35 CAMBRIDGE PARK DRIVE 11.08.16 | 37 SGA COMMUNICATING. COLLABORATING. CREATING. PROJECTING RETAIL SIGN Steel blade signage with dimensional lettering PROJECTING PARKING ADDRESS Steel blade signage with dimensional lettering SIGN TYPE QTY TOTAL SF FREESTANDING MONUMENT 1 20 SF FREESTANDING DIRECTIONAL SIGN 1 10 SF PROJECTING RETAIL SIGN 5 30 SF PROJECTING PARKING ADDRESS 1 4 SF WALL SIGN BUILDING ID (SOUTH) 1 10.75 SF WALL SIGN BUILDING ID (EAST) 1 10.75 SF WALL SIGN RETAIL ID 3 14.25 SF TOTAL LOT SIGNAGE SF 99.75 SF SIGNAGE OVERVIEW WALL SIGN RETAIL ID Direct mount acrylic plaque with dimensional lettering WALL SIGN BUILDNG ID | ANCHOR TENANT SIGNAGE Dimensional acrylic lettering mounted to the face of entry canopy FREESTANDING MONUMENT Sculptural steel signage blocks with dimensional lettering FREESTANDING DIRECTIONAL SIGN Sculptural steel signage blocks with cut vinyl lettering COMPLIANCE SUMMARY SQUARE FOOTAGE OVERVIEW ALLOWED SHOWN TOTAL AREA: 651.5 SF TOTAL AREA: 99.75 SF FREE STANDING SIGNS Size: 30 SF maximum Number of signs: 2 Height of sign: 15 FT Illumination: Natural or external lighting only FREE STANDING SIGNS Size: 30 SF Number of signs: 2 Height of sign: Not to exceed 15 FT Illumination: External lighting PROJECTING SIGNS Size: 13 SF maximum Number of signs: 6 Height of sign: Below sill line of second floor Illumination: Natural or external lighting only PROJECTING SIGNS Size: Not to exceed 13 SF Number of signs: 6 Height of sign: Below sill line of second floor Illumination: External WALL SIGNS Size: 60 SF maximum Number of signs: Not Limited Height of sign: Below sill line of second floor Illumination: 1) Natural or external lighting; 2) Exposed neon behind the glass of windows if under 5 SF; 3) Internal Illumination WALL SIGNS Size: 35.75 SF Number of signs: 5 Height of sign: Below sill line of second floor Illumination: In compliance with section 7.16.22 C 2’-6” 2’-6”

Upload: others

Post on 15-Aug-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1:  · 11/8/2016  · wet walls. All other walls surfaces shall be painted drywall. Lavatory counters shall be solid surface with under mount vitreous china sinks, and continuous mirror

35 CAMBRIDGE PARK DRIVE 11.08.16 | 37SGA COMMUNICATING. COLLABORATING. CREATING.

PROJECTING RETAIL SIGNSteel blade signage with dimensional lettering

PROJECTING PARKING ADDRESSSteel blade signage with dimensional lettering

SIGN TYPE QTY TOTAL SF

FREESTANDING MONUMENT 1 20 SF

FREESTANDING DIRECTIONAL SIGN 1 10 SF

PROJECTING RETAIL SIGN 5 30 SF

PROJECTING PARKING ADDRESS 1 4 SF

WALL SIGN BUILDING ID (SOUTH) 1 10.75 SF

WALL SIGN BUILDING ID (EAST) 1 10.75 SF

WALL SIGN RETAIL ID 3 14.25 SF

TOTAL LOT SIGNAGE SF 99.75 SF

SIGNAGE OVERVIEW

WALL SIGN RETAIL IDDirect mount acrylic plaque with dimensional lettering

WALL SIGN BUILDNG ID | ANCHOR TENANT SIGNAGEDimensional acrylic lettering mounted to the face of entry canopy

FREESTANDING MONUMENTSculptural steel signage blocks with dimensional lettering

FREESTANDING DIRECTIONAL SIGNSculptural steel signage blocks with cut vinyl lettering

COMPLIANCE SUMMARY SQUARE FOOTAGE OVERVIEWALLOWED SHOWN

TOTAL AREA: 651.5 SF TOTAL AREA: 99.75 SF

FREE STANDING SIGNSSize: 30 SF maximum Number of signs: 2Height of sign: 15 FTIllumination: Natural or external lighting only

