7/18/2019 MED_Maps
http://slidepdf.com/reader/full/medmaps 1/11
Transport
MediterraneanCompliance MapsTENtec Reporting
7/18/2019 MED_Maps
http://slidepdf.com/reader/full/medmaps 2/11
The individual visualised corridor maps show the current state of data encoding in the TENtecsystem by the contractors of each corridor study. The European Commission does not guarantee
the accuracy of the data included in these maps.
DECEMBER 2014
7/18/2019 MED_Maps
http://slidepdf.com/reader/full/medmaps 3/11
The TEN-T Core Network Corridors
MEDITERRANEAN
CORRIDOR
TRANSPORT MODE: AirportsPARAMETER: Connection with RailYEAR: 2014
MEDITERRANEAN CORRIDOR
YES:NO:Obligation to connect to rail by 2050: *
Planned/underconstr.:
Urban node:
7/18/2019 MED_Maps
http://slidepdf.com/reader/full/medmaps 4/11
The TEN-T Core Network Corridors
MEDITERRANEAN
CORRIDOR
TRANSPORT MODE: Inland WaterwaysPARAMETER: CEMT ClassYEAR: 2014
MEDITERRANEAN CORRIDOR
IV:Va/Vb:
Vla; Vlb; Vlc:VII:
Urban node:
7/18/2019 MED_Maps
http://slidepdf.com/reader/full/medmaps 5/11
The TEN-T Core Network Corridors
MEDITERRANEAN
CORRIDOR
TRANSPORT MODE: PortsPARAMETER: Connection with RailYEAR: 2014
YES:NO:
MEDITERRANEAN CORRIDOR
iww: Planned/underconstr.:Urban node:
7/18/2019 MED_Maps
http://slidepdf.com/reader/full/medmaps 6/11
The TEN-T Core Network Corridors
MEDITERRANEAN
CORRIDOR
TRANSPORT MODE: PortsPARAMETER: Road Connection (no. of lanes)YEAR: 2014
0-2:3-4:
5-6:7-30:
MEDITERRANEAN CORRIDOR
iww:Urban node:
7/18/2019 MED_Maps
http://slidepdf.com/reader/full/medmaps 7/11
The TEN-T Core Network Corridors
MEDITERRANEAN
CORRIDOR
TRANSPORT MODE: RailwaysPARAMETER: Max Axle load (tonnes)YEAR: 2014
MEDITERRANEAN CORRIDOR
≥ 22.50 tonnes:
< 22.50 tonnes:Planned/underconstr.:
Urban node:
7/18/2019 MED_Maps
http://slidepdf.com/reader/full/medmaps 8/11
The TEN-T Core Network Corridors
MEDITERRANEAN
CORRIDOR
TRANSPORT MODE: RailwaysPARAMETER: ERTMS in OperationYEAR: 2014
MEDITERRANEAN CORRIDOR
Operation NO:Operation YES:
Planned/underconstr.:
Urban node:
7/18/2019 MED_Maps
http://slidepdf.com/reader/full/medmaps 9/11
The TEN-T Core Network Corridors
MEDITERRANEAN
CORRIDOR
TRANSPORT MODE: RailwaysPARAMETER: TractionYEAR: 2014
MEDITERRANEAN CORRIDOR
Diesel:Electrifed:
Unselected:
Planned/underconstr.:
Urban node:
7/18/2019 MED_Maps
http://slidepdf.com/reader/full/medmaps 10/11
The TEN-T Core Network Corridors
MEDITERRANEAN
CORRIDOR
TRANSPORT MODE: RailwaysPARAMETER: Maximum Train Length (m)YEAR: 2014
MEDITERRANEAN CORRIDOR
≥ 740 m:
< 740 m:Planned/underconstr.:
Urban node:
7/18/2019 MED_Maps
http://slidepdf.com/reader/full/medmaps 11/11
Contact details:
European Commission – Directorate General for Mobility and Transport
Directorate B – European Mobility Network
Unit B1 – Trans European Network
http://ec.europa.eu/transport/index_en.htm
email: [email protected]
Ofces:
Rue Demot 28
1049 Brussels Belgium
P u b l i c a t i on d a t e: D e c em b er 2 0 1 4
D e s i gn & L a
y o u t b yT E N t e c
DECEMBER 2014