant of

Connectivity shall not entitle an applicant to inter-change any power with the grid

unless it obtains LTA, MTOA or STOA. Further, since MTOA & STOA are granted

on the margins available in the grid and transfer of power on long term basis is

granted only with the LTA, therefore, the applicants are advised to apply for the

LTA to ensure power evacuation & transfer to its beneficiaries under LTA.

3 As per the Manual on Transmission Planning Criteria, the ‘N-1’ criteria may not

be applied to the immediate connectivity of wind / solar farms with the ISTS /

Intra-STS grid i.e. the line connecting the farm to the grid and the step-up

transformers at the grid station.

4 For optimisation of ROW, it is proposed that transmission towers of various

dedicated lines, up to 2 KM periphery from the entry of the pooling station may be

of multi-circuit type. The generation developers associated with the various

pooling stations may coordinate amongst themselves for implementation of the

dedicated connectivity lines with M/C towers.

5 The new substation/location for grant of Stage-I connectivity, if needed, shall be

planned in consultation with CEA, MNRE and other stakeholders. Further, the

proposed alternative locations for connectivity are yet to be discussed and shall

be firmed up, if needed, in consultation with CEA and other stakeholders.

6 In terms of para 7.7 of Detailed Procedure for “Grant of Connectivity to projects

based on Renewable Sources”, unless otherwise specified at the time of grant of

Stage-I Connectivity, the minimum power carrying capacity of the Dedicated

Transmission Line (per circuit) shall be 300MW at 220kV level and 900MW at

400kV level.

2.1 Connectivity Application received in the vicinity of Bhachau :

M/s Renew Power Ventures Pvt Ltd. have already been granted connectivity at

Bhachau S/s for their 400MW wind power project near Bhachau (Application no.

1200000326) through 220kV D/c line along-with associated bays at both ends.

Subsequently, M/s RPVPL have made an application (Application no. 1200000826)

for their proposed 110MW wind farm in the vicinity of Bhachau (RPVPL-Bhuvad2).

Further, M/s RPVPL vide letter dated 03.04.2018 have requested for enhancement

Page 12: MergedFile - POWERGRID WR LTA...26 4 7 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250 17-Jan-18 31-May-19 Bhuj PS 1200000990 27 4 8 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250

Agenda of 27th Meeting of WR constituents for Connectivity & LTA applications

Page 7 of 33

in connectivity quantum requested vide their new application no. 1200000826 from

110MW to 200MW so that the total wind generation from both their wind farms

(RPVPL-Bhuvad & RPVPL-Bhuvad-2) i.e. 600MW may be evacuated from the

220kV D/c line they are already constructing for their 400MW wind farm at Bhuvad.

Summary of the same is given below:

Connectivity Granted

Additional Connectivity applied

Cumulative Capacity

Renew Power

Ventures Pvt

Ltd.

400MW (Application no. 1200000326)

110MW + 90MW (Application no. 1200000826 +

letter dated 03.04.2018)

600MW

Accordingly, the new application of 200MW (110 + 90MW) may be considered as

enhancement of connectivity already granted to M/s RPVPL for its 400MW wind

project at Bhuvad. Further, since the dedicated transmission system of M/s RPVPL-

Bhuvad(400MW) [i.e. RPVPL switchyard - Bhachau 220kV D/c Connectivity line] has

adequate capacity to cater to evacuation of 600MW power, it is proposed to enhance

connectivity quantum of M/s RPVPL-Bhuvad wind farm from the existing 400MW to

600MW. Since, RPVPL-Bhuvad(400MW) is already a deemed stage-II grantee, M/s

RPVPL is advised to apply for enhancement in Stage-II connectivity from 400MW to

600MW as per FORMAT –RCON-E.

Members may deliberate.

2.2 Connectivity Applications received in the vicinity of Lakadia P.S. :

Total eleven nos. of new connectivity applications have been received in the vicinity

of Lakadia P.S for a quantum of 2800MW. Summary of the same is given below:

No. of applicants

Quantum in MW No. of bays reqd.

220kV 400kV 220kV 400kV

New Connectivity Received

11 2800 0 13 0

Total 11 2800 0 13 0

Common Transmission System for Connectivity of renewable generations in

Bhachau area was agreed in the 24th WR Conn/LTA meeting held on 21.12.2016.

The same could not be taken up as the RE applications were subsequently closed

due to non-signing of TA & TSA. However, the same system shall be required for

providing connectivity to the eleven nos. of new connectivity applications (above) in

the vicinity of Lakadia P.S. Accordingly, the following common transmission system

is proposed for connectivity of the eleven nos. RE applicants:

Page 13: MergedFile - POWERGRID WR LTA...26 4 7 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250 17-Jan-18 31-May-19 Bhuj PS 1200000990 27 4 8 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250

Agenda of 27th Meeting of WR constituents for Connectivity & LTA applications

Page 8 of 33

Common Transmission System for Connectivity of renewable generations in

Bhachau area :

LILO of both circuits of EPGL – Bhachau 400kV D/c (Triple) line at Lakadia

PS (GIS)

Establishment of 2x500MVA, 400/220kV Lakadia PS (GIS)

1x125MVAR, 420kV Bus Reactor at Lakadia PS (GIS)

Further, for providing alternate connectivity for the above connectivity applicants,

2x500MVA, 400/220kV Lakadia-II PS (GIS) is proposed. Accordingly, the following

dedicated connectivity system is proposed for the RE applicants proposed to be

pooled at Lakadia PS (primary location) / Lakadia-II PS (alternate location):

Table: 2

Sl.

No.

Name of Applicant Connecti

vity

Quantum

(MW)

Proposed Stage-I Connectivity System – (To be implemented by the generation developer)

Primary location Alternate location

1

Kadappa Wind Farms Pvt. Ltd.(KWFPL-Mathak)

100

Kadappa Wind Farms Pvt. Ltd.(KWFPL-Mathak) - Lakadia PS(GIS) 220kV S/c line along-with associated bays at generation end

Kadappa Wind Farms Pvt. Ltd.(KWFPL-Mathak) - Lakadia-II PS(GIS) 220kV S/c line along-with associated bays at generation end

2 Tirupur Renewable Energy Pvt. Ltd. (TREPL-Gagodhar)

150

Tirupur Renewable Energy Pvt. Ltd. (TREPL-Gagodhar) - Lakadia PS(GIS) 220kV S/c line along-with associated bays at generation end

Tirupur Renewable Energy Pvt. Ltd. (TREPL-Gagodhar) - Lakadia-II PS(GIS) 220kV S/c line along-with associated bays at generation end

3 Jalore Wind Park Pvt. Ltd. (JWPPL-Gagodhar)

150

Jalore Wind Park Pvt. Ltd. (JWPPL-Gagodhar) - Lakadia PS(GIS) 220kV S/c line along-with associated bays at generation end

Jalore Wind Park Pvt. Ltd. (JWPPL-Gagodhar) - Lakadia-II PS(GIS) 220kV S/c line along-with associated bays at generation end

4 Mytrah Energy (India) Pvt. Ltd. (MEIPL-Ambapar)

200

Mytrah Energy (India) Pvt. Ltd. (MEIPL-Ambapar) - Lakadia PS(GIS) 220kV S/c line along-with associated bays at generation end

Mytrah Energy (India) Pvt. Ltd. (MEIPL-Ambapar) - Lakadia-II PS(GIS) 220kV S/c line along-with associated bays at generation end

5

Fascinating Power Solutions Private Limited (FPSPL-Bhimasar)

200

Fascinating Power Solutions Private Limited (FPSPL-Bhimasar) - Lakadia PS(GIS) 220kV S/c line along-with associated bays at generation end

Fascinating Power Solutions Private Limited (FPSPL-Bhimasar) - Lakadia-II PS(GIS) 220kV S/c line along-with associated bays at generation end

6 Renew Power Ventures Pvt. Ltd. (RPVPL-Lakadiya)

500

Renew Power Ventures Pvt. Ltd. (RPVPL-Lakadiya) - Lakadia PS(GIS) 220kV D/c line along-with associated bays at generation end

Renew Power Ventures Pvt. Ltd. (RPVPL-Lakadiya) - Lakadia-II PS(GIS) 220kV D/c line along-with associated bays at generation end

7 Green Infra Wind Energy Ltd. (GIWEL-Lakadiya)

250

Green Infra Wind Energy Ltd. (GIWEL-Lakadiya) - Lakadia PS(GIS) 220kV S/c line along-with associated bays at generation end

Green Infra Wind Energy Ltd. (GIWEL-Lakadiya) - Lakadia-II PS(GIS) 220kV S/c line along-with associated bays at generation end

Page 14: MergedFile - POWERGRID WR LTA...26 4 7 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250 17-Jan-18 31-May-19 Bhuj PS 1200000990 27 4 8 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250

Agenda of 27th Meeting of WR constituents for Connectivity & LTA applications

Page 9 of 33

Sl.

