WWW.HGOR.COM MERCEDES BENZ STADIUM Atlanta, Georgia Micheal Day HOK (816) 472-3360 The new stadium project, scheduled for completion in the fall of 2017, will be a transformation of game-day circulation and neighborhood connections, while also providing the best fan experience possible. HGOR guided efforts in providing ample room and ease for pedestrian movement, connections to adjacent neighborhoods were meaningful and signage was purposeful and integrated into the site. HGOR’s design efforts throughout the entire site, landscape material selection, and collaborative efforts on the site’s stormwater management and irrigation use will contribute to the new stadium’s LEED Gold status.

Upload: hgor

Post on 24-Jul-2016

242 views

Category:

Documents


0 download

DESCRIPTION

http://www.hgor.com/wp-content/uploads/2014/11/Mercedes-Benz-Stadium.pdf

TRANSCRIPT

  • WWW.HGOR.COM

    MERCEDES BENZ STADIUMAtlanta, Georgia

    Micheal DayHOK(816) 472-3360

    The new stadium project, scheduled for completion in the fall of 2017, will be a transformation of game-day circulation and neighborhood connections, while also providing the best fan experience possible.

    HGOR guided efforts in providing ample room and ease for pedestrian movement, connections to adjacent neighborhoods were meaningful and signage was purposeful and integrated into the site.

    HGORs design efforts throughout the entire site, landscape material selection, and collaborative efforts on the sites stormwater management and irrigation use will contribute to the new stadiums LEED Gold status.