medupi fgd open spray tower - zitholele
TRANSCRIPT
Medupi FGD Open Spray Tower
ELP
ELPMH
ELPELP
MH
MH
ELP
ELP
ELP
ELP
MH
900.0
ELP
900.533
PC 131
TP
ELP
MH
ELP
ELP
ELP
MH
ELP
MH
ELP
MH
RUIN
RUIN
ELP
ELP
ELPMH
902.
5
ELPMH
TP
ELP
TP
ELPTOWER
ELP
MH
MH
TP
MH
ELP
MH
RUIN
ELP
MH
ELP
MH
MH
MH
ELP
ELP
ELP
MH
ELP
MH
ELP
CONCRETE
905.0
905.0
905.0
905.0
ELP
ELP
TP
MH
MH
ELP
S
ELP
S
ELP
ELP
ELP
ELP
S
ELP
ELP
ELP
ELP
TP
MH
ELP
MH
ELP
ELP
ELP
MH
SS
ELP
ELP
TOWER
906.055
ELP
ELP
ELP
ELP
ELP
ELP
MH
ELP
ELP
ELP
ELP
ELPELP
S
ELP
MH
ELP
ELP
ELP
ELP
ELP
ELP
MH
ELP
TP
ELP
ELP
ELP
ELP
ELP
ELP 907.5
907.5
907.
5
907.5
ELP
ELP
ELP
ELP
ELP
ELP
ELP
ELP
TP
908.2
ELP
ELP
ELP
ELP
ELP
ELP
ELP
ELP
ELP
ELP
ELP
ELP
TP
ELP
ELP
ELP
ELP
ELP
ELP
ELP
ELP
ELP
ELP
ELP
ELP
ELPELP
910.
0
910.0
910.0
910.
0
ELP
ELP
TP
ELP
ELP
ELP
ELP
S
ELPELP
ELP
ELP
ELP
ELP
ELP
ELP
ELP
ELPELP
ELP
ELP
ELP
ELP
ELP
TP
S
S
S
TP
TP
S
912.
5
912.5
912.5
TP
TP
TP
TP
S
S
S
TP
TP
TP
Y= -56
645.36
5
X= 262
3268.577
Y= -56598.168
X= 2623311.872
Y= -56600.244
X= 2623294.444
Y= -56841.943
X= 2623478.684
Y= -56836.518
X= 2623460.945
Y= -56795.516
X= 2623492.882
ca
mera
mast
foundations
Y= -55429.449
X= 2623203.041
Y= -56519.170
X= 2623240.013
Y= -56548.569
X= 2623305.961
Y= -56550.645
X= 2623288.534
Y= -55454.751
X= 2623256.457
Y= -55457.525
X= 2623239.12
7
Y= -55506.847
X= 2623247.023
Y= -55504.073
X= 2623264.353
Y= -56
637.72
6
X= 262
3303.337
Y= -56
649.67
3
X= 262
3304.552
Y= -56
651.187
X= 262
3289.665
Y= -56
653.144
X= 262
3270.416
Y= -56548.320
X= 2623232.846
Y= -55399.187
X= 2624381.135
Y= -55524.008
X= 2624211.342
Y= -56433.724
X= 2623222.962
Y= -56984.275
X= 2623350.139
Y= -56964.845
X= 2623406.14
5
Y= -56971.7
17
X= 2623400.614
Y= -56974.978
X= 2623373.258
Y= -56988.997
X= 2623344.788
Y= -56475.233
X= 2623284.858
Y= -56451.335
X= 2623274.374
Y= -56487.443
X= 2623298.518
Y= -56449.557
X= 2623240.386
Y= -56578.850
X= 2623285.727
TP
ASH
DUMP S
UB
Y= -55516.727
X= 2623254.841
Y= -56957.022
X= 2623347.753
Y= -55462.713
X= 2624389.063
Y= -55475.658
X= 2624371.749
Y= -56589.276
X= 2623286.969
Y= -56598.996
X= 2623288.12
7
Y= -56572.892
X= 2623285.017
Y= -56568.315
X= 2623284.471
T.O.C. +5.450
GROU
ND F
LOOR
T.O.C. +2.900
BASE
MENT
T.O.C. -0.480
GROU
ND F
LOOR
T.O.C. -3.030
BASE
MENT
Y= -56135.625
X= 2623253.873