No.

Name of Applicant Connecti

vity

Quantum

(MW)

Proposed Stage-I Connectivity System – (To be implemented by the generation developer)

Primary location Alternate location

8

Kintech (Gujarat) Wind Park Private Limited (KWPPL-Vondh)

300

Kintech (Gujarat) Wind Park Private Limited (KWPPL-Vondh) - Lakadia PS(GIS) 220kV S/c line along-with associated bays at generation end

Kintech (Gujarat) Wind Park Private Limited (KWPPL-Vondh) - Lakadia-II PS(GIS) 220kV S/c line along-with associated bays at generation end

9

Clean Wind Power

Private Limited

(CWPPL-Sukhpar) 300

Clean Wind Power Private Limited (CWPPL-Sukhpar) - Lakadia PS(GIS) 220kV S/c line along-with associated bays at generation end

Clean Wind Power Private Limited (CWPPL-Sukhpar) - Lakadia-II PS(GIS) 220kV S/c line along-with associated bays at generation end

10

Sri Maruti Wind

Park (Mendigiri)

Private Limited

(SMWPPL-

Lakhagadh)

400

Sri Maruti Wind Park (Mendigiri) Private Limited (SMWPPL-Lakhagadh) - Lakadia PS(GIS) 220kV D/c line along-with associated bays at generation end

Sri Maruti Wind Park (Mendigiri) Private Limited (SMWPPL-Lakhagadh) - Lakadia-II PS(GIS) 220kV D/c line along-with associated bays at generation end

11

Gala Energy

Private Limited

(GEPL-Morbi) 250

Gala Energy Private Limited (GEPL-Morbi) - Lakadia PS(GIS) 220kV S/c line along-with associated bays at generation end

Gala Energy Private Limited (GEPL-Morbi) - Lakadia-II PS(GIS) 220kV S/c line along-with associated bays at generation end

Total 2800

Page 15: MergedFile - POWERGRID WR LTA...26 4 7 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250 17-Jan-18 31-May-19 Bhuj PS 1200000990 27 4 8 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250

Agenda of 27th Meeting of WR constituents for Connectivity & LTA applications

Page 10 of 33

Connectivity Applicants in the vicinity of Bhuj PS and Lakadia PS

Members may deliberate.

2.3 Connectivity Applications received in the vicinity of Bhuj :

2.3.1 Details of Connectivity already granted at Bhuj PS

Earlier, eleven nos of applicants have been granted connectivity at Bhuj P.S. for a

total quantum of 4950MW. Details of the applications are given below:

Table 3

Sl. No.

Name of Applicant (Organization)

Connectivity Quantum (in MW)

Transmission System for connectivity Application

No.

1 Srijan Energy Systems Pvt Ltd (SESPL-Bhuj)

300 Srijan Energy Systems Pvt Ltd (SESPL-

Bhuj) - Bhuj PS 220kV D/c line along-with associated bays at both ends

1200000312

2 Inox Wind Infrastructure Services Ltd. (IWISL-Dayapar)

500

Inox Wind Infrastructure Services Ltd. (IWISL-Dayapar) - Bhuj PS 220kV D/c line (high capacity conductor enabling at least 500MW power transfer at nominal voltage) along-with associated bays at both ends

1200000390

3 Adani Green Energy Ltd. (AGEL-Khavda)

500 Adani Green Energy Ltd. (AGEL-

Khavda) - Bhuj PS 400kV S/c line along-with associated bays at both ends

1200000378

4 Suzlon Power 250 Suzlon Power Infrastructure Ltd. (SPIL- 1200000395

Page 16: MergedFile - POWERGRID WR LTA...26 4 7 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250 17-Jan-18 31-May-19 Bhuj PS 1200000990 27 4 8 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250

Agenda of 27th Meeting of WR constituents for Connectivity & LTA applications

Page 11 of 33

Sl. No.

Name of Applicant (Organization)

Connectivity Quantum (in MW)

Transmission System for connectivity Application

No.

Infrastructure Ltd. (SPIL-Baranda)

Baranda) - Bhuj PS 220kV S/c line (single ACSR Moose equivalent conductor) along-with associated bays at both ends

5 Suzlon Power Infrastructure Ltd. (SPIL-Fulra)

250

Suzlon Power Infrastructure Ltd. (SPIL-Fulra) - Bhuj PS 220kV S/c line (single ACSR Moose equivalent conductor) along-with associated bays at both ends

1200000394

6 Orange Rajkot Wind Power Pvt. Ltd. (ORWPPL-Hajapar)

100

Orange Rajkot Wind Power Pvt. Ltd. (ORWPPL-Hajapar) - Bhuj PS 220kV S/c line along-with associated bays at both ends

1200000432

7 Inox Wind Infrastructure Services Ltd. (IWISL-Kotda)

500

Inox Wind Infrastructure Services Ltd. (IWISL-Kotda) - Bhuj PS 220kV D/c line (high capacity conductor enabling at least 500MW power transfer at nominal voltage) along-with associated bays at both ends

1200000458

8 Ostro Kutch Wind Pvt. Ltd. (OKWPL-Bhuj)

300

Ostro Kutch Wind Pvt. Ltd. (OKWPL-Bhuj) - Bhuj PS 220kV S/c line (twin ACSR Zebra equivalent conductor) along-with associated bays at both ends

1200000493

9 Adani Green Energy Ltd. (AGEL-Khavda)

1000 Adani Green Energy Ltd. (AGEL-

Khavda) - Bhuj PS 400kV D/c line along-with associated bays at both ends

1200000514

10 Adani Green Energy Ltd. (AGEL-Khavda)

750 Adani Green Energy Ltd. (AGEL-

Khavda) - Bhuj PS 400kV S/c line along-with associated bays at both ends

1200000516

11 Wind World (India) Ltd. Mumbai (WWIL-Bhuj)

500

Wind World (India) Ltd. Mumbai (WWIL-Bhuj) - Bhuj PS 220kV D/c line (twin ACSR Moose equivalent conductor) along-with associated bays at both ends

1200000553

Apart from applicants at Sl. 1 and 2 above, the other applicants have not signed the

bay implementation agreement or paid the bay advance and hence are Deemed

stage-I connectivity grantees. Hence, as per the new detailed procedure, terminal

bays at the ISTS sub-station for the above applicants (from Sl. 3 to 11) shall be

under the scope of POWERGRID subject to compliance of relevant provision of tariff

policy. Further, the applicants at Sl. 1 and 2 are deemed stage-II connectivity

grantees as they have already signed the bay implementation agreement and have

paid the initial advance as per the agreement.

2.3.2 Details of New Connectivity applications received at Bhuj PS

Thirty one (31) nos. of new connectivity applications have been received at Bhuj PS

as per the details given in table 1 for a total quantum of 8702MW along-with four (4)

nos. capacity enhancement requests. Summary of the same is given below:

No. of applicants

Quantum in MW No. of bays reqd.

220kV 400kV 220kV 400kV

Connectivity 11 2700 2250 12 4

Page 17: MergedFile - POWERGRID WR LTA...26 4 7 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250 17-Jan-18 31-May-19 Bhuj PS 1200000990 27 4 8 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250

Agenda of 27th Meeting of WR constituents for Connectivity & LTA applications

Page 12 of 33

Granted 1 Capacity Enhancement

request 100 0 0 0

New Connectivity Received

31 8702

0 34 0 3 Capacity

Enhancement requests

200

Total 42 11702 2250 46 4

2.3.3 Connectivity capacity enhancement requests

Connectivity enhancement requests have been received from following applicants:

Enhancement request of SESPL (Bhuj) wind farm

M/s Srijan Energy Systems Pvt Ltd (SESPL) vide letter dated 17.05.2017 has

requested to consider their new connectivity application (No. 1200000622) for

300MW instead of 200MW. SESPL (Bhuj-200MW) vide letter dated 24.03.2017 has

requested for providing connectivity at existing Bhuj PS through dedicated

connectivity line (SESPL(Bhuj) – Bhuj PS 220kV D/c line) they are already

constructing for their 300MW wind farm.

The details of the above request of M/s SESPL are tabulated below:

Connectivity Granted

Additional Connectivity applied

Cumulative Capacity

Srijan Energy Systems Pvt Ltd

300MW (Application No.

1200000312)

200MW + 100MW (Application No. 1200000622

+ letter dated 24.03.2017)

600MW

Accordingly, the new application of 200 MW + 100MW enhancement may be

considered as an addition to the connectivity already granted to M/s SESPL for its

300MW wind project at Bhuj. Further, since the dedicated transmission system of

M/s SESPL-Bhuj(300MW) [i.e. SESPL switchyard – Bhuj PS 220kV D/c line] has

adequate capacity to cater to evacuation of 600MW power, it is proposed to enhance

connectivity quantum of M/s SESPL-Bhuj wind farm from the existing 300MW to

600MW. Since, SESPL-Bhuj (300MW) is already a deemed stage-II grantee, M/s

SESPL is advised to apply for enhancement in Stage-II connectivity from 300MW to

600MW as per FORMAT –RCON-E.

