May 15, 2009 Building Standards Code Update Project Mitigating the Consequences of Flooding Presentation to the Central Valley Flood Protection Board Ricardo Pineda, P.E., CFM, Floodplain Management Branch Chief Brian Walker, P.E., BSCUP Project Engineer

Upload: ita

Post on 13-Jan-2016

37 views

Category:

Documents


0 download

DESCRIPTION

Building Standards Code Update Project Mitigating the Consequences of Flooding Presentation to the Central Valley Flood Protection Board Ricardo Pineda, P.E., CFM, Floodplain Management Branch Chief Brian Walker, P.E., BSCUP Project Engineer. Meeting Objective & Agenda. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Meeting Objective & Agenda

May 15, 2009

Building Standards Code Update Project

Mitigating the Consequences of Flooding

Presentation to the Central Valley FloodProtection Board

Ricardo Pineda, P.E., CFM, Floodplain Management Branch ChiefBrian Walker, P.E., BSCUP Project Engineer

Page 2: Meeting Objective & Agenda

May 15, 2009

Meeting Objective & Agenda

• Purpose: To Provide the Board an Update on Project and Schedule

• Highlights of Building Standards Code Update Project (BSCUP)

• Schedule• NRA and CBSC Submittal Packages• Identify Next Steps

Page 3: Meeting Objective & Agenda

May 15, 2009

Health and Safety Code §50465

50465. (a) On or before January 1, 2009, the Department of Water Resources shall propose for adoption and approval by the California Building Standards Commission updated requirements to the California Building Standards Code for construction in areas protected by the facilities of the Central Valley Flood Protection Plan where flood levels are anticipated to exceed three feet for the 200-year flood event. The amendments to the California Building Standards Code shall be sufficient to reduce the risk of flood damage and protect life, safety, and the construction in those areas.

(b) Before the department proposes the amendments to the California Building Standards Code required pursuant to subdivision (a), the department shall consult with the Central Valley Flood Protection Board, the Division of the State Architect, and the Office of the State Fire Marshal.

Page 4: Meeting Objective & Agenda

May 15, 2009

Collaboration & Engagement

The DWR Building Code Team has Briefed and Obtained input from:

• Technical Advisory Committee (TAC) members in 5 Meetings

• FloodSAFE Executive Management Team 5 Times• Central Valley Flood Protection Board twice• The Public - 4 Workshops• Five State Agencies

Page 5: Meeting Objective & Agenda

May 15, 2009

Technical Advisory Committee (TAC) Participants

• CVFPB (Central Valley Flood Protection Board)

• DSA (Division of the State Architect) • SFM (Office of the State Fire Marshal) • HCD (Department of Housing and

Community Development)• BSC (Building Standards Commission) • SWRCB (State Water Resources Control

Board)• CBIA (California Building Industry

Association)• AIA (American Institute of Architects

California Council)• SEAOC (Structural Engineers Association

of California) • OSHPD (Office of Statewide Health

Planning and Development)

• FMA (Floodplain Management Association)

• USACE (U.S. Army Corps of Engineers)

• NFPC (National Flood Proofing Committee)

• NFIP (National Flood Insurance Program)

• MWH Consulting• PBS&J Consulting• IWC (Inter-West Consulting)• CSBC (City of Stockton Building

Division) • SJBD (San Joaquin Building

Department)• Other organizations and agencies

were contacted

Page 6: Meeting Objective & Agenda

May 15, 2009

BSCUP Highlights

•PROJECT DEVELOPMENT FLOW CHART (IN BRIEF)

•FLOOD THREATS TO PEOPLE

•OCCUPANCY GROUPS RELATED TO PEOPLE

•FINAL PROPOSED CODE UPDATE

Page 7: Meeting Objective & Agenda

May 15, 2009

Prioritization for 2009 Code Cycle

Page 8: Meeting Objective & Agenda

May 15, 2009

Flood Threats to People

• The proposed Code update for the upcoming Code cycle primarily increases public safety for persons who cannot or do not evacuate region prior to flood

• Future Code updates should address damage reduction of buildings more completely

Page 9: Meeting Objective & Agenda

May 15, 2009

Flood Threats to People (2)• Four “Chief Threats”

were previously identified to be addressed this Code cycle

• BC Team determined that #1 and #2 can be accomplished now

• Chief Threats #3 and #4 require significant coordination and input or research. Recommend addressing next cycle (from Process Flow

Chart)

4

3

2

1

Page 10: Meeting Objective & Agenda

May 15, 2009

Occupancy Groups Related to People• Building Occupancy Groups are selected to best address risk of vulnerable &

dependent persons. These groups are Educational, Residential & Institutional– Additional benefit to “average” homeowner in Residential buildings– DWR can expand scope in future Code cycles

• R-3 (& R-3.1) and E are the appropriate OGs to propose as Mandatory Code to address risk of vulnerable & dependent persons and maximize adoption of proposal to Code

(from Process Flow Chart)

Page 11: Meeting Objective & Agenda

May 15, 2009

What Types of Buildings are Included?

