meo ranger...dp2, navis 4000 series, 2 dpgs, taut wire smt tw-1.0 system 300m depth, 1, 2...

3
WWW.MEOGROUP.COM 2019 MEO RANGER KEY PARTICULARS Bulit 2013 Panama flagged 60 pax accommodation SPS compliant 500m 2 deck space 2300 DWT 5000 BHP FiFi 1 DP2-PSV / GEOTECHNICAL / SURVEY VESSEL

Upload: others

Post on 05-Mar-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MEO RANGER...DP2, Navis 4000 Series, 2 DPGS, Taut Wire SMT TW-1.0 System 300m depth, 1, 2 Anemometers, 2 Motion Sensors, Independent Joystick 2013 PT Loh & Loh Construction, Indonesia

www.meogroup.com

2019

MEO RANGER

key particulars▪ Bulit 2013▪ Panama flagged▪ 60 pax accommodation

▪ SPS compliant ▪ 500m2 deck space▪ 2300 DWT

▪ 5000 BHP▪ FiFi 1

dp2-psv / geotechnical / survey vessel

Page 2: MEO RANGER...DP2, Navis 4000 Series, 2 DPGS, Taut Wire SMT TW-1.0 System 300m depth, 1, 2 Anemometers, 2 Motion Sensors, Independent Joystick 2013 PT Loh & Loh Construction, Indonesia

year Built

place Built

design

Flag

length overall

length Bp

Breadth moulded

depth moulded

draFt (maX)

FreeBoard (sll)

class

notation

grt/ nrt

deadweight

Fuel oil

Fresh/drill water

liquid mud

Brine / Bilge

Ballast water

methanol

dry Bulk

Fuel oil pump

Fresh water pump

drill water pump

liquid mud pump

Brine pump

Bilge/Ballast/Fire/gs

methanol

dry Bulk compressor

anchors & chain

capstan

anchor windlass c/w Bow

crane 1

Berths

total paX

Fi-Fi notation

Fi-Fi monitors

Fi-Fi pump

liFe raFts

rescue Boat c/w davit

diving system

air diving system

clear deck area

deck carrying load

deck strength

maXimum speed

economic speed

main engines

auXiliary engines

emergency generator

shaFt generator

air compressor

Bow thruster

propellers

steering gear system

DP2, Navis 4000 Series, 2 DPGS, Taut Wire SMT TW-1.0

System 300m depth, 1, 2 Anemometers, 2 Motion Sensors,

Independent Joystick

2013

PT Loh & Loh Construction, Indonesia

Navis 4000 DP2

Panama

64.00 m

59.16 m

16.00 m

6.50 m

5.40 m

1125 mm

BV

I x HULL, MACH, Supply, FiFi 1, Sp Svc Stby

Res LHNS WS, Unres Nav, Dynapos AM/AT R

2300.00 T / 690.00 T

2304.85 T

580.00 m³

450.00 m³ / 600.00 m³

350.00 m³

350.00 m³ / 10.86 m³

600.00 m³

85.00 m³

170.00 m³ (4 x 42.5m³ per Tank)

80 m³/hr @ 60 m head, Desmi NSL80-265

80 m³/hr @ 60 m head, Itur ILNC50-200B

80 m³/ hr @ 60 m head, Itur ILNC50-200B

2 x 70 m³/hr @ 60 m head, Magnum 4x3x1

2 x 70 m³/hr @ 60 m head, Magnum 4x3x1

2 x 80 m³/hr @ 30 m head, Itur ILN040/160B

2 x 25 m³/hr @ 60 m head, Parson

Deep Weel Centrifugal

2 x 13 m³/min, Unslip, Airman,

5.6bar/6.5bar Pressure

2 x AC 14 high-holding power, 1440 kg

Nil

2 x Electro Hydraulic 9.4T @ 9 m/min

SWL 3 T @ 13 m radius (max SWL)

4 x 1, 6 x 2, 11 x 4 Berths

60

I x Hull x Mach, Supply Vsl FiFi Ship 1,

Special Svc, Standby Rescue, LHNS-

WS, Unrest’d Nav

2 x 1650 m³/h Capacity, 140 m

Throw Length

2 x 1650 m³/hr

8 x 25 men, SOLAS compliant

1 x 6 men, Inboard Eng, 50 L Fuel,

SOLAS Compliant

Nil

Optional, installed as required

500.00 m²

600.00 T

7.5 T/m²

13.5 Knots @ 9T/24 hrs

11 Knots @ 7T/ 24 hrs

2 x Niigata 6L28HX, 2500 BHP, 1838

kW, 750 RPM, Total 5000 BHP

3 x Baudouin 8M26.2, 473 kW @ 1500 RPM

Baudouin, 99 kW

2 x Leroy Somer LSAM 50.2, 900 kW

@ 1500 RPM

2 x Sperre HL2/77, 25 m³/hr, 30 bar max/pr

2 x NCG NCT165, 10 T Thrust

2 x Niigata Z-pellers ZP-41CP

2 x Niigata Z-pellers ZP-41CP

PRINCIPAL PARTICULARS

TANK CAPACITIES

CARGO DISCHARGE CAPACITIES

DECK EQUIPMENT

ACCOMMODATION

EXTERNAL FIRE-FIGHTING EQUIPMENT

LIFE-SAVING EQUIPMENT

DIVING & ROV SYSTEMS

DECK PARTICULARS

PERFORMANCE

PROPULSION SYSTEM

DP SYSTEM

www.meogroup.comwww.meogroup.com

20192019

VESSELSPECIFICATIONS

VESSELWORK HISTORY

END USER WORK LOCATION END DATE SCOPE OF WORK

ADNOC, Saudi Aramco, RAS Markaz Crude Oil Park, Technip

Kuwait, Oman, UAE, Kuwait, Oman, UAE, Saudi ArabiaSaudi Arabia

2019 DP2 geotechnical and geophysics survey operation support

Qatar Gas/Rosseti Marino/ADNOC, ARAMCO, KJO

Qatar, UAE, Saudi Arabia

2017 DP2 geotechnical survey operation support

Ras Gas Qatar 2017 DP2 drilling operations support

Dubai Petroleum and KJO UAE, Saudi Arabia 2016 DP2 drilling operations support

RasGas Offshore, Qatar 2016DP2 operations, offshore accommodations, walk-to-work crew access supply

Total E&P Al Shaheen Field Qatar 2016 DP2 survey and ROV operations

Qatar Petroleum Al Shaheen Field Qatar 2015 DP2 ROV and diving operations support

MOQ Al Shaheen Field Qatar 2015DP2, standby duties, crew transfers, supplies, stores and parts delivery, general assistance

Maersk Oil Qatar Al Shaheen Field Qatar 2015 DP2 operations

Total E&P Persian Gulf 2015SSurvey and ROV operations support, including placement of grout bags on sea floor

Saudi AramcoRastanura, Saudi

Arabia2014 DP2 operations for general offshore maintenance work

Vessel particulars are believed to be correct but are not guaranteed. Owners reserve the rights to amend the specifications without notification. Particulars are entirely without warranty as to correctiveness. Interested parties must inspect vessel’s certificates, drawings or conduct a physical inspection of vessel.

Page 3: MEO RANGER...DP2, Navis 4000 Series, 2 DPGS, Taut Wire SMT TW-1.0 System 300m depth, 1, 2 Anemometers, 2 Motion Sensors, Independent Joystick 2013 PT Loh & Loh Construction, Indonesia

Tel: +65 6545 6211 / 6829 6100 | Email: [email protected]

SPECIALISED VESSEL SERVICES www.meogroup.com

2019