Enhancement request of ORWPPL (Hajapar) wind farm

M/s Orange Rajkot Wind Power Pvt. Ltd. (ORWPPL) vide letter dated 09.05.2017

have informed that they would like to revise/enhance the site capacity to 200MW

Page 18: MergedFile - POWERGRID WR LTA...26 4 7 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250 17-Jan-18 31-May-19 Bhuj PS 1200000990 27 4 8 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250

Agenda of 27th Meeting of WR constituents for Connectivity & LTA applications

Page 13 of 33

from the earlier 100MW for which connectivity has already been granted to M/s

ORWPPL vide intimation dated 31.03.2017 against their application no.

1200000432.

Since any change in cumulative connectivity quantum upto 100 MW to be

interchanged with the ISTS is allowed by the prevailing CERC regulations and the

connectivity line [Orange Rajkot Wind Power Pvt. Ltd. (ORWPPL-Hajapar) - Bhuj PS

220kV S/c line] has adequate capacity to cater to the proposed connectivity

quantum (200MW), it is proposed to enhance the connectivity quantum of M/s

ORWPPL(Bhuj2) wind farm from 100 MW to 200 MW.

Other capacity enhancement requests

M/s Aspan Infrastructure Ltd (AIL-Baranda) have requested to enhance

connectivity capacity from 200MW (applied vide application no. 1200000574)

to 250MW vide letter dated 16.11.17. Further, M/s AIL have informed that

there was a typo error in the name of the company while filing the online

application and has requested to correct the applicant name to to “Aspen

Infrastructure Ltd”.

M/s Green Infra Wind Energy Ltd. (GIWEL-Roha) vide letter dated 26.03.2018

have informed that they have been awarded 300MW under SECI Tranche-III

and accordingly requested to enhance the connectivity quantum (applied vide

application no. 1200000762) from 250MW to 300MW.

Since any change in cumulative connectivity quantum upto 100 MW to be

interchanged with the ISTS is allowed by the prevailing CERC regulations and the

connectivity line proposed for the above applicants in the following table (No. 4) has

adequate capacity to cater to the above enhancement in connectivity, the above

capacity enhancement requests are proposed to be accepted.

2.3.4 Transmission System for Stage-I Connectivity

The primary connectivity point for the new connectivity applicants in the vicinity of

Bhuj area shall be 765/400/220kV Bhuj PS. Further, for providing alternate

connectivity for the above connectivity applicants, 2x500MVA, 400/220kV Bhuj-II PS

(GIS) is proposed. Accordingly, the following dedicated connectivity system is

proposed for the RE applicants proposed to be pooled at Bhuj PS (primary location) /

Bhuj-II PS (alternate location):

Page 19: MergedFile - POWERGRID WR LTA...26 4 7 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250 17-Jan-18 31-May-19 Bhuj PS 1200000990 27 4 8 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250

Agenda of 27th Meeting of WR constituents for Connectivity & LTA applications

Page 14 of 33

Table 4 Sl.

No.

Name of

Applicant

Connectivity

Quantum

(MW)

Proposed Stage-I Connectivity System – (To be implemented by the generation developer)

Primary location Alternate location

1 Aspan Infrastructure Ltd (AIL-Baranda)

200 (+50 capacity enhancement

request)

Aspan Infrastructure Ltd (AIL-Baranda) - Bhuj PS 220kV S/c line along-with associated bays at generation end

Aspan Infrastructure Ltd (AIL-Baranda) - Bhuj-II PS(GIS) 220kV S/c line along-with associated bays at generation end

2 Srijan Energy Systems Pvt Ltd (SESPL-Bhuj2)

200 (+100 capacity enhancement

request)

As proposed under 2.3.3 above

3 Mytrah Energy (India) Pvt. Ltd. (MEIPL-Hajapar)

200

Mytrah Energy (India) Pvt. Ltd. (MEIPL-Hajapar) - Bhuj PS 220kV S/c line along-with associated bays at generation end

Mytrah Energy (India) Pvt. Ltd. (MEIPL-Hajapar) - Bhuj-II PS(GIS) 220kV S/c line along-with associated bays at generation end

4 Impeccable Power Solutions Pvt. Ltd (IPSPL-Bhuj)

200

Impeccable Power Solutions Pvt. Ltd (IPSPL-Bhuj) - Bhuj PS 220kV S/c line along-with associated bays at generation end

Impeccable Power Solutions Pvt. Ltd (IPSPL-Bhuj) - Bhuj-II PS(GIS) 220kV S/c line along-with associated bays at generation end

5 Mytrah Energy (India) Pvt. Ltd. (MEIPL-Vithon)

500

Mytrah Energy (India) Pvt. Ltd. (MEIPL-Vithon) - Bhuj PS 220kV D/c line along-with associated bays at generation end

Mytrah Energy (India) Pvt. Ltd. (MEIPL-Vithon) - Bhuj-II PS(GIS) 220kV D/c line along-with associated bays at generation end

6 KP Energy Limited (KPEL-Muru)

400

KP Energy Limited (KPEL-Muru) - Bhuj PS 220kV D/c line along-with associated bays at generation end

KP Energy Limited (KPEL-Muru) - Bhuj-II PS(GIS) 220kV D/c line along-with associated bays at generation end

7 KP Energy Limited (KPEL-Kera)

400

KP Energy Limited (KPEL-Kera) - Bhuj PS 220kV D/c line along-with associated bays at generation end

KP Energy Limited (KPEL-Kera) - Bhuj-II PS(GIS) 220kV D/c line along-with associated bays at generation end

8 Green Infra Wind Energy Ltd. (GIWEL-Bhuj)

250

Green Infra Wind Energy Ltd. (GIWEL-Bhuj) - Bhuj PS 220kV S/c line along-with associated bays at generation end

Green Infra Wind Energy Ltd. (GIWEL-Bhuj) - Bhuj-II PS(GIS) 220kV S/c line along-with associated bays at generation end

9 Green Infra Wind Energy Ltd. (GIWEL-Roha)

250 (+50 capacity enhancement

request)

Green Infra Wind Energy Ltd. (GIWEL-Roha) - Bhuj PS 220kV S/c line along-with associated bays at generation end

Green Infra Wind Energy Ltd. (GIWEL-Roha) - Bhuj-II PS(GIS) 220kV S/c line along-with associated bays at generation end

10

Distinguished Consultancy Solutions Private Limited (DCSPL-Bhuj)

250

Distinguished Consultancy Solutions Private Limited (DCSPL-Bhuj) - Bhuj PS 220kV S/c line along-with associated bays at generation end

Distinguished Consultancy Solutions Private Limited (DCSPL-Bhuj) - Bhuj-II PS(GIS) 220kV S/c line along-with associated bays at generation end

11

Kintech (Gujarat) Wind Park Private Limited (KWPPL-Khavda)

300

Kintech (Gujarat) Wind Park Private Limited (KWPPL-Khavda) - Bhuj PS 220kV S/c line along-with

Kintech (Gujarat) Wind Park Private Limited (KWPPL-Khavda) - Bhuj-II PS(GIS) 220kV S/c line along-with

Page 20: MergedFile - POWERGRID WR LTA...26 4 7 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250 17-Jan-18 31-May-19 Bhuj PS 1200000990 27 4 8 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250

Agenda of 27th Meeting of WR constituents for Connectivity & LTA applications

Page 15 of 33

Sl.

No.

Name of

Applicant

Connectivity

Quantum

(MW)

Proposed Stage-I Connectivity System – (To be implemented by the generation developer)

Primary location Alternate location

associated bays at generation end

associated bays at generation end

12

Clean Wind Power Private Limited (CWPPL-Deshalpar)

300

Clean Wind Power Private Limited (CWPPL-Deshalpar) - Bhuj PS 220kV S/c line along-with associated bays at generation end

Clean Wind Power Private Limited (CWPPL-Deshalpar) - Bhuj-II PS(GIS) 220kV S/c line along-with associated bays at generation end

13

Adani Green Energy MP Ltd. (AGEMPL-Dayapar)

300

Adani Green Energy MP Ltd. (AGEMPL-Dayapar) - Bhuj PS 220kV S/c line along-with associated bays at generation end

Adani Green Energy MP Ltd. (AGEMPL-Dayapar) - Bhuj-II PS(GIS) 220kV S/c line along-with associated bays at generation end

14

Orange Kendra Wind Power Private Limited (OKWPPL-Ukheda)

250

Orange Kendra Wind Power Private Limited (OKWPPL-Ukheda) - Bhuj PS 220kV S/c line along-with associated bays at generation end

Orange Kendra Wind Power Private Limited (OKWPPL-Ukheda) - Bhuj-II PS(GIS) 220kV S/c line along-with associated bays at generation end

