Page 1: MEOSAR Overview - United States Coast Guard · 2017-06-08 · SAR Controllers Training 2013 19 – 21 March 2013 . Mickey Fitzmaurice . NOAA . Space Segment Engineer . ... Sept 2012

MEOSAR Overview

SAR Controllers Training 2013 19 – 21 March 2013

Mickey Fitzmaurice

NOAA Space Segment Engineer

Page 2: MEOSAR Overview - United States Coast Guard · 2017-06-08 · SAR Controllers Training 2013 19 – 21 March 2013 . Mickey Fitzmaurice . NOAA . Space Segment Engineer . ... Sept 2012

Agenda

• MEOSAR/DASS Overview

• Space Segment

• Ground Segment

• DASS POC

• MEOSAR Timeline

• Demonstration and Evaluation

• 2nd Generation Beacons

2 4/2/2013

Page 3: MEOSAR Overview - United States Coast Guard · 2017-06-08 · SAR Controllers Training 2013 19 – 21 March 2013 . Mickey Fitzmaurice . NOAA . Space Segment Engineer . ... Sept 2012

MEOSAR/DASS Overview

4/2/2013 3

Page 4: MEOSAR Overview - United States Coast Guard · 2017-06-08 · SAR Controllers Training 2013 19 – 21 March 2013 . Mickey Fitzmaurice . NOAA . Space Segment Engineer . ... Sept 2012

MEOSAR/DASS Overview

• MEOSAR/DASS Concept – Utilize multiple satellites with SAR

repeaters, or “bent pipe”

– Multiple antennas are used to receive the same beacon burst

– The time difference of arrival (TDOA) and frequency difference of arrival (FDOA) is then used to determine location

– One burst, received through 3 unique satellites, is capable of producing a location

– Essentially, GPS location in reverse

4 4/2/2013

-

SAR Aircraft

Page 5: MEOSAR Overview - United States Coast Guard · 2017-06-08 · SAR Controllers Training 2013 19 – 21 March 2013 . Mickey Fitzmaurice . NOAA . Space Segment Engineer . ... Sept 2012

MEOSAR/DASS Overview

• Medium Earth Orbit (MEO) SAR / Distress Alerting Satellite System (DASS) – Various studies determined that medium-earth orbiting (MEO) satellites

provide a vastly improved space-based distress alerting and locating system.

– NASA, with USAF Space and Air Combat Command, NOAA, and USCG are developing a capability on GPS satellites– Distress Alerting Satellite System (DASS)

• MEOSAR provides – A combination of the best assets of GEOSAR and LEOSAR

– Near instantaneous notification and location of distress

– Near 100% Availability

– Better location accuracy

– Global coverage

– Full compatibility with current and future beacons

5 4/2/2013

Page 6: MEOSAR Overview - United States Coast Guard · 2017-06-08 · SAR Controllers Training 2013 19 – 21 March 2013 . Mickey Fitzmaurice . NOAA . Space Segment Engineer . ... Sept 2012

Space Segment

• Repeaters will be flown on Medium Earth Orbit satellites (MEOSATs)

• Will utilize 3 Global Navigation Satellite System (GNSS) constellations – GPS (USA)

– GLONASS (Russia)

– Galileo (ESA) • Current plan is to have 24 US MEOSAR instruments • 72 MEOSAR instruments total

4/2/2013 6

Page 7: MEOSAR Overview - United States Coast Guard · 2017-06-08 · SAR Controllers Training 2013 19 – 21 March 2013 . Mickey Fitzmaurice . NOAA . Space Segment Engineer . ... Sept 2012

MEO vs. LEO Coverage

4/2/2013 7

Page 8: MEOSAR Overview - United States Coast Guard · 2017-06-08 · SAR Controllers Training 2013 19 – 21 March 2013 . Mickey Fitzmaurice . NOAA . Space Segment Engineer . ... Sept 2012

US MEOSAR Ground Segment Design

4/2/2013 8

Page 9: MEOSAR Overview - United States Coast Guard · 2017-06-08 · SAR Controllers Training 2013 19 – 21 March 2013 . Mickey Fitzmaurice . NOAA . Space Segment Engineer . ... Sept 2012