Y= -56127.830
X= 2623319.290
Y= -56155.854
X= 2623256.992
Y= -55456.551
X= 2624425.923
Y= -55457.221
X= 2624398.312
Y= -55436.399
X= 2624382.741
Y= -55483.213
X= 2624363.556
Y= -55462.391
X= 2624347.985
Y= -55483.520
X= 2624363.511
Y= -55462.346
X= 2624347.677
Y= -55436.091
X= 2624382.786
Y= -55457.265
X= 2624398.620
KKS
CODE
0 5U
BS08
Y= -55461.2
03
X= 2624400.035
Y= -55468.402
X= 2624405.418
Y= -55485.990
X= 2624366.888 Y= -55493.190
X= 2624372.272
TH9-10
TH9-9
TH9-5B
TH9-6
TH9-7
TH9-4
Y= -56566.608
X= 2623273.072
Y= -55612.810
X= 2623249.467
Y= -56503.253
X= 2623289.390
Y= -56510.181
X= 2623285.390
Y= -56964.371
X= 2623377.382
Y= -55611.5
89
X= 2623265.091
Y= -56547.420
X= 2623231.287
Y= -56096.895
X= 2623398.672
Y= -56071.8
34
X= 2623413.14
1
Y= -56787.178
X= 2623496.090
Y= -56786.891
X= 2623496.17
9
Y= -56756.443
X= 2623397.206
Y= -56750.731
X= 2623376.598
Y= -56763.718
X= 2623336.15
5
Y= -56791.4
94
X= 2623510.12
1
Y= -56801.0
52
X= 2623507.18
1
BF
O
OFFL
OA
D
PU
MPST
ATI
ON
Y= -55464.388
X= 2624391.486
Y= -55479.890
X= 2624373.237
Y= -55522.526
X= 2623263.945
Y= -55406.445
X= 2624387.063
Y= -55446.815
X= 2624417.252
Y= -55449.480
X= 2624435.724
Y= -55466.134
X= 2624448.17
8
Y= -55533.565
X= 2624358.009
Y= -55516.910
X= 2624345.554
Y= -55498.438
X= 2624348.220
Y= -55458.069
X= 2624318.031
KKS
CODE
04UB
S10
KKS
CODE
05UG
A10
Y= -55521.7
91
X= 2623223.206
Y= -55488.972
X= 2623219.295
Y= -55515.581
X= 2623261.998
COAL STOCKYARD
SUBSTATION SOUTH
GATE HOUSE
(TEMPORARY)
BF
O
OFFL
OA
D
SUBST
ATI
ON
TO THABAZIMBI TO GROOTGELUK MINERUNAWAY SET
LOCO SHED
GYPSUM LOADING FACILITY
LIMESTONE UNLOADING FACILITY
GYPSUM DEPARTURE LINE
GYPSUM ARRIVALS LINE
LOCO RUN-AROUND
LIMESTONE DEPARTURE LINE
LIMESTONE ARRIVALS LINE
LIMESTONE UNLOADING LINE
3
4
6
7
8
10 11
13
SBF
RUNAWAY SET2
RUN-OFF LINE
SHUNTING NECK
1
5
9
12
NOT-TO-GO LINE
SHUNTING NECK
UP
DISP
ENSING F
ACILI
TY
FUEL STO
RAGE
AND
AREA PRO
VIDED
FOR
1:9
TAN
GENT
C M
C M
INSP
ECTIO
N W
ALKWAYS
BETWEEN
TRACKS
RUNAWAY
SET
IBJ
1:9 T
AN
GE
NT
1:9
TAN
GENT
1:9
TAN
GENT
SHUNTING N
ECK
LOCO S
HED
C M
C M
HAYES D
ERAILE
R
HAYES D
ERAILE
R
C M
X = 262
4600
X = 262
4600
X = 262
4400
X = 262
4400
X = 262
4200
X = 262
4200
X = 262
4200
X = 262
4200
X = 262
4200
X = 262
4200
X = 262
4000
X = 262
4000
X = 262
3800
X = 262
3800