15

Avikiran Solar India Private Limited (ASIPL-Nadapar)

250

Avikiran Solar India Private Limited (ASIPL-Nadapar) - Bhuj PS 220kV S/c line along-with associated bays at generation end

Avikiran Solar India Private Limited (ASIPL-Nadapar) - Bhuj-II PS(GIS) 220kV S/c line along-with associated bays at generation end

16 Sprng Vayu Vidyut Pvt. Ltd.(SVVPL-Baranda)

202

Sprng Vayu Vidyut Pvt. Ltd.(SVVPL-Baranda) - Bhuj PS 220kV S/c line along-with associated bays at generation end

Sprng Vayu Vidyut Pvt. Ltd.(SVVPL-Baranda) - Bhuj-II PS(GIS) 220kV S/c line along-with associated bays at generation end

17 Clean Wind Power Pvt. Ltd.(CWPPL-Bhavnagar)

300

Clean Wind Power Pvt. Ltd.(CWPPL-Bhavnagar) - Bhuj PS 220kV S/c line along-with associated bays at generation end

Clean Wind Power Pvt. Ltd.(CWPPL-Bhavnagar) - Bhuj-II PS(GIS) 220kV S/c line along-with associated bays at generation end

18

Sindhanur Renewble Energy Private Limited (SREPL- Gadhsisa)

200

Sindhanur Renewble Energy Private Limited (SREPL- Gadhsisa) - Bhuj PS 220kV S/c line along-with associated bays at generation end

Sindhanur Renewble Energy Private Limited (SREPL- Gadhsisa) - Bhuj-II PS(GIS) 220kV S/c line along-with associated bays at generation end

19

Gazon Wind Energy Private Limited (GWEPL-Kutch)

250

Gazon Wind Energy Private Limited (GWEPL-Kutch) - Bhuj PS 220kV S/c line along-with associated bays at generation end

Gazon Wind Energy Private Limited (GWEPL-Kutch) - Bhuj-II PS(GIS) 220kV S/c line along-with associated bays at generation end

20

Adani Green Energy MP Ltd. (AGEML-Dayapar/Ratadiya)

300

Adani Green Energy MP Ltd. (AGEML-Dayapar/Ratadiya) - Bhuj PS 220kV S/c line along-with associated bays at generation end

Adani Green Energy MP Ltd. (AGEML-Dayapar/Ratadiya) - Bhuj-II PS(GIS) 220kV S/c line along-with associated bays at generation end

21 Renew Solar Power Private Ltd. (RSPPL-Bhuj)

250

Renew Solar Power Private Ltd. (RSPPL-Bhuj) - Bhuj PS 220kV S/c line along-with associated bays at generation end

Renew Solar Power Private Ltd. (RSPPL-Bhuj) - Bhuj-II PS(GIS) 220kV S/c line along-with associated bays at generation end

22 Renew Solar 250 Renew Solar Power Private Renew Solar Power Private

Page 21: MergedFile - POWERGRID WR LTA...26 4 7 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250 17-Jan-18 31-May-19 Bhuj PS 1200000990 27 4 8 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250

Agenda of 27th Meeting of WR constituents for Connectivity & LTA applications

Page 16 of 33

Sl.

No.

Name of

Applicant

Connectivity

Quantum

(MW)

Proposed Stage-I Connectivity System – (To be implemented by the generation developer)

Primary location Alternate location

Power Private Ltd. (RSPPL-Bhuj)

Ltd. (RSPPL-Bhuj) - Bhuj PS 220kV S/c line along-with associated bays at generation end

Ltd. (RSPPL-Bhuj) - Bhuj-II PS(GIS) 220kV S/c line along-with associated bays at generation end

23 Torrent Power Ltd.(TPL- Lakhpat Bhuj)

300

Torrent Power Ltd.(TPL- Lakhpat Bhuj) - Bhuj PS 220kV S/c line along-with associated bays at generation end

Torrent Power Ltd.(TPL- Lakhpat Bhuj) - Bhuj-II PS(GIS) 220kV S/c line along-with associated bays at generation end

24 Torrent Power Ltd.(TPL- Nakhatrana Bhuj)

400

Torrent Power Ltd.(TPL- Nakhatrana Bhuj) - Bhuj PS 220kV D/c line along-with associated bays at generation end

Torrent Power Ltd.(TPL- Nakhatrana Bhuj) - Bhuj-II PS(GIS) 220kV D/c line along-with associated bays at generation end

25 Torrent Power Ltd.(TPL- Junachay Bhuj)

200

Torrent Power Ltd.(TPL- Junachay Bhuj) - Bhuj PS 220kV S/c line along-with associated bays at generation end

Torrent Power Ltd.(TPL- Junachay Bhuj) - Bhuj-II PS(GIS) 220kV S/c line along-with associated bays at generation end

26 Renew Power Ventures Pvt Ltd (RPVPL-Mandvi)

300

Renew Power Ventures Pvt Ltd (RPVPL-Mandvi) - Bhuj PS 220kV S/c line along-with associated bays at generation end

Renew Power Ventures Pvt Ltd (RPVPL-Mandvi) - Bhuj-II PS(GIS) 220kV S/c line along-with associated bays at generation end

27

ALFANAR ENERGY PRIVATE LIMITED (AEPL- Kotda Madh)

300

ALFANAR ENERGY PRIVATE LIMITED (AEPL- Kotda Madh) - Bhuj PS 220kV S/c line along-with associated bays at generation end

ALFANAR ENERGY PRIVATE LIMITED (AEPL- Kotda Madh) - Bhuj-II PS(GIS) 220kV S/c line along-with associated bays at generation end

28

NIRLOOTI RENEWABLE PRIVATE LIMITED (NRPL-Jarjok)

300

NIRLOOTI RENEWABLE PRIVATE LIMITED (NRPL-Jarjok) - Bhuj PS 220kV S/c line along-with associated bays at generation end

NIRLOOTI RENEWABLE PRIVATE LIMITED (NRPL-Jarjok) - Bhuj-II PS(GIS) 220kV S/c line along-with associated bays at generation end

29

RENEW POWER VENTURES PRIVATE LIMITED (RPVPL-Nakhatrana)

300

RENEW POWER VENTURES PRIVATE LIMITED (RPVPL-Nakhatrana) - Bhuj PS 220kV S/c line along-with associated bays at generation end

RENEW POWER VENTURES PRIVATE LIMITED (RPVPL-Nakhatrana) - Bhuj-II PS(GIS) 220kV S/c line along-with associated bays at generation end

30

KILAJ SOLAR( MAHARASHTRA) PRIVATE LIMITED (KSMPL-Lakpat)

300

KILAJ SOLAR( MAHARASHTRA) PRIVATE LIMITED (KSMPL-Lakpat) - Bhuj PS 220kV S/c line along-with associated bays at generation end

KILAJ SOLAR( MAHARASHTRA) PRIVATE LIMITED (KSMPL-Lakpat) - Bhuj-II PS(GIS) 220kV S/c line along-with associated bays at generation end

31 Netra Wind Pvt Ltd

300

Netra Wind Pvt Ltd - Bhuj PS 220kV S/c line along-with associated bays at generation end

Netra Wind Pvt Ltd - Bhuj-II PS(GIS) 220kV S/c line along-with associated bays at generation end

32 Ostro Kutch Wind 300 Ostro Kutch Wind Pvt. Ltd. -

Bhuj PS 220kV S/c line Ostro Kutch Wind Pvt. Ltd. -

Bhuj-II PS 220kV S/c line

Page 22: MergedFile - POWERGRID WR LTA...26 4 7 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250 17-Jan-18 31-May-19 Bhuj PS 1200000990 27 4 8 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250

Agenda of 27th Meeting of WR constituents for Connectivity & LTA applications

Page 17 of 33

Sl.

No.

Name of

Applicant

Connectivity

Quantum

(MW)

Proposed Stage-I Connectivity System – (To be implemented by the generation developer)

Primary location Alternate location

Pvt. Ltd. along-with associated bays at generation end

along-with associated bays at generation end

Total

8702 (+200 capacity

enhancement

requested)

*Connectivity of above applicants with the grid shall be established with the commissioning of above

mentioned connectivity system and Bhuj PS (765/400/220kV) – Banaskantha PS (765kV) – Sankhari

(400kV) Corridor or Bhuj PS (765/400/220kV) – Banaskantha PS (765kV) – Chittorgarh PS (765kV) –

Chittorgarh (RVPN) (400kV) corridor.

Connectivity Applicants in the vicinity of Bhuj PS and Lakadia PS

2.4 Connectivity Applications received in the vicinity of Parli:

Total eight nos. of connectivity applications have been received in the vicinity of

Parli(PG) for a quantum of 1500MW. Summary of the same is given below:

Page 23: MergedFile - POWERGRID WR LTA...26 4 7 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250 17-Jan-18 31-May-19 Bhuj PS 1200000990 27 4 8 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250

Agenda of 27th Meeting of WR constituents for Connectivity & LTA applications

Page 18 of 33

No. of applicants

Quantum in MW No. of bays reqd.

