MEDITE IRELAND, REDMONDSTOWN, CLONMEL, CO. TIPPERARY IPPC LICENCE NO. P002704 MONITORING BOREHOLE DRILLING (AGW7 & AGW8) Innovation Centre Green Road Carlow Tel:- 059 91 33084 Fax:- 059 91 40499 Email:- [email protected] Integrated Engineering Consulting An Associate Company of VA Consulting & Geotechnical & Environmental Services Ltd ie IE CONSULTING WATER-ENVIRONMENTAL-CIVIL For inspection purposes only. Consent of copyright owner required for any other use. EPA Export 18-04-2016:01:31:10

Upload: lykhue

Post on 29-Sep-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

MEDITE IRELAND, REDMONDSTOWN, CLONMEL, CO. TIPPERARY 

IPPC LICENCE NO. P0027‐04 

MONITORING BOREHOLE DRILLING (AGW7 & AGW8) 

Innovation CentreGreen Road Carlow Tel:- 059 91 33084 Fax:- 059 91 40499 Email:- [email protected]

Integrated Engineering Consulting

An Associate Company of VA Consulting & Geotechnical & Environmental Services Ltd

ieIE CONSULTING

WATER-ENVIRONMENTAL-CIVIL

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 18-04-2016:01:31:10

Medite Europe Ltd. Page 2 of 6 IE 1054 – Monitoring Boreholes AGW7 & AGW8

ieIE CONSULTING

WATER-ENVIRONMENTAL-CIVIL IE Consulting                    Innovation Centre                   Green Road                   Carlow

MEDITE IRELAND, REDMONDSTOWN, CLONMEL, CO. TIPPERARY 

IPPC LICENCE NO. P0027‐04 

MONITORING BOREHOLE DRILLING (AGW7 & AGW8) 

Client :‐ Medite Ireland,         Report No:    IE1116‐1590 Redmondstown,        Issue No:    01‐ISSUE Clonmel,          Project No:    IE1054 Co. Tipperary.             Date:      17th February 2016              Revision:    1.0  

Prepared By:  A Whelan BSc (Hons), PDip (Environmental Hydrogeology) 

               Checked By:    J Keohane BSc, MSc, FCIWEM,  

C.Geol, C. WEM, MIEI   

Copyright © IE Consulting 2016

This report or its contents must not be reproduced for any purpose without written permission.

It is to be used only for the purpose for which it is supplied

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 18-04-2016:01:31:10

Medite Europe Ltd. Page 3 of 6 IE 1054 – Monitoring Boreholes AGW7 & AGW8

ieIE CONSULTING

WATER-ENVIRONMENTAL-CIVIL

Table of Contents 

1  INTRODUCTION .............................................................................................................................. 4 

2  BOREHOLE LOCATIONS .................................................................................................................. 4 

3  BOREHOLE DESIGN & INSTALLATION ............................................................................................ 4 

4  HEADWORKS .................................................................................................................................. 5 

5  WATER LEVEL MEASUREMENTS .................................................................................................... 5 

6  REFERENCES ................................................................................................................................... 6 

   

Appendix A    Drawing No. IE1054‐003‐A 

Appendix B  Borehole Logs 

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 18-04-2016:01:31:10

Medite Europe Ltd. Page 4 of 6 IE 1054 – Monitoring Boreholes AGW7 & AGW8

ieIE CONSULTING

WATER-ENVIRONMENTAL-CIVIL

1 INTRODUCTION 

IE  Consulting  was  engaged  by  Medite  Europe  Ltd.  to  oversee  the  design  and  drilling  of  two 

additional  monitoring  boreholes  at  their  site  at  Redmondstown,  Clonmel,  Co.  Tipperary 

(IPPC Licence No. P0027‐04).   Following a review of the existing groundwater monitoring network 

(IE  Consulting,  April  2014)  the  requirement  for  additional monitoring  boreholes was  identified. 

Proposals  to  drill  two  monitoring  boreholes  (AGW7  and  AGW8)  were  submitted  to  the 

Environmental  Protection  Agency  and  approved.  The  monitoring  boreholes  were  installed  in 

January 2016.  This report provides details of the design, drilling and completion of the monitoring 

boreholes.  