X = 262
3600
X = 262
3600
X = 262
3400
X = 262
3400
X = 262
3200
X = 262
3200
X = 262
3000
X = 262
3000
X = 262
2800
X = 262
2800
Y = -54400
Y = -54400
Y = -54600
Y = -54600
Y = -54800
Y = -54800
Y = -55000
Y = -55000
Y = -55200
Y = -55200
Y = -55400
Y = -55400
Y = -55600
Y = -55600
Y = -55800
Y = -55800
Y = -56000
Y = -56000
Y = -56200
Y = -56200
Y = -56400
Y = -56400
Y = -56600
Y = -56600
Y = -56800
Y = -56800
Y = -57000Y = -57000
1:9
TAN
GENT
1:12 T
AN
GE
NT
TO G
ROOTG
ELUK MIN
E
EXISTI
NG R
AILW
AY LI
NE
TO T
HABAZIM
BI
LIM
ESTO
NE UNLO
ADING LIN
E
LIM
ESTO
NE ARRI
VALS LIN
E
LIM
ESTO
NE DEP
ARTURE LI
NE
LIM
ESTO
NE UNLO
ADING F
ACILI
TY
C M
C M
WAG
ON
POSI
TIO
NER
WEI
GHBRI
DGE
GYPS
UM L
OADI
NG F
ACILI
TY
WEI
GHBRI
DGE
812
m C
LEAR
TO L
OADI
NG F
ACILI
TY (50 C
AR TYPE
WAG
ONS)
PROPO
SED ADM
INIS
TRATIO
N BUI
LDING
NOT-
TO-G
O LIN
E
PROPO
SED SECURI
TY PO
ST
515
m C
LEAR
TO E
DGE
UNLOADI
NG F
ACILI
TY (30
CAR-3
TYPE W
AGO
NS)
577
m C
LEAR
TO S
RJ (3
0 CAR-
3 TYPE
WAG
ONS)
1110 m C
LEAR
(60
CAR-3
TYPE W
AGO
NS + 6
LOCO
MOTI
VES)
738
m C
LEAR
TO S
TOP
BLOCK
(30
CAR-3
TYPE W
AGO
NS + 6
LOCO
MOTI
VES)
INSP
ECTIO
N W
ALKWAYS
BETWEEN
TRACKS
INSP
ECTIO
N W
ALKWAYS
BETWEEN
TRACKS
1:9
TANGENT
C M
C M
C M
C M
1:9
TANGENT
1:9
TAN
GENT
1:9 TANGENT
1:9
TAN
GENT
1:9
TANGENT
RUN-OFF LIN
E
1011 m C
LEAR
(60
CAR-3
TYPE W
AGO
NS+ 6 L
OCO
MOTI
VES)
1:9
TANGENT
1:9
TANGENT
SB
LOCO R
UN-ARO
UND
GYPS
UM A
RRIVALS
LIN
EG
YPSUM D
EPARTURE
LINE
C M
830
m C
LEAR
(50
CAR TYPE
WAG
ONS
+ 3
LOCO
MOTI
VES)
IBJ
1:9
TAN
GENT
C M
SHUNTING N
ECK
500
m C
LEAR
TO S
RJ (3
0 CAR-
3 TYPE
WAG
ONS
+ 2
LOCO
MOTI
VES)
f: +27 (0)11 886 7792
t: +27 (0)11 886 6951
2125
Randburg
PO Box 858
R&H Rail (Pty) Ltd
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
R
A
B
C
D
E
F
G
H
J
K
L
M
N
P
R
A0L
Q
Q
DRAWING CLASSIFICATION: CONTROLLED DISCLOSURE
SHTESKOM DRAWING NO
CONTRACTOR DRAWING NO
BY
REV
APP
KKS
SCALE
BY
AUTHREFERENCE DRAWINGS
REVISION BY
APP
D.O. REV DATE
REV
2002/015527/06
REG NO.
ESKOM HOLDINGS LTD.
BY
CHKD
APPROVED BY:
CREATED BY:
CHECKED BY:
AUTHORISED FOR ESKOM BY:
CODIFICATION BY:
SPF CODE
PBS PATH
RAILWAY YARD
.
GENERAL ARRANGEMENT
MEDUPI POWER STATION
5171-100-002-G010
01 0SHOWN
LEON ONVERWACHT
.
20030241
.
. .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
DAVE J. HEWSON
.