220kV 400kV 220kV 400kV

New Connectivity Received

7 1500 0 8 0

Total 7 1500 0 8 0

The primary connectivity point for the new connectivity applicants in the vicinity of

Parli area shall be 400/220kV Parli(PG) S/s.

Further, for providing connectivity for the various RE projects in Osmanabad / Parli

area, the following transmission system was discussed and in-principally agreed in

the 43rd WR SCM held on 11.05.2018:

i) Establishment of 3x1500MVA, 765/400/220kV Kallam PS (GIS) ii) Kallam – Parli (New) 765kV D/c line (~70km)

OR LILO of one circuit of Parli (New) – Solapur 765kV D/c line at Kallam (GIS)

Hence, the above transmission system may be used for providing alternate

connectivity to the connectivity applicants in vicinity of Parli area.

Accordingly, the following dedicated connectivity system is proposed for the RE

applicants proposed to be pooled at Parli(PG) (primary location) / Kallam PS

(alternate location):

Table: 5 Sl.

No.

Name of Applicant Connecti

vity

Quantum

(MW)

Proposed Stage-I Connectivity System – (To be implemented by the generation developer)

Primary location Alternate location

1

Green Infra Wind Energy Ltd. (GIWEL-Osmanabad)

500

Green Infra Wind Energy Ltd. (GIWEL-Osmanabad) - Parli 220kV D/c line along-with associated bays at generation end

Green Infra Wind Energy Ltd. (GIWEL-Osmanabad) - Kallam PS(GIS) 220kV D/c line along-with associated bays at generation end

2 Gagodar Renewable Energy Pvt. Ltd. (GREPL-Deosingha)

200

Gagodar Renewable Energy Pvt. Ltd. (GREPL-Deosingha) - Parli 220kV S/c line along-with associated bays at generation end

Gagodar Renewable Energy Pvt. Ltd. (GREPL-Deosingha) - Kallam PS(GIS) 220kV S/c line along-with associated bays at generation end

3 Osmanabad Renewable Pvt. Ltd. (ORPL-Vaidyakinhi)

200

Osmanabad Renewable Pvt. Ltd. (ORPL-Vaidyakinhi) - Parli 220kV S/c line along-with associated bays at generation end

Osmanabad Renewable Pvt. Ltd. (ORPL-Vaidyakinhi) - Kallam PS(GIS) 220kV S/c line along-with associated bays at generation end

4 Ghatpimpri Renewable Pvt. Ltd. (GRPL-Ghatpimpri)

200

Ghatpimpri Renewable Pvt. Ltd. (GRPL-Ghatpimpri) - Parli 220kV S/c line along-with associated bays at generation end

Ghatpimpri Renewable Pvt. Ltd. (GRPL-Ghatpimpri) - Kallam PS(GIS) 220kV S/c line along-with associated bays at generation end

5 Nellore Renewable Pvt. Ltd. (NRPL-

100 Nellore Renewable Pvt. Ltd.

(NRPL-Chinchoti) - Parli Nellore Renewable Pvt. Ltd.

(NRPL-Chinchoti) - Kallam

Page 24: MergedFile - POWERGRID WR LTA...26 4 7 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250 17-Jan-18 31-May-19 Bhuj PS 1200000990 27 4 8 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250

Agenda of 27th Meeting of WR constituents for Connectivity & LTA applications

Page 19 of 33

Sl.

No.

Name of Applicant Connecti

vity

Quantum

(MW)

Proposed Stage-I Connectivity System – (To be implemented by the generation developer)

Primary location Alternate location

Chinchoti) 220kV S/c line along-with associated bays at generation end

PS(GIS) 220kV S/c line along-with associated bays at generation end

6 Bhuj Renewable Pvt. Ltd. (BRPL-Sarfarajpur)

150

Bhuj Renewable Pvt. Ltd. (BRPL-Sarfarajpur) - Parli 220kV S/c line along-with associated bays at generation end

Bhuj Renewable Pvt. Ltd. (BRPL-Sarfarajpur) - Kallam PS(GIS) 220kV S/c line along-with associated bays at generation end

7

Bapuram Renewable Pvt. Ltd. (BRPL-Nekhnoor)

150

Bapuram Renewable Pvt. Ltd. (BRPL-Nekhnoor) - Parli 220kV S/c line along-with associated bays at generation end

Bapuram Renewable Pvt. Ltd. (BRPL-Nekhnoor) - Kallam PS(GIS) 220kV S/c line along-with associated bays at generation end

Total 1500

Connectivity Applicants in the vicinity of Parli

2.5 Connectivity Applications received in the vicinity of Solapur:

Total eight nos. of connectivity applications have been received in the vicinity of

Solapur for a quantum of 850MW. Summary of the same is given below:

Page 25: MergedFile - POWERGRID WR LTA...26 4 7 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250 17-Jan-18 31-May-19 Bhuj PS 1200000990 27 4 8 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250

Agenda of 27th Meeting of WR constituents for Connectivity & LTA applications

Page 20 of 33

No. of applicants

Quantum in MW No. of bays reqd.

220kV 400kV 220kV 400kV

New Connectivity Received

4 850 0 4 0

Total 4 850 0 4 0

Considering the large quantum of RE generation in the vicinity of Tuljapur (850MW)

and non availability of space at existing Solapur(PG) S/s at 220kV level, it is

proposed to develop a new pooling station near Tuljapur for RE projects in Solapur

area. Accordingly, the following common transmission system is proposed:

Common Transmission System for Connectivity of renewable generations

around Solapur area :

Establishment of 2x500MVA, 400/220kV Tuljapur PS (GIS)

Tuljapur PS – Solapur 400kV D/c (quad) line (about 30 – 40 km)

1x125MVAr, 420kV Bus reactor at Tuljapur PS.

Further, for providing alternate connectivity for the above connectivity applicants,

2x500MVA, 400/220kV Tuljapur-II PS (GIS) is proposed.

Table: 6 Sl.

No.

Name of Applicant Connecti

vity

Quantum

(MW)

Proposed Stage-I Connectivity System – (To be implemented by the generation developer)

Primary location Alternate location

1 Aspan Infrastructure Ltd (AIL-Nagral)

200

Aspan Infrastructure Ltd (AIL-Nagral) - Tuljapur PS (GIS) 220kV S/c line along-with associated bays at generation end

Aspan Infrastructure Ltd (AIL-Nagral) - Tuljapur -II PS(GIS) 220kV S/c line along-with associated bays at generation end

2 Suvidha Renewable Energy Pvt. Ltd. (SREPL-Morda)

250

Suvidha Renewable Energy Pvt. Ltd. (SREPL-Morda) - Tuljapur PS (GIS) 220kV S/c line along-with associated bays at generation end

Suvidha Renewable Energy Pvt. Ltd. (SREPL-Morda) - Tuljapur -II PS(GIS) 220kV S/c line along-with associated bays at generation end

3 Mytrah Energy (India) Private Ltd. (MEIPL-Dahitanewadi)

200

Mytrah Energy (India) Private Ltd. (MEIPL-Dahitanewadi) - Tuljapur PS (GIS) 220kV S/c line along-with associated bays at generation end

Mytrah Energy (India) Private Ltd. (MEIPL-Dahitanewadi) - Tuljapur -II PS(GIS) 220kV S/c line along-with associated bays at generation end

4 Gadag Renewable Pvt. Ltd. (GRPL-Lohara)

200

Gadag Renewable Pvt. Ltd. (GRPL-Lohara) - Tuljapur PS (GIS) 220kV S/c line along-with associated bays at generation end

Gadag Renewable Pvt. Ltd. (GRPL-Lohara) - Tuljapur -II(GIS) PS 220kV S/c line along-with associated bays at generation end

Total 850

Page 26: MergedFile - POWERGRID WR LTA...26 4 7 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250 17-Jan-18 31-May-19 Bhuj PS 1200000990 27 4 8 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250

Agenda of 27th Meeting of WR constituents for Connectivity & LTA applications

Page 21 of 33

Connectivity Applicants in the vicinity of Solapur

2.6 Connectivity Applications received in the vicinity of Rajgarh :

Earlier, one no. connectivity application was received at Rajgarh substation from

Gamesha Renewables Pvt. Ltd. (GRPL-Khod) for 218MW. Following transmission

system was proposed for providing connectivity to GRPL-Khod during the 24th WR

Conn/LTA meeting held on 21.12.2016:

Table 7 S.N Name of Applicant Connectivity

Quantum

(MW)

Proposed Connectivity System (To be

implemented by the generation developer)

1

Gamesha

Renewables Pvt.