FREE STANDING SIGNSSize: 30 SFNumber of signs: 2Height of sign: Not to exceed 15 FTIllumination: External lighting

PROJECTING SIGNSSize: 13 SF maximum Number of signs: 6 Height of sign: Below sill line of second floorIllumination: Natural or external lighting only

PROJECTING SIGNS Size: Not to exceed 13 SFNumber of signs: 6 Height of sign: Below sill line of second floor Illumination: External

WALL SIGNSSize: 60 SF maximum Number of signs: Not Limited Height of sign: Below sill line of second floor Illumination: 1) Natural or external lighting;2) Exposed neon behind the glass of windows if under 5 SF; 3) Internal Illumination

WALL SIGNSSize: 35.75 SFNumber of signs: 5Height of sign: Below sill line of second floor Illumination: In compliance with section 7.16.22 C

2’-6”

2’-6”

Page 2:  · 11/8/2016  · wet walls. All other walls surfaces shall be painted drywall. Lavatory counters shall be solid surface with under mount vitreous china sinks, and continuous mirror

35 CAMBRIDGE PARK DRIVE 11.08.16 | 38SGA COMMUNICATING. COLLABORATING. CREATING.

CONTEXT KEY PLAN | VIEWS FROM NEIGHBORING SITES

1

2

34

5

6

78

9

Page 3:  · 11/8/2016  · wet walls. All other walls surfaces shall be painted drywall. Lavatory counters shall be solid surface with under mount vitreous china sinks, and continuous mirror

35 CAMBRIDGE PARK DRIVE 11.08.16 | 39SGA COMMUNICATING. COLLABORATING. CREATING.

CONTEXT VIEW 1 | ROUTE 2 OFFRAMP ONTO STEEL PLACE

Project is completely obscured by Alewife Garage link + densely wooded area.

Page 4:  · 11/8/2016  · wet walls. All other walls surfaces shall be painted drywall. Lavatory counters shall be solid surface with under mount vitreous china sinks, and continuous mirror

35 CAMBRIDGE PARK DRIVE 11.08.16 | 40SGA COMMUNICATING. COLLABORATING. CREATING.

Project is completely obscured by Alewife Garage link + densely wooded area.

CONTEXT VIEW 2 | ROUTE 2 OVERPASS

Page 5:  · 11/8/2016  · wet walls. All other walls surfaces shall be painted drywall. Lavatory counters shall be solid surface with under mount vitreous china sinks, and continuous mirror

35 CAMBRIDGE PARK DRIVE 11.08.16 | 41SGA COMMUNICATING. COLLABORATING. CREATING.

Project is mostlyobscured by exsisting 87 Cambridge Park Drive + densely wooded area. Future King Street project will make it completely out of view.

CONTEXT VIEW 3 | BEHIND 87 CAMBRIDGE PARK DRIVE | BIKE PATH

Page 6:  · 11/8/2016  · wet walls. All other walls surfaces shall be painted drywall. Lavatory counters shall be solid surface with under mount vitreous china sinks, and continuous mirror

35 CAMBRIDGE PARK DRIVE 11.08.16 | 42SGA COMMUNICATING. COLLABORATING. CREATING.

CONTEXT VIEW 4 | WETLANDS | BIKE PATH

Project is partiallyobscured by existing 87 Cambridge Park Drive + densely wooded area.

Page 7:  · 11/8/2016  · wet walls. All other walls surfaces shall be painted drywall. Lavatory counters shall be solid surface with under mount vitreous china sinks, and continuous mirror

35 CAMBRIDGE PARK DRIVE 11.08.16 | 43SGA COMMUNICATING. COLLABORATING. CREATING.

CONTEXT VIEW 5 | 125 CAMBRIDGE PARK DRIVE

Project is partiallyobscured by exsisting trees along Cambridge Park Drive.

Page 8:  · 11/8/2016  · wet walls. All other walls surfaces shall be painted drywall. Lavatory counters shall be solid surface with under mount vitreous china sinks, and continuous mirror

35 CAMBRIDGE PARK DRIVE 11.08.16 | 44SGA COMMUNICATING. COLLABORATING. CREATING.

CONTEXT VIEW 6 | ALEWIFE BROOK PARKWAY OVERPASS

Project is mostly obscured by existing 30 Cambridge Park Drive residential building.