Ground Segment

• Prototype ground station at NASA Goddard Space Flight Center – 4 antennas – capable of

independently tracking 4 satellites

– Completed in 2008

– Successfully passed acceptance testing

– May become future operational MEOLUT

– Full participation in MEOSAR D&E testing

4/2/2013 9

Page 10: MEOSAR Overview - United States Coast Guard · 2017-06-08 · SAR Controllers Training 2013 19 – 21 March 2013 . Mickey Fitzmaurice . NOAA . Space Segment Engineer . ... Sept 2012

Ground Segment

• Accepted MEOLUT Wahiawa, Hawaii

– 6 antenna – capable of tracking 6 satellites either S-band or L-band

– Constructed in September 2011 and passed acceptance testing

• Proposed MEOLUT in Miami, Florida

– 6 antenna – capable of tracking 6 satellites either S-band or L-band

– Procurement will be released by Sept 2012

– Construction will begin Sept 2013, completed by Dec 2013

4/2/2013 10

Page 11: MEOSAR Overview - United States Coast Guard · 2017-06-08 · SAR Controllers Training 2013 19 – 21 March 2013 . Mickey Fitzmaurice . NOAA . Space Segment Engineer . ... Sept 2012

DASS Proof-of-Concept

• DASS Proof-of-Concept (POC) Space Segment – Ten current on-orbit GPS Block IIR and IIF satellites carry DASS

repeaters

– POC system uses existing GPS. Downlink at S-Band (Not ITU-allocated for SAR, but may possibly be used operationally)

• Proof-of-Concept results to date: – Demonstrated ability to locate beacons to greater than current

Cospas-Sarsat accuracy using two or more satellites

– System meets/exceeds theoretical capabilities

– Tests are on-going

4/2/2013 11

Page 12: MEOSAR Overview - United States Coast Guard · 2017-06-08 · SAR Controllers Training 2013 19 – 21 March 2013 . Mickey Fitzmaurice . NOAA . Space Segment Engineer . ... Sept 2012

MEOSAR Timeline

4/2/2013 12

Page 13: MEOSAR Overview - United States Coast Guard · 2017-06-08 · SAR Controllers Training 2013 19 – 21 March 2013 . Mickey Fitzmaurice . NOAA . Space Segment Engineer . ... Sept 2012

US MEOSAR Timeline

• Phase I – Installation of Hawaii MEOLUT

• Phase II – Networking of Data

• Phase III – MEOSAR D&E

4/2/2013 13

Page 14: MEOSAR Overview - United States Coast Guard · 2017-06-08 · SAR Controllers Training 2013 19 – 21 March 2013 . Mickey Fitzmaurice . NOAA . Space Segment Engineer . ... Sept 2012

MEOSAR Demonstration and Evaluation (D&E)

• Goals – Characterize technical and operational

performance

– Evaluate operational effectiveness

– Provide basis for recommendations on the integration of MEOSAR system into C/S

• Basis for commissioning criteria

4/2/2013 14

Page 15: MEOSAR Overview - United States Coast Guard · 2017-06-08 · SAR Controllers Training 2013 19 – 21 March 2013 . Mickey Fitzmaurice . NOAA . Space Segment Engineer . ... Sept 2012

MEOSAR Demonstration and Evaluation (D&E)

• Technical tests – Processing threshold and system margin

– Impact of interference

– Valid and complete message acquisition

– Location accuracy

– System Capacity

– Networked MEOLUT advantage

– Combined MEO/GEO performance

4/2/2013 15

Page 16: MEOSAR Overview - United States Coast Guard · 2017-06-08 · SAR Controllers Training 2013 19 – 21 March 2013 . Mickey Fitzmaurice . NOAA . Space Segment Engineer . ... Sept 2012

MEOSAR Demonstration and Evaluation (D&E)

• Operational Tests – Time advantage

– Unique detections

– Volume of ground segment traffic

– SAR/Galileo RLS

– Direct and indirect benefits of MEOSAR system

4/2/2013 16

Page 17: MEOSAR Overview - United States Coast Guard · 2017-06-08 · SAR Controllers Training 2013 19 – 21 March 2013 . Mickey Fitzmaurice . NOAA . Space Segment Engineer . ... Sept 2012

Second Generation Beacons

• Compatible with Cospas-Sarsat System

• Minimum Requirement Improvements – Independent location accuracy

– First burst transmission timeliness [3] seconds

– Increased performance in first 30 seconds

– Cancellation function

• Objective Requirement Improvements – Better encoded location

• 30 m, 95% of the time within 5 minutes of activation

– Return Link Service (RLS)

– Additional data encoded in beacon message

– Automatic ELT activation on indication of emergency

4/2/2013 17