Ltd. (GRPL-Khod)

218 GRPL (Khod) – Rajgarh (PG) 220kV S/c line along

with associated line bays at both ends

During discussions in the same meeting, MPPTCL informed that 218MW wind farm

of M/s GRPL-Khod has already been granted connectivity to STU network by

MPPTCL. Subsequently, GRPL vide its letter dated 22.12.2016 to CTU with copy to

MPPTCL submitted additional information in this regard stating that the generation

project referred above by MPPTCL is different than the generation project under

discussion. GRPL further requested to revise the project capacity from 218MW to

200MW and commissioning schedule from 31.03.2017 to 31.03.2019. MPPTCL vide

email dated 20-01-2017 had stated that they have no information regarding

development of any other project of GRPL at the same location except 218MW wind

power project at village-Khod in Dhar district of M.P.Accordingly, it was decided to

Page 27: MergedFile - POWERGRID WR LTA...26 4 7 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250 17-Jan-18 31-May-19 Bhuj PS 1200000990 27 4 8 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250

Agenda of 27th Meeting of WR constituents for Connectivity & LTA applications

Page 22 of 33

review the application in the next meeting. M/s GIWEL may clarify regarding the

same.

Subsequently, two new connectivity applications have been received at Rajgarh

substation with details given in table-1. Accordingly, total three nos. of connectivity

applications in the vinity of Rajgarh for a quantum of 668MW are to be processed.

Summary of the same is given below:

No. of applicants

Quantum in MW No. of bays reqd.

220kV 400kV 220kV 400kV

New Connectivity Received

3 668 0 3 0

Total 3 668 0 3 0

The primary connectivity point for the new connectivity applicants in the vicinity of

Rajgarh area shall be 400/220kV Rajgarh(PG) S/s. Further, for providing alternate

connectivity for the above connectivity applicants, 2x500MVA, 400/220kV Rajgarh-II

is proposed. Accordingly, the following dedicated connectivity system is proposed for

the RE applicants proposed to be pooled at Rajgarh (primary location) / Rajgarh-II

(alternate location):

Table 8 Sl.

No.

Name of Applicant Connecti

vity

Quantum

(MW)

Proposed Stage-I Connectivity System – (To be implemented by the generation developer)

Primary location Alternate location

1 Gamesha Renewables Pvt. Ltd. (GRPL-Khod)

218

GRPL (Khod) – Rajgarh 220kV S/c line along with associated line bays at generation end

GRPL (Khod) – Rajgarh-II 220kV S/c line along with associated line bays at generation end

2 Green Infra Wind Energy Ltd. (GIWEL-Rajgarh)

250

Green Infra Wind Energy Ltd. (GIWEL-Rajgarh) - Rajgarh 220kV S/c line along-with associated bays at generation end

Green Infra Wind Energy Ltd. (GIWEL-Rajgarh) - Rajgarh-II 220kV S/c line along-with associated bays at generation end

3 Sankanur Renewable Energy Pvt. Ltd. (SREPL-Kod)

200

Sankanur Renewable Energy Pvt. Ltd. (SREPL-Kod) - Rajgarh 220kV S/c line along-with associated bays at generation end

Sankanur Renewable Energy Pvt. Ltd. (SREPL-Kod) - Rajgarh-II 220kV S/c line along-with associated bays at generation end

Total 668

2.7 Connectivity Applications received in the vicinity of Kolhapur :

Total one no. of new connectivity application has been received in the vicinity of

Kolhapur for a quantum of 200MW. Summary of the same is given below:

Page 28: MergedFile - POWERGRID WR LTA...26 4 7 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250 17-Jan-18 31-May-19 Bhuj PS 1200000990 27 4 8 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250

Agenda of 27th Meeting of WR constituents for Connectivity & LTA applications

Page 23 of 33

No. of applicants

Quantum in MW No. of bays reqd.

220kV 400kV 220kV 400kV

Earlier Granted Connectivity

1 100 0 1 0

New Connectivity Received

1 200 0 1 0

Total 1 300 0 2 0

Earlier, one no. of applicant (BLP Vayu (Project2) Pvt. Ltd.) has been granted

connectivity for 100MW at Kolhapur (PG) substation with the following transmission

system to be developed by the generation developer:

(i) BLPVPL(Bololi) – Kolhapur GIS 220kV S/c line along with associated line bays at both ends

(ii) Installation of 1x500MVA, 400/220kV ICT at Kolhapur GIS@

@ 220kV cables shall be required for the interconnection of 400/220kV ICT to 220kV GIS

module

Now, a new connectivity application from Mytrah Energy (India) Pvt. Ltd. (MEIPL-

Mudshingi) for 200MW has been received at Kolhapur Substation with details as

given in table-1. Accordingly, considering that two renewable generations shall now

be pooled at Kolhapur Switching station, it is proposed to revise connectivity system

of M/s BLPVPL(Bololi) and grant fresh connectivity to M/s MEIPL(Mudshingi) with

following transmission system:

Common Transmission System for Connectivity of renewable generations

around Kolhapur area (viz BLPVPL(Bololi) and MEIPL(Mudshingi)

Installation of 1x500MVA, 400/220kV ICT at Kolhapur GIS@

@ 220kV cables shall be required for the interconnection of 400/220kV ICT to 220kV GIS

module

Further, for providing alternate connectivity for the above connectivity applicants,

2x500MVA, 400/220kV Kolhapur-II is proposed. Accordingly, the following

dedicated connectivity system is proposed for the RE applicants proposed to be

pooled at Kolhapur (primary location) / Kolhapur-II (alternate location):

Page 29: MergedFile - POWERGRID WR LTA...26 4 7 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250 17-Jan-18 31-May-19 Bhuj PS 1200000990 27 4 8 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250

Agenda of 27th Meeting of WR constituents for Connectivity & LTA applications

Page 24 of 33

Table: 9 Sl.

No.

Name of Applicant Connecti

vity

Quantum

(MW)

Proposed Stage-I Connectivity System – (To be implemented by the generation developer)

Primary location Alternate location

1 BLP Vayu (Project 2) Pvt. Ltd. (BLPVPL-Bololi)

100

BLP Vayu (Project 2) Pvt. Ltd. (BLPVPL-Bololi) – Kolhapur 220kV S/c line along with associated line bays at generation end

BLP Vayu (Project 2) Pvt. Ltd. (BLPVPL-Bololi) – Kolhapur-II 220kV S/c line along with associated line bays at generation end

2 Mytrah Energy (India) Pvt. Ltd. (MEIPL-Mudshingi)

200

Mytrah Energy (India) Pvt. Ltd. (MEIPL-Mudshingi) - Kolhapur 220kV S/c line along-with associated bays at generation end

Mytrah Energy (India) Pvt. Ltd. (MEIPL-Mudshingi) - Kolhapur-II 220kV S/c line along-with associated bays at generation end

Total 300

2.8 Connectivity Application received in the vicinity of Aurangabad :

Total three nos. of new connectivity applications have been received in the vicinity of

Aurangabad for a quantum of 800MW. Summary of the same is given below:

No. of applicants

Quantum in MW No. of bays reqd.

220kV 400kV 220kV 400kV

New Connectivity Received

3 800 0 3 0

Total 3 800 0 3 0

Details of the connectivity applications received at Aurangabad S/s are given in

Table 1.

The primary connectivity point for the new connectivity applicants in the vicinity of

Aurangabad area shall be 765/400/220kV Aurangabad(PG) S/s. Further, for

providing alternate connectivity for the above connectivity applicants, 2x500MVA,

400/220kV Aurangabad-II is proposed. Accordingly, the following dedicated

connectivity system is proposed for the RE applicants proposed to be pooled at

Aurangabad (primary location) / Aurangabad-II (alternate location):

Page 30: MergedFile - POWERGRID WR LTA...26 4 7 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250 17-Jan-18 31-May-19 Bhuj PS 1200000990 27 4 8 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250

Agenda of 27th Meeting of WR constituents for Connectivity & LTA applications

Page 25 of 33

Table 10

Sl.

No.

Name of Applicant Connecti

vity

Quantum

(MW)

Proposed Stage-I Connectivity System – (To be implemented by the generation developer)

Primary location Alternate location

1 Mytrah Energy (India) Pvt. Ltd. (MEIPL-Umravati)

200

Mytrah Energy (India) Pvt. Ltd. (MEIPL-Umravati) - Aurangabad 220kV S/c line along-with associated bays at generation end

Mytrah Energy (India) Pvt. Ltd. (MEIPL-Umravati) - Aurangabad II 220kV S/c line along-with associated bays at generation end

2

Clean Wind Power Private Limited (CWPPLRampurwadi)

300

Clean Wind Power Private Limited (CWPPLRampurwadi) - Aurangabad 220kV S/c line along-with associated bays at generation end

Clean Wind Power Private Limited (CWPPLRampurwadi) - Aurangabad II 220kV S/c line along-with associated bays at generation end

3

Chikkodi Renewable Power Private Limited (CRPPL-Buldhana)

300

Chikkodi Renewable Power Private Limited (CRPPL-Buldhana) - Aurangabad 220kV S/c line along-with associated bays at generation end

Chikkodi Renewable Power Private Limited (CRPPL-Buldhana) - Aurangabad II 220kV S/c line along-with associated bays at generation end

Total 800

2.9 Connectivity Application received in the vicinity of Shujalpur :

Total two nos. of new connectivity applications have been received in the vicinity of

Shujalpur for a quantum of 500MW. Summary of the same is given below:

No. of applicants

Quantum in MW No. of bays reqd.