2 BOREHOLE LOCATIONS 

The  borehole  locations,  as  agreed  with  the  Agency,  are  shown  in  Drawing  No.  IE1054‐003‐A 

(Appendix  A).    The  position  and  elevation  of  the  boreholes,  as  shown  in  Table  1  below, were 

surveyed in by Capital Surveys on 5/2/16. 

BH ID  Position (ITM) Elevation Ground Level at Borehole 

(m OD) 

Elevation Water Level Datum 

(top pvc casing) (m OD) 

AGW7  E623962.9 N624044.8  22.974  22.939 

AGW8  E624037.7 N624102.9  23.105  23.103 

Table 1. Survey Details for AGW7 & AGW8 

 

3 BOREHOLE DESIGN & INSTALLATION 

Petersen  Drilling  Services  Ltd.  was  engaged  to  undertake  the  drilling  and  the  works  were 

supervised by a hydrogeologist from IE Consulting.  

The boreholes were drilled and installed on 5th ‐ 7th January 2016.  

Drilling  in  the overburden was undertaken with a dual drive  system with  casing of 150 mm OD 

(outer diameter) and drilling in the bedrock was undertaken open hole at 120 mm diameter. 

 

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 18-04-2016:01:31:10

Medite Europe Ltd. Page 5 of 6 IE 1054 – Monitoring Boreholes AGW7 & AGW8

ieIE CONSULTING

WATER-ENVIRONMENTAL-CIVIL 

Both boreholes were finished at 52 mm ID. AGW7 was drilled to a total depth of 15.4 m and AGW8 

was  drilled  to  a  total  depth  of  15.7 m.  Both  boreholes  are  screened  in  the  upper, weathered 

bedrock zone. Detailed borehole logs are provided in Appendix B.  

 

4 HEADWORKS 

The headworks for both boreholes were completed flush with ground level as both are located in 

areas of traffic movement. 

 

5 WATER LEVEL MEASUREMENTS  

A round of water  level measurements was taken from the existing monitoring boreholes and the 

new  boreholes  AGW7  and  AGW8  on  29/1/2016.    The water  levels were  reduced  to Ordnance 

Datum (Malin). The measurements are provided in Table 2 below. 

 

BH ID Description Water 

Level Datum 

Elevation Water Level Datum   

(m OD) 

Water Level  (m below datum) 

Reduced  Water Level (m OD) 

AGW1  Top of steel casing  19.269  10.37  8.899 

AGW2  Top of steel casing  18.385  13.33  5.055 

AGW3  Top of steel casing  43.697  23.65  20.047 

AGW4  Top of steel casing  30.264  2.77  27.494 

AGW5  Top of steel casing  33.289  Flowing artesian  Flowing artesian 

AGW6  Top of steel casing  22.011  Flowing artesian  Flowing artesian 

AGW7  Top of PVC casing  22.939  3.43  19.509 

AGW8  Top of PVC casing  23.103  3.26  19.848 

Table 2. Water Level Dip Round 29/1/16 

 

 

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 18-04-2016:01:31:10

Medite Europe Ltd. Page 6 of 6 IE 1054 – Monitoring Boreholes AGW7 & AGW8

ieIE CONSULTING

WATER-ENVIRONMENTAL-CIVIL6 REFERENCES 

IE  Consulting,  23/4/2014.  “Groundwater  Monitoring  Report  for  the  Environmental  Protection 

Agency – Medite Europe Ltd.”. Report Reference IE875‐Report‐1060‐Rev 3.0. 

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 18-04-2016:01:31:10

APPENDIX A

Drawing No. IE1054-003-A

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 18-04-2016:01:31:10

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 18-04-2016:01:31:10

Aisling Whelan
Oval
Aisling Whelan
Oval
Aisling Whelan
Text Box
AGW8
Aisling Whelan
Line
Aisling Whelan
Text Box
AGW7
Aisling Whelan
Line

APPENDIX B

Borehole Logs

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 18-04-2016:01:31:10

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 18-04-2016:01:31:10

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 18-04-2016:01:31:10