Page 9:  · 11/8/2016  · wet walls. All other walls surfaces shall be painted drywall. Lavatory counters shall be solid surface with under mount vitreous china sinks, and continuous mirror

35 CAMBRIDGE PARK DRIVE 11.08.16 | 45SGA COMMUNICATING. COLLABORATING. CREATING.

CONTEXT VIEW 7 | ALEWIFE BROOK PARKWAY OVERPASS BEYOND

Project is completelyobscured by exsisting 30 Cambridge Park Drive residential building.

Page 10:  · 11/8/2016  · wet walls. All other walls surfaces shall be painted drywall. Lavatory counters shall be solid surface with under mount vitreous china sinks, and continuous mirror

35 CAMBRIDGE PARK DRIVE 11.08.16 | 46SGA COMMUNICATING. COLLABORATING. CREATING.

CONTEXT VIEW 8 | TERMINAL ROAD | ADJACENT TO THE MBTA TRAIN LINE

Project is mostlyobscured by exsisting 87 Cambridge Park Drive + densely wooded area. Future King Street project will make it completely out of view.

Page 11:  · 11/8/2016  · wet walls. All other walls surfaces shall be painted drywall. Lavatory counters shall be solid surface with under mount vitreous china sinks, and continuous mirror

35 CAMBRIDGE PARK DRIVE 11.08.16 | 47SGA COMMUNICATING. COLLABORATING. CREATING.

CONTEXT VIEW 9 | FAWCETT STREET | ADJACENT TO THE MBTA TRAIN LINE

Project is completely obscured by residential buildings and parking garage that are in progress.

Page 12:  · 11/8/2016  · wet walls. All other walls surfaces shall be painted drywall. Lavatory counters shall be solid surface with under mount vitreous china sinks, and continuous mirror
Page 13:  · 11/8/2016  · wet walls. All other walls surfaces shall be painted drywall. Lavatory counters shall be solid surface with under mount vitreous china sinks, and continuous mirror

ARCHITECTURE | PLANNINGINTERIOR DESIGN | VDCBRANDED ENVIRONMENTS

35 CAMBRIDGE PARK DRIVE SIGNAGE PACKAGE | 09.19.16

Page 14:  · 11/8/2016  · wet walls. All other walls surfaces shall be painted drywall. Lavatory counters shall be solid surface with under mount vitreous china sinks, and continuous mirror

35 CAMBRIDGE PARK DRIVE 11.08.16 | 50SGA COMMUNICATING. COLLABORATING. CREATING.

SOUTHEAST DAY VIEW

N

Page 15:  · 11/8/2016  · wet walls. All other walls surfaces shall be painted drywall. Lavatory counters shall be solid surface with under mount vitreous china sinks, and continuous mirror

35 CAMBRIDGE PARK DRIVE 11.08.16 | 51SGA COMMUNICATING. COLLABORATING. CREATING.

PREVIOUS SOUTHEAST VIEW

N

Page 16:  · 11/8/2016  · wet walls. All other walls surfaces shall be painted drywall. Lavatory counters shall be solid surface with under mount vitreous china sinks, and continuous mirror

35 CAMBRIDGE PARK DRIVE 11.08.16 | 52SGA COMMUNICATING. COLLABORATING. CREATING.

LANDLORD | TENANT MATRIX

DESCRIPTIONRESPONSIBILITY

LANDLORD TENANT

GENERALBuilding core & shell shall be LEED certifiedby the USBGBC at not less than XLandlord to provide structure parking XSITEWORKPerimeter sidewalks, street curbs, miscellaneous site fur-nishings and landscaping XOutdoor furniture for use by retail patrons or building oc-cupants XTelephone service to main demarcation room from local exchange carrier XDomestic water service to Building XFire protection water service to Building XLANDSCAPING Complete site improvements package, including design and installation XLandscape plans to include location, species, and sizes of trees, shrubs, groundcovers, flowering plants, ornamental flowering trees and coniferous evergreen trees. All plant-ings shall be of specimen quality.

X

Hardscape plans shall include walkways, driveways, curb-ing, exterior lighting, and non-Tenant signage. Design and site improvements shall be of Class A Building quality.