220kV 400kV 220kV 400kV

New Connectivity Received

2 500 0 2 0

Total 2 500 0 2 0

Details of connectivity applications from M/s Mytrah Energy (India) Pvt. Ltd. (MEIPL-

Sehore) and Gudadanal Renewable Private Limited (GRPL-Badgaon) received at

Shujalpur S/s are given in Table 1. Here it may be mention that there is no space

available at existing 400/220 kV Shujalpur S/s. Accordingly a new 400/220kV

Substation in the vicinity of Shujalpur PG may be established which may further be

connected to existing Shujalpur substation through Shujalpur-II – Shujalpur 400kV

D/c line. Hence, the following common transmission system is proposed:

Common Transmission System for Connectivity of renewable generations in

Bina area :

Shujalpur-II – Shujalpur 400kV D/c line

Establishment of 2x500MVA, 400/220kV Shujalpur-II (GIS) substation

1x125MVAR, 420kV Bus Reactor at Shujalpur-II

Page 31: MergedFile - POWERGRID WR LTA...26 4 7 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250 17-Jan-18 31-May-19 Bhuj PS 1200000990 27 4 8 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250

Agenda of 27th Meeting of WR constituents for Connectivity & LTA applications

Page 26 of 33

Further, for providing alternate connectivity for the above connectivity applicants,

2x500MVA, 400/220kV Shujalpur-III is proposed. Accordingly, the following

dedicated connectivity system is proposed for the RE applicants proposed to be

pooled at Shujalpur-II (primary location) / Shujalpur-III (alternate location):

Table 11

Sl.

No.

Name of Applicant Connecti

vity

Quantum

(MW)

Proposed Stage-I Connectivity System – (To be implemented by the generation developer)

Primary location Alternate location

1 Mytrah Energy (India) Pvt. Ltd. (MEIPL-Sehore)

200

Mytrah Energy (India) Pvt. Ltd. (MEIPL-Sehore) - Shujalpur-II 220kV S/c line along-with associated bays at generation end

Mytrah Energy (India) Pvt. Ltd. (MEIPL-Sehore) - Shujalpur-III 220kV S/c line along-with associated bays at generation end

2

Gudadanal Renewable Private Limited (GRPL-Badgaon)

300

Gudadanal Renewable Private Limited (GRPL-Badgaon) - Shujalpur-II 220kV S/c line along-with associated bays at generation end

Gudadanal Renewable Private Limited (GRPL-Badgaon) - Shujalpur-III 220kV S/c line along-with associated bays at generation end

Total 500

2.10 Connectivity Application received in the vicinity of Bina :

Total one no. of new connectivity application has been received in the vicinity of Bina

for a quantum of 200MW. Summary of the same is given below:

No. of applicants

Quantum in MW No. of bays reqd.

220kV 400kV 220kV 400kV

New Connectivity Received

1 200 0 1 0

Total 1 200 0 1 0

Details of connectivity application from M/s Mytrah Energy (India) Pvt. Ltd. (MEIPL-

Chippon) received at Bina S/s are given in Table 1. Here it may be mention that

there is no space available at existing 400/220 kV Bina S/s. Accordingly a new

400/220kV Substation in the vicinity of Bina PG may be established which may

further be connected to existing Shujalpur substation through Bina-II – Shujalpur

400kV D/c line. Hence, the following common transmission system is proposed:

Common Transmission System for Connectivity of renewable generations in

Bina area :

Bina-II – Shujalpur 400kV D/c line

Establishment of 2x500MVA, 400/220kV Bina-II (GIS) substation

1x125MVAR, 420kV Bus Reactor at Bina-II

Page 32: MergedFile - POWERGRID WR LTA...26 4 7 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250 17-Jan-18 31-May-19 Bhuj PS 1200000990 27 4 8 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250

Agenda of 27th Meeting of WR constituents for Connectivity & LTA applications

Page 27 of 33

Further, for providing alternate connectivity for the above connectivity applicant,

2x500MVA, 400/220kV Bina-III is proposed. Accordingly, the following dedicated

connectivity system is proposed for the RE applicant proposed to be pooled at Bina-

II (primary location) / Bina-III (alternate location):

Table 12

Sl.

No.

Name of Applicant Connecti

vity

Quantum

(MW)

Proposed Stage-I Connectivity System – (To be implemented by the generation developer)

Primary location Alternate location

1 Mytrah Energy (India) Pvt. Ltd. (MEIPL-Chippon)

200

MEIPL(Chippon) – Bina-II 220kV S/c line along with associated line bays at both ends

MEIPL(Chippon) – Bina-III 220kV S/c line along with associated line bays at both ends

Total 200

2.11 Connectivity Application received in the vicinity of Devbhumi Dwarka :

Total four nos. of new connectivity applications have been received in the vicinity of

Devbhumi Dwarka for a quantum of 1200MW. Summary of the same is given below:

No. of applicants

Quantum in MW No. of bays reqd.

220kV 400kV 220kV 400kV

New Connectivity Received

4 1200 0 5 0

Total 4 1200 0 5 0

Details of connectivity applications from M/s POWERICA Ltd. (POWERICA-Jam

Khambhaliya), M/s Airpower Windfarms Pvt. Ltd. (AWPL-Jam Khambhaliya), M/s KP

Energy Ltd.. (KPEL-Sidhpur) and M/s Mathak Wind Farms Private Limited (MWFPL-

Modpar) received at Devbhumi Dwarka are given in Table 1. In order to provide

primary location of connectivity to the wind project, a new 400/220kV Substation in

the vicinity of Jam Khambhaliya may be established which may further be connected

to Bhachau substation through extension of Essar – Bhachau 400kV D/c line upto

Bhogat (about 20km. line extension).

Accordingly, following Transmission System for connectivity in Gujarat is proposed

for providing primary connectivity location to above applicants:

Establishment of 2x500MVA, 400/220kV GIS Pooling Station at Jam

Khambhaliya

Extension of Essar (EPGL) – Bhachau 400kV D/c (triple) line upto Jam

Khambhaliya (about 20km.) (with high capacity conductor enabling atleast

1650MW power transfer at nominal voltage)

1x125MVAr, 420kV Bus reactor at Jam Khambhaliya GIS PS

Page 33: MergedFile - POWERGRID WR LTA...26 4 7 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250 17-Jan-18 31-May-19 Bhuj PS 1200000990 27 4 8 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250

Agenda of 27th Meeting of WR constituents for Connectivity & LTA applications

Page 28 of 33

Further, for providing alternate connectivity for the above connectivity applicants,

2x500MVA, 400/220kV Jam Khambhaliya-II is proposed. Accordingly, the following

dedicated connectivity system is proposed for the RE applicants proposed to be

pooled at Jam Khambhaliya(primary location) / Jam Khambhaliya-II (alternate

location): Table 13

Sl.

No.

Name of Applicant Connecti

vity

Quantum

(MW)

Proposed Stage-I Connectivity System – (To be implemented by the generation developer)

Primary location Alternate location

1 POWERICA Ltd. (POWERICA-Jam Khambhaliya)

250

POWERICA Ltd. (POWERICA-Jam Khambhaliya) - Jam Khambhaliya PS 220kV S/c line along-with associated bays at generation end

POWERICA Ltd. (POWERICA-Jam Khambhaliya) - Jam Khambhaliya-II PS 220kV S/c line along-with associated bays at generation end

2

Airpower Windfarms Pvt. Ltd. (AWPL-Jam Khambhaliya)

250

Airpower Windfarms Pvt. Ltd. (AWPL-Jam Khambhaliya) - Jam Khambhaliya PS 220kV S/c line along-with associated bays at generation end

Airpower Windfarms Pvt. Ltd. (AWPL-Jam Khambhaliya) - Jam Khambhaliya-II PS 220kV S/c line along-with associated bays at generation end

3 KP Energy Ltd.. (KPEL-Sidhpur)

400

KP Energy Ltd.. (KPEL-Sidhpur) - Jam Khambhaliya PS 220kV D/c line along-with associated bays at generation end

KP Energy Ltd.. (KPEL-Sidhpur) - Jam Khambhaliya-II PS 220kV D/c line along-with associated bays at generation end

4

Mathak Wind Farms Private Limited (MWFPL-Modpar)

300

Mathak Wind Farms Private Limited (MWFPL-Modpar) - Jam Khambhaliya PS 220kV S/c line along-with associated bays at generation end

Mathak Wind Farms Private Limited (MWFPL-Modpar) - Jam Khambhaliya-II PS 220kV S/c line along-with associated bays at generation end

Total 1200

Page 34: MergedFile - POWERGRID WR LTA...26 4 7 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250 17-Jan-18 31-May-19 Bhuj PS 1200000990 27 4 8 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250

Agenda of 27th Meeting of WR constituents for Connectivity & LTA applications

Page 29 of 33

Connectivity Applicants in the vicinity of Jam Khambhaliya PS

2.12 Connectivity Application received in the vicinity of Betul :

Total one no. of new connectivity application has been received in the vicinity of

Betul for a quantum of 300MW. Summary of the same is given below:

No. of applicants

Quantum in MW No. of bays reqd.