.
CONCEPT LAYOUT 1
0.84/40134
DIAGRAMMATIC LAYOUT
GENERAL LAYOUTSCALE 1:2000
IBJ
C M
LIGHTING POLES
PROPOSED SECURITY FENCE
SEWER SEPTIC TANK
STORMWATER
FIRE WATER
POTABLE WATER
STOP BLOCK
CLEARANCE MARKER
RAILWAY SIGN BOARD
RAILWAY SIGNAL
INSULATED BLOCK JOINT
RAILWAY LINE
LEGEND:
1.1. DO NOT SCALE DRAWING. USE PLAN DIMENSIONS ONLY
1.2. THIS DRAWING SHALL NOT BE USED FOR CONSTRUCTION PURPOSE UNTIL ENDORSED
"ISSUED FOR CONSTRUCTION" AND SIGNED BY A DIRECTOR OF R&H RAIL (Pty) Ltd.
2.1. TRACK STANDARDS SHALL BE THOSE APPLICABLE TO PRIVATE SIDINGS.
2.2.
2.3. TRACK CENTRES 8m.
3.1.1.A FULL 60 WAGON LIMESTONE TRAIN ENTERS THE YARD ALONG LINE 1 AND
PROCEEDS VIA LINE 8 TO LINE 11, DETACHING THE BACK 30 WAGONS TO REMAIN ON
LINE 8.
3.1.2.THE FORWARD 30 WAGONS ON LINE 11 ARE PUSHED BACK TO ENGAGE WITH THE
TIPPLER AND THE LOCO UNCOUPLES TO MOVE VIA LINES 12, 13 AND 6 TO ATTACH TO 60
EMPTY WAGONS ON LINE 7 THAT WERE UNLOADED DURING THE PREVIOUS
OPERATION.
3.1.3.ON RECEIVING PERMISSION TO PROCEED, THE TRAIN OF EMPTY WAGONS DEPARTS
FROM LINE 7.
3.1.4.THE 30 FULL WAGONS ON LINE 11 ARE UNLOADED, THE EMPTIES PUSHED FORWARD
TO LINE 10.
3.1.5.THE SHUNTING LOCOMOTIVE PROCEEDS FROM IT'S SHED TO LINE 8, AND PULLS THE
30 FULL WAGONS THEREON TO LINE 11, AND THEN PUSHES BACK FOR THE WAGONS TO
ENGAGE WITH THE INDEXER.
3.1.6.THE SHUNTING LOCOMOTIVE MOVES OVER LINES 12, 13 AND 6 TO LINE 10 AND MOVES 30
EMPTY WAGONS AT A TIME TO FORM A 60 WAGON TRAIN ON LINE 7.
3.1.7.THEREAFTER THE SHUNTING LOCOMOTIVE MOVES BACK TO THE SHED TO BE
SECURED.
3.1.8.THE PROCESS IS REPEATED ON ARRIVAL OF THE NEXT FULL TRAIN.
3.2.1.A TRAIN OF 50 EMPTY WAGONS IS PULLED ONTO LINE 4, THE LOCOMOTIVE DETACHES
AND MOVES OVER LINES 5 AND 6 TO LINE 3 WHERE IT COUPLES TO A RAKE OF 50 LOADED
WAGONS LOADED DURING THE PREVIOUS OPERATION.
3.2.2.ONCE THE NECESSARY AIR BRAKE TEST AND WAGON INSPECTION IS CONCLUDED AND
AUTHORIZED TO DO SO THE TRAIN DEPARTS THE SIDING.
3.2.3.THE SHUNTING LOCOMOTIVE MOVES FROM THE SHED OVER LINE 13 TO LINE 4 VIA LINE 5
AND SEQUENTIALLY MOVES A MAXIMUM OF 10 WAGONS TO LINE 13, THE WAGONS ARE
LOADED AS THEY MOVE UNDER THE LOADING FACILITY.
3.2.4.THE LOADED WAGONS ARE THEN PUSHED TO LINE 3 TO FORM A 50 WAGON SET.
1. GENERAL NOTES
2. TECHNICAL NOTES
3. TRAIN OPERATION
3.1. LIMESTONE UNLOADING
3.2. FGD GYPSUM (PROVISIONAL)