X

STRUCTUREReinforced concrete slabs with live load capacity of 100 psf (typical areas) X

DESCRIPTIONRESPONSIBILITY

LANDLORD TENANT

STRUCTUREReinforced concrete slabs with 150 psf loading capacity in mechanical spaces XStructural enhancements for specific Tenant load require-ments XStructural reinforcing to meet vibration criterion of 8,000 micro inches per second at 50 steps per minute XUpgrade structural reinforcing to meet vibration criterion required by Tenant XTypical Floor to Floor height framing as follows: Floor 1-2 11’-0” | Floor 2-5 14’-6” XColumn bay spacing 45’x45’ XStructural framing dunnage above roof for Base Building equipment XStructural framing dunnage above roof for Tenant equip-ment subject to Landlord review and approval XFramed openings for Base Building utility risers XFramed openings for Tenant utility risers in addition to Base Building within pre-allocated Base Building areas subject to Landlord review and approval

XMiscellaneous metals items and/or concrete pads for Base Building equipment XMiscellaneous metals items and/or concrete pads for Ten-ant equipment XROOFINGSingle ply EPDM or TPO roofing system with rigid insula-tion with 20 year warranty XRoofing penetrations for Base Building equipment/systems XRoofing penetrations for Tenant equipment/systems, in-stalled by Base Building roofing subcontractor XWalkway pads to Base Building equipment X

Page 17:  · 11/8/2016  · wet walls. All other walls surfaces shall be painted drywall. Lavatory counters shall be solid surface with under mount vitreous china sinks, and continuous mirror

35 CAMBRIDGE PARK DRIVE 11.08.16 | 53SGA COMMUNICATING. COLLABORATING. CREATING.

PREVIOUS SOUTHWEST VIEW

N

Page 18:  · 11/8/2016  · wet walls. All other walls surfaces shall be painted drywall. Lavatory counters shall be solid surface with under mount vitreous china sinks, and continuous mirror

35 CAMBRIDGE PARK DRIVE 11.08.16 | 54SGA COMMUNICATING. COLLABORATING. CREATING.

LANDLORD | TENANT MATRIX

DESCRIPTIONRESPONSIBILITY

LANDLORD TENANT

ROOFINGWalkway pads to Tenant equipment. XRoofing alterations due to Tenant changes within Building penthouse, installed by Base Building roofing subcontrac-tor.

X

EXTERIORBuilding exterior envelope XBase Building entrances. XBuilding-mounted signage and/or ground-mounted exterior signage for Tenant identification. XLoading dock overhead door(s). XPenthouse enclosure for Base Building rooftop equipment. XPenthouse enclosure for Tenant rooftop equipment (within base building penthouse). XCOMMON AREASAccessible main entrance. Entrance vestibules will include accessible full glass narrow stile aluminum framed en-trance doors with integrated security hardware.

X

Egress corridors on multi-tenant floors. XFirst floor finish Lobby consistent with a Class A Cam-bridge building. XCore area toilet rooms. Floors and base shall be thin set ceramic tile. Full height ceramic tile shall be provided on wet walls. All other walls surfaces shall be painted drywall. Lavatory counters shall be solid surface with under mount vitreous china sinks, and continuous mirror above lavatory counters to the ceiling height. Metal toilet enclosures shall be floor mounted, steel panel construction with a painted finish. Toilet room accessories shall be similar or equal to those manufacture by Babrick Company, all in accordance with handicapped accessibility regulations

X

DESCRIPTIONRESPONSIBILITY

LANDLORD TENANT

COMMON AREASShower rooms shall utilize finishes similar to core area toilet rooms. XWalls in toilet rooms, stairways, and Base Building, utility rooms shall have a final paint finish. XPainted metal railings in all stairways. XInterior signage for all Base Building rooms (as required by Code) XJanitor’s closets in core areas.

XElectrical closets in core areas. Electrical closets can be used for Tenant-provided electrical equipment, subject to coordination with Base Building equipment, and confor-mance to all Code requirements.

X

Stacked tel/data riser closet for connectivity between de-marcation room and tenant’s remote IDF. XDemarcation rooms. XLoading dock area with 48” high raised dock platforms and transition ramps. XDoors, frames, and hardware at common areas. XParking control equipment in garage. XELEVATORS2 Passenger elevators with 3,500 lb. capacity, 350 FPM. Each serves main lobby Level 1 through Level 5. X1 Service elevator at with 5,000 lb. capacity, 350 FPM, 4’-0” wide door opening. Serves main lobby Level 1 through mechanical penthouse.