220kV 400kV 220kV 400kV

New Connectivity Received

1 300 0 1 0

Total 1 300 0 1 0

Detail of connectivity application from M/s INOX Wind Infrastructure Services. Ltd.

(IWISL-Dhakna) received at Betul (GIS) S/s are given in Table 1.

The primary connectivity point for the new connectivity applicants in the vicinity of

Betul area shall be 400/220kV Betul(PG) S/s. For providing alternate connectivity for

the above connectivity applicants, 2x500MVA, 400/220kV Betul-II PS (GIS) is

proposed.

Accordingly, the following dedicated connectivity system is proposed for the RE

applicant proposed to be pooled at Betul (primary location) / Betul-II (alternate

location):

Page 35: MergedFile - POWERGRID WR LTA...26 4 7 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250 17-Jan-18 31-May-19 Bhuj PS 1200000990 27 4 8 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250

Agenda of 27th Meeting of WR constituents for Connectivity & LTA applications

Page 30 of 33

Table 14

Sl.

No.

Name of Applicant Connecti

vity

Quantum

(MW)

Proposed Stage-I Connectivity System – (To be implemented by the generation developer)

Primary location Alternate location

1

INOX Wind Infrastructure Services. Ltd. (IWISL-Dhakna)

300

INOX Wind Infrastructure Services. Ltd. (IWISL-Dhakna) - Betul 220kV S/c line along-with associated bays at generation end

INOX Wind Infrastructure Services. Ltd. (IWISL-Dhakna) – Betul-II 220kV S/c line along-with associated bays at generation end

Total 300

2.13 Connectivity Application received in the vicinity of Vadodara :

Total one no. of new connectivity application has been received in the vicinity of

Vadodara for a quantum of 100MW. Summary of the same is given below:

No. of applicants

Quantum in MW No. of bays reqd.

220kV 400kV 220kV 400kV

New Connectivity Received

1 100 0 1 0

Total 1 100 0 1 0

Details of connectivity application from M/s Azure Power India Private Limited

(APIPL-Amreshwar) received at Vadodara S/s are given in Table 1. Here it may be

mention that no injection margin is available at existing 400/220 kV Vadodara PG

(GIS) S/s at 220kV level as it leads to overloading of 220kV downstream system.

Accordingly following is proposed to provide connectivity for the RE applicant in

vicinity of Vadodara:

Installation of 1x500MVA, 400/220kV ICT (3rd) at Vadodara(PG) GIS

Splitting of 220kV Vadodara bus into two sections such that Section 1

contains all existing 220kV downstream connectivity lines and ICTs and

Section 2 is connected with the new proposed ICT (3rd)

Accordingly, the primary connectivity point for the new connectivity applicant in the

vicinity of Vadodara area shall be 400/220kV Vadodara(PG) (GIS) S/s – Section 2

(as proposed above).

Further, for providing alternate connectivity for the above connectivity applicant,

2x500MVA, 400/220kV Vadodara-II (GIS) is proposed. Accordingly, the following

dedicated connectivity system is proposed for the RE applicant proposed to be

pooled at Vadodara (Section 2) (primary location) / Vadodara-II (alternate location):

Page 36: MergedFile - POWERGRID WR LTA...26 4 7 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250 17-Jan-18 31-May-19 Bhuj PS 1200000990 27 4 8 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250

Agenda of 27th Meeting of WR constituents for Connectivity & LTA applications

Page 31 of 33

Table 15

Sl.

No.

Name of Applicant Connecti

vity

Quantum

(MW)

Proposed Stage-I Connectivity System – (To be implemented by the generation developer)

Primary location Alternate location

1 Azure Power India Private Limited (APIPL-Amreshwar)

100

Azure Power India Private Limited (APIPL-Amreshwar) - Vadodara (GIS) (section 2) 220kV S/c line along-with associated bays at generation end

Azure Power India Private Limited (APIPL-Amreshwar) - Vadodara-II (GIS) PS 220kV S/c line along-with associated bays at generation end

Total 100

Members may discuss.

3 Proposal of Adani Green Energy Limited to optimize connectivity system for

their 1000MW and 500MW wind farms and 750MW solar project at Khavda

Adani Green Energy Ltd. have made three connectivity applications for their

1000MW & 500MW wind farms and 750MW solar park in the vicinity of Khavda,

Kutchh. The applications were granted connectivity in line with the discussions held

during the 24th WR Conn/LTA meeting wherein the following transmission system for

connectivity was agreed:

Sl.

No.

Name of Applicant Connectivity

Quantum

(MW)

Connectivity System* Implementing

Agency

1 Adani Green Energy Ltd. (AGEL-Khavda)

1000

AGEL Khavda (1000MW Wind farm) – Bhuj P.S. 400kV D/c line along with associated line bays at both ends

AGEL Applicant

(Common stretch of the two 400kV D/c lines from AGEL Khavda (750MW Solar farm) and AGEL Khavda (500MW Wind farm) PS upto Bhuj PS may be implemented by AGEL using Double circuit towers)

2 Adani Green Energy Ltd. (AGEL-Khavda)

750 AGEL Khavda (750MW Solar farm) –

Bhuj P.S. 400kV S/c line along with associated line bays at both ends

3 Adani Green Energy Ltd. (AGEL-Khavda)

500 AGEL Khavda (500MW Wind) – Bhuj

P.S. 400kV S/c line along with associated line bays at both ends

*Connectivity of all applicants with the grid shall be established with the commissioning of above

mentioned connectivity system and Bhuj PS (765/400/220kV) – Banaskantha PS (765kV) – Sankhari

(400kV) Corridor or Bhuj PS (765/400/220kV) – Banaskantha PS (765kV) – Chittorgarh PS (765kV) –

Chittorgarh (RVPN) (400kV) corridor.

M/s AGEL vide letter dated 11.07.2017 have proposed to optimise their connectivity

system by establishing two nos. pooling stations and a single 400kV D/c (Quad) line

Page 37: MergedFile - POWERGRID WR LTA...26 4 7 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250 17-Jan-18 31-May-19 Bhuj PS 1200000990 27 4 8 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250

Agenda of 27th Meeting of WR constituents for Connectivity & LTA applications

Page 32 of 33

for evacuation of power from a total RE quantum of 2250MW (1000MW & 500MW

Wind and 750MW solar) as depicted below:

In view of the above request, the following modified transmission system for

connectivity is proposed:

Sl.

No.

Name of Applicant Connectivity

Quantum

(MW)

Connectivity System* Implementing

Agency

1 Adani Green Energy Ltd. (AGEL-Khavda)

1000

AGEL Khavda PS (1000MW Wind farm)

– Bhuj P.S. 400kV S/c line (high capacity

conductor enabling at least 1000MW

power transfer at nominal voltage) along

with associated line bays at generation

end

AGEL Applicant (Common stretch of the 400kV D/c lines from AGEL Khavda (1000MW/750MW/500 MW projects) upto Bhuj P.S. may be implemented by AGEL using Multi circuit towers)

2 Adani Green Energy Ltd. (AGEL-Khavda)

500

Establishment of AGEL Khavda 400/220kV Pooling Station along-with interconnection with 500MW Wind and 750MW Solar projects at 220kV level

Necessary segregation between the wind (500MW) and solar (750MW) projects (at 220kV level) so that they may be separately metered, scheduled etc.

AGEL Khavda P.S.– Bhuj P.S. 400kV S/c line (high capacity conductor enabling at least 1250MW power transfer at nominal voltage) along with associated line bays at generation end

3 Adani Green Energy Ltd. (AGEL-Khavda)

750

Page 38: MergedFile - POWERGRID WR LTA...26 4 7 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250 17-Jan-18 31-May-19 Bhuj PS 1200000990 27 4 8 Renew Solar Power Private Ltd. (RSPPL-Bhuj) 250

Agenda of 27th Meeting of WR constituents for Connectivity & LTA applications

Page 33 of 33

Proposed connectivity of AGEL RE projects in Khavda area

Bhuj PS 765/400/220kV

AGEL Khavda

(1000MW)

Wind

AGEL Khavda

(500MW) Wind

400kV M/C Tower –

D/c 400kV lines

AGEL Khavda

(750MW) Solar

AGEL Khavda

400/220kV

PS

220kV

400kV