Transport 

MediterraneanCompliance MapsTENtec Reporting

7/18/2019 MED_Maps

http://slidepdf.com/reader/full/medmaps 2/11

The individual visualised corridor maps show the current state of data encoding in the TENtecsystem by the contractors of each corridor study. The European Commission does not guarantee

the accuracy of the data included in these maps.

DECEMBER 2014

7/18/2019 MED_Maps

http://slidepdf.com/reader/full/medmaps 3/11

The TEN-T Core Network Corridors

MEDITERRANEAN

CORRIDOR

TRANSPORT MODE: AirportsPARAMETER: Connection with RailYEAR: 2014

MEDITERRANEAN CORRIDOR

YES:NO:Obligation to connect to rail by 2050: *

Planned/underconstr.:

Urban node:

7/18/2019 MED_Maps

http://slidepdf.com/reader/full/medmaps 4/11

The TEN-T Core Network Corridors

MEDITERRANEAN

CORRIDOR

TRANSPORT MODE: Inland WaterwaysPARAMETER: CEMT ClassYEAR: 2014

MEDITERRANEAN CORRIDOR

IV:Va/Vb:

Vla; Vlb; Vlc:VII:

Urban node:

7/18/2019 MED_Maps

http://slidepdf.com/reader/full/medmaps 5/11

The TEN-T Core Network Corridors

MEDITERRANEAN

CORRIDOR

TRANSPORT MODE: PortsPARAMETER: Connection with RailYEAR: 2014

YES:NO:

MEDITERRANEAN CORRIDOR

iww: Planned/underconstr.:Urban node:

7/18/2019 MED_Maps

http://slidepdf.com/reader/full/medmaps 6/11

The TEN-T Core Network Corridors

MEDITERRANEAN

CORRIDOR

TRANSPORT MODE: PortsPARAMETER: Road Connection (no. of lanes)YEAR: 2014

0-2:3-4:

5-6:7-30:

MEDITERRANEAN CORRIDOR

iww:Urban node:

7/18/2019 MED_Maps

http://slidepdf.com/reader/full/medmaps 7/11

The TEN-T Core Network Corridors

MEDITERRANEAN

CORRIDOR

TRANSPORT MODE: RailwaysPARAMETER: Max Axle load (tonnes)YEAR: 2014

MEDITERRANEAN CORRIDOR

≥ 22.50 tonnes:

< 22.50 tonnes:Planned/underconstr.:

Urban node:

7/18/2019 MED_Maps

http://slidepdf.com/reader/full/medmaps 8/11

The TEN-T Core Network Corridors

MEDITERRANEAN

CORRIDOR

TRANSPORT MODE: RailwaysPARAMETER: ERTMS in OperationYEAR: 2014

MEDITERRANEAN CORRIDOR

Operation NO:Operation YES:

Planned/underconstr.:

Urban node:

7/18/2019 MED_Maps

http://slidepdf.com/reader/full/medmaps 9/11

The TEN-T Core Network Corridors

MEDITERRANEAN

CORRIDOR

TRANSPORT MODE: RailwaysPARAMETER: TractionYEAR: 2014

MEDITERRANEAN CORRIDOR

Diesel:Electrifed:

Unselected:

Planned/underconstr.:

Urban node:

7/18/2019 MED_Maps

http://slidepdf.com/reader/full/medmaps 10/11

The TEN-T Core Network Corridors

MEDITERRANEAN

CORRIDOR

TRANSPORT MODE: RailwaysPARAMETER: Maximum Train Length (m)YEAR: 2014

MEDITERRANEAN CORRIDOR

≥ 740 m:

< 740 m:Planned/underconstr.:

Urban node:

7/18/2019 MED_Maps

http://slidepdf.com/reader/full/medmaps 11/11

Contact details:

European Commission – Directorate General for Mobility and Transport

Directorate B – European Mobility Network

Unit B1 – Trans European Network

http://ec.europa.eu/transport/index_en.htm

email: [email protected]

Ofces:

Rue Demot 28

1049 Brussels Belgium

P  u b l  i   c  a t i   on d  a t  e: D e c  em b  er 2  0 1 4 

D e s i   gn & L  a

 y o u t  b  yT E N t    e c 

DECEMBER 2014