X

Page 19:  · 11/8/2016  · wet walls. All other walls surfaces shall be painted drywall. Lavatory counters shall be solid surface with under mount vitreous china sinks, and continuous mirror

35 CAMBRIDGE PARK DRIVE 11.08.16 | 55SGA COMMUNICATING. COLLABORATING. CREATING.

STREETLIFE Design & Projects bv , 2312 RG Leiden, the Netherlands, tel. +1 646 583 2937, www.streetlife.nlChamber of Commerce: 27.355.160, Tax No. NL.8213.12.674.B01

STREETLIFE Design & Projects bv , 2312 RG Leiden, the Netherlands, tel. +1 646 583 2937, www.streetlife.nlChamber of Commerce: 27.355.160, Tax No. NL.8213.12.674.B01

PEDESTRIAN BRIDGE

Page 20:  · 11/8/2016  · wet walls. All other walls surfaces shall be painted drywall. Lavatory counters shall be solid surface with under mount vitreous china sinks, and continuous mirror

35 CAMBRIDGE PARK DRIVE 11.08.16 | 56SGA COMMUNICATING. COLLABORATING. CREATING.

PREVIOUS LANDSCAPE PLAN

CAMBRIDGE PARK DRIVE

PARKING GARAGE

ALEWIFE MBTA

STATIONSTEEL PLACE

87 C.P.D.

35 CAMBRIDGE PARK DRIVE

N

0 10 20 45

138’

-10”

295’-10”property

line

HC PARKING

INTERIORLOADING

EXTERIORLOADING

Page 21:  · 11/8/2016  · wet walls. All other walls surfaces shall be painted drywall. Lavatory counters shall be solid surface with under mount vitreous china sinks, and continuous mirror

35 CAMBRIDGE PARK DRIVE 11.08.16 | 57SGA COMMUNICATING. COLLABORATING. CREATING.

LANDLORD | TENANT MATRIX

DESCRIPTIONRESPONSIBILITY

LANDLORD TENANT

WINDOW TREATMENT

Furnish and install Building Standard window treatment including blocking in Tenant areas. Building Standard is horizontal mini-blinds, 1” wide blades, similar or equal to those manufactured by Levelor (color TBD)

X

Window sills as applicable in Tenant areas. XTENANT AREAS

Drywall and finishes at inside face of exterior fire-rated walls. XDrywall and finishes at inside face of exterior fire-rated walls. XFinishes at inside face at Tenant side of core partitions. XAdditional toilet rooms within Tenant Premises. XTenant Premises HVAC and Plumbing Rooms. XElectrical closets within Tenant Premises. XTel/data rooms for interconnection with Tenant tel./data. XTenant kitchen areas. XModifications to core areas to accommodate Tenant re-quirements. XPartitions, ceilings, flooring, painting, finishes, doors, frames, hardware, millwork, casework, and buildout. XFixed or movable casework. XLaboratory equipment including, but not limited to, bio-safety cabinets, autoclaves, glasswashers, bioreactors. XShaft enclosures for Base Building systems’ risers XShaft enclosures for Tenant risers outside of the allocated space in the main vertical Base Building shafts. XAll interior signage for Tenant Premises. XSound attenuation upgrades for Tenant Premises to comply with Tenant acoustical criteria and design of Tenant Areas. X

DESCRIPTIONRESPONSIBILITY

LANDLORD TENANT

FIRE PROTECTION

Fire service entrance including fire department connection, alarm valve, and back flow protection. XBase Building area distribution piping and up-turned sprin-kler heads. XStair distribution piping and sprinkler heads. XPrimary distribution and sprinkler heads adequate to sup-port light hazard (with upturned heads). XAll run outs, drop heads, and related equipment within Ten-ant Premises. XModification of sprinkler piping and head locations to suit Tenant layout and hazard index. XSpecialised extinguishing systems. XPre-action dry-pipe systems (if required) within Tenant Premises. XFire extinguisher cabinets within Base Building areas XFire extinguisher cabinets within Tenant Premises. XStandpipes, distribution and hose connections within egress stairs, and lobby. XPLUMBING

Domestic water distribution within Tenant Premises includ-ing reduced pressure backflow preventer XDomestic water service with backflow prevention and Base Building risers. XBase Building restroom plumbing fixtures compliant with accessibility requirements. X

Page 22:  · 11/8/2016  · wet walls. All other walls surfaces shall be painted drywall. Lavatory counters shall be solid surface with under mount vitreous china sinks, and continuous mirror

35 CAMBRIDGE PARK DRIVE 11.08.16 | 58SGA COMMUNICATING. COLLABORATING. CREATING.

CURRENT LANDSCAPE PLAN PAVER CALLOUTS

CAMBRIDGE PARK DRIVE

1. Winter MarvelPermeable Paver

2. Midnight Sky/Sandstone

Permeable Paver

3. Ipe Decking(untreated)

4. rain garden5. pervious paver strip1. Winter Marvel

Permeable Paver

35 CAMBRIDGE PARK DRIVE

2.

