Memo r t*,t,,* Jas Engineering PT. JAS AEFO.ENGINEERING SERVICES Terminal 2-D 252 Building SOEKARNO HATTA INT'L AIRPORT Cengl€reng 19130 INDONESIA Tel. :62.21.5501312 F ax'. 62.21 .5501312 Ref.No : 051-JAE/|V/15/QA Date :06MAY2015 To : LM Superintendant SRG,PLM,PDG,S0C,L0P,UPG,J0G,PKU,BPN From :ASST. QSM Copy :D0, QSM, MCC Subject : Malaysia Ait Asia Transit Check Clasification :AUDITFINDING Dear Sir, With regards to MAA audit recently, engineer on duty not performed linal walk around during his transit check and become a finding due toatthe same time he performed transit check Silk Air A319. I have jdentified the root cause, that enqineer donot aware that final walk atound should be done before airctaft pushback. Please follow airline procedure and allengineer are required lo comply to this Quality memo, Your cooperation ismuch appreciated. BudiSantoso Asst.QSM Regards, (l Y"T Page 1of 1

Upload: abu72

Post on 26-Sep-2015

216 views

Category:

Documents


1 download

TRANSCRIPT

  • Memor t*,t,,*Jas Engineering

    PT. JAS AEFO.ENGINEERING SERVICESTerminal 2-D 252 BuildingSOEKARNO HATTA INT'L AIRPORTCenglreng 19130 INDONESIA

    Tel. :62.21.5501312F ax'. 62.21 .5501312

    Ref.No : 051-JAE/|V/15/QADate :06MAY2015To : LM Superintendant SRG,PLM,PDG,S0C,L0P,UPG,J0G,PKU,BPN

    From :ASST. QSMCopy :D0, QSM, MCC

    Subject : Malaysia Ait Asia Transit CheckClasif ication :AUDITFINDING

    Dear Sir,

    With regards to MAA audit recently, engineer on duty not performed linal walk around during histransit check and become a finding due to at the same time he performed transit check Silk Air A319.

    I have jdentified the root cause, that enqineer do not aware that final walk atound should bedone before airctaft pushback.

    Please follow airline procedure and all engineer are required lo comply to this Quality memo,

    Your cooperation is much appreciated.

    BudiSantosoAsst.QSM

    Regards,

    (lY"T

    Page 1 of 1