• Mandatory– Schools (Group E)– Single family homes (Group R-3)

– Residential care facilities with 6 or fewer clients (Group R-3.1)

• Voluntary– Medical, care facilities, and assisted living facilities (Group I)– Remainder of Group R, such as hotels and apartments

Page 12: Meeting Objective & Agenda

May 15, 2009

2009 Proposed Code Update

• The proposal, if adopted, will minimize likely and mortal danger to persons who otherwise may not have a Flood Evacuation Location

• The Flood Evacuation Location requirements are:– Designed to allow flexibility and creativity (see examples)– Appropriately restrictive (e.g. minimum sizing, egress, etc)– Consistent with existing Code requirements regarding

accessibility (i.e., ADA) requirements– Cost Conscious

Page 13: Meeting Objective & Agenda

May 15, 2009

Example 1 Single Story Residential with Five Options, Depending on Flood Water Depth. (There is only 1 Water Depth at a Particular Site) WSEL

200

“WSEL200” represents the Water Surface Elevationfor the “200-year” FloodEvent. Design Options Available will Always depend on Flood Depth.

Page 14: Meeting Objective & Agenda

May 15, 2009

Example 2Evacuation Location on

Residential Roofs or Attics

Page 15: Meeting Objective & Agenda

May 15, 2009

Example 3: Use FEMA/NFIP Approach

“Elevate” one-story home above a garage or storage space. Technically, this is a two-story.

This approach is required if in the FEMA mapped 100-year floodplain

Significantly minimizes threat to persons (who could not evacuate region & had to be home) and home damage.

Page 16: Meeting Objective & Agenda

May 15, 2009

Example 4 The owner may feel more comfortable evacuating to a flat terrace or balcony than on rooftop or in attic. This rooftop Evacuation Location can often serve as amenity.

Page 17: Meeting Objective & Agenda

May 15, 2009

Example 5:If a Single-Story is Desired but it Would

Be Fully InundatedIf local Building Official and other necessary officials (e.g., RD or LD manager) sign off on Alternate Means of Protection plan offered by Owner/Developer of a Single-Story Planned Community, for example, then a Multi-Story Community Center may serve as the Evacuation Location.

Some Considerations:

•Planned Community is Not Close to Levee

•Homes are Close to Community Center

•Robust Hazard (Flood) Warning System in Place

Page 18: Meeting Objective & Agenda

May 15, 2009

Example 6

Page 19: Meeting Objective & Agenda

May 15, 2009

Schedule

Must Submit toCBSC by

July 1, 2009

Page 20: Meeting Objective & Agenda

May 15, 2009

SCHEDULE - BUILDING STANDARDS CODE UPDATED PROJECTACTIVITY START DATE FINISH DATE

1A. DWR Executive Management Team (EMT) Review Monday, May 11 Monday, May 18

1B. Present to CV Board Friday, May 15 Friday, May 15

1C. Incorporate EMT & CV Board Comments Monday, May 18 Tuesday, May 19

2. Obtain Director’s Signature (Director’s Memo) Tuesday, May 19 Tuesday, May 19

3A. Code Proposal Package to NRA with Review Wednesday, May 20 Tuesday, June 9

3B. Code Proposal Package to CBSC for Advance Courtesy Review; 2 Week Review

Wednesday, May 27 Tuesday, June 9

4. Incorporate NRA and CBSC Comments Wednesday, June 10 Tuesday, June 16

5. Finalize Package (Signatures and Copies) Wednesday, June 17 Friday, June 19

6. SUBMIT PACKAGE TO CBSC Monday, June 22

CBSC CODE CYCLE SUBMITTAL DEADLINE WEDNESDAY, JULY 1

The CBSC 2009 Annual Code Adoption Cycle Begins July 1, 2009.

Proposals that are Adopted Become Effective January 1, 2011.

Page 21: Meeting Objective & Agenda

May 15, 2009

Natural Resource Agency (NRA)&

California Building Standards Commission

(CBSC)Submittal Packages

Page 22: Meeting Objective & Agenda

May 15, 2009

NRA & CBSC Submittal PackagesThe Submittal Packages are Identical and Include:• DWR Director’s Decision Memo• Proposed Code Update (“Express Terms”), 3 Parts (by

Occupancy Group)• Narrative Document to Explain Code• “Initial Statement of Reasons”• “9-Point Criteria”• Supporting Documentation:

– Example Illustrations of Buildings Meeting Proposed Requirements

Page 23: Meeting Objective & Agenda

May 15, 2009

Next Steps

The BC Team to Submit Packages to:– NRA on Wednesday, May 20th

– CBSC by May 27th (Courtesy Review)– CBSC by June 30th (Official Submittal)

Beginning July 1, 2009, the BC Team Continues Carrying Proposal in the CBSC Code Adoption Cycle.

Page 24: Meeting Objective & Agenda

May 15, 2009

Questions or Comments?

For more information:

http://www.water.ca.gov/floodsafe

http://www.water.ca.gov/BuildingCodeUpdate

Page 25: Meeting Objective & Agenda

May 15, 2009

Mitigating the Consequences of Flooding

California Building Standards Code Update Project

THANK YOU