INTERIORLOADING

HCPARKING

EXTERIORLOADING

N

0 10 20 45

property line

RETAIL

PEDESTRIAN ACCESS

KEY

VEHICLE ACCESS

17’-6

8’-0

Page 23:  · 11/8/2016  · wet walls. All other walls surfaces shall be painted drywall. Lavatory counters shall be solid surface with under mount vitreous china sinks, and continuous mirror

35 CAMBRIDGE PARK DRIVE 11.08.16 | 59SGA COMMUNICATING. COLLABORATING. CREATING.

LANDLORD | TENANT MATRIX

DESCRIPTIONRESPONSIBILITY

LANDLORD TENANT

PLUMBING

Tenant restrooms plumbing fixtures compliant with acces-sibility requirements (in addition to those provided by the Base Building)

X

Tenant metering and sub-metering at Tenant connection. XStorm drainage system. XSanitary waste and vent service for Base Building areas. XSanitary waste and vent service for Tenant Premises. XHot water generation for Base Building Restrooms. XNATURAL GAS

Natural gas service to Building. XNatural gas service to Base Building boilers. XNatural gas service, pressure regulator and meter for ten-ant equipment. XNatural gas piping from Tenant meter to Tenant Premises or Tenant equipment area. XNatural gas pipe distribution within Tenant Premises. XNatural gas pressure regulator vent pipe riser from valve location through roof. XHEATING, VENTILATION, AIR CONDITIONING

Cooling towers, supporting condenser water pumps and piping. XStair & Elevator pressurization if required by code. XMain electric room ventilation system XCentral gas fired boiler plant XHot water pipe risers. XHot water pipe distribution within Tenant Premises. XReheat coils within Tenant Premises. XReheat coils within Base Building areas. X

DESCRIPTIONRESPONSIBILITY

LANDLORD TENANT

HEATING, VENTILATION, AIR CONDITIONING

Building Management System (BMS) for Base Building. XBMS (compatible with Landlord’s system) within Tenant’s Premises monitoring Tenant infrastructure. XSupply air duct distribution, VAV terminal or fan coils, equipment connections, insulation, air terminals, dampers, hangers, etc. within Tenant Premises.

XSupply air duct distribution, VAV terminals or fan coils, equipment connections, insulation, air terminals, dampers, hangers, etc. within Base Building areas.

X

Restroom exhaust for Base Building area restrooms. XRestroom exhaust for new restrooms built within Tenant Premises. XElectric room ventilation system for Base Building electri-cal closets. XElectric room ventilation system for electrical closets within Tenant Premises. XSound attenuation for Base Building equipment to comply with Zoning Ordinance XSound attenuation for Tenant equipment to comply with Zoning Ordinance XAdditional/dedicated cooling equipment for Tenant require-ments XEnergy recovery ventilators located in the penthouse to provide tempered ventilation air to the building at a rate of 0.3 CFM/SF for office areas based upon a 60% office/ 40% lab program.

X

Hot water and chilled water risers for future tenant office HVAC distribution systems. XFan coils, heat pumps, chilled beams and associated distri-bution and controls to support office HVAC. XBoiler Capacity: 20 BTU/SF Office X

Page 24:  · 11/8/2016  · wet walls. All other walls surfaces shall be painted drywall. Lavatory counters shall be solid surface with under mount vitreous china sinks, and continuous mirror

35 CAMBRIDGE PARK DRIVE 11.08.16 | 60SGA COMMUNICATING. COLLABORATING. CREATING.

DESCRIPTIONRESPONSIBILITY

LANDLORD TENANT

ELECTRICAL

Diesel life safety generator XSound attenuation for life safety generator to comply with Zoning Ordinance X480/277V bus rider in electrical closets for Tenant connec-tion. XBus plug, meter socket, meter, and disconnect for bus tie in. XStandby power distribution for Base Building areas. XLighting and power distribution for Base Building areas. XLighting and power distribution for Tenant Premises. XLife safety emergency lighting/signage including bus plugs, panels, and circuit breakers for Base Building areas. XLife safety emergency lighting/signage for Tenant Prem-ises. XTenant panels, transformