Context: In October 2012 the Radison Blu Hotel in Frankfurt installed their first Melink Intelli-Hood system. Following the success of this project another 7 installations followed throughout Germany, Switzerland, Austria and Poland. Additional opportunities in the portfolio are being reviewed as a result of the energy savings being realized at the existing properties. There is an established and dedicated network throughout Europe to ensure project support from concept to completion for commercial kitchen operations. For more information, visit MELINKCORP.COM Hotel Retrofit October 2012 Intelli-Hood control system installed in Radison Blu Hotel in Frankfurt, Germany TOTAL ENERGY SAVINGS PER YEAR Estimated: €89,506 Actual: €118,158 1,453,563 kWh 67% PAYBACK Estimated: 1.28 years Actual: .97 years $ CO2 SAVINGS Estimated:370,093 kg Actual: 531,430 kg

Upload: craig-davis-ms-cpm-pmp

Post on 07-Aug-2015

11 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Melink_IntelliHood_Radisson_Blu_Frankfurt_Case Study

Context:In October 2012 the Radison Blu Hotel in Frankfurt installed their first Melink Intelli-Hood system. Following the success of this project another 7 installations followed throughout Germany, Switzerland, Austria and Poland. Additional opportunities in the portfolio are being reviewed as a result of the energy savings being realized at the existing properties. There is an established and dedicated network throughout Europe to ensure project support from concept to completion for commercial kitchen operations.

For more information, visit MELINKCORP.COM

Hotel RetrofitOctober 2012

Intelli-Hood control system installed in Radison Blu Hotel in Frankfurt, Germany

TOTAL ENERGY SAVINGS PER YEAREstimated: €89,506Actual: €118,1581,453,563 kWh67%

PAYBACKEstimated: 1.28 yearsActual: .97 years

$

CO2 SAVINGSEstimated:370,093 kgActual: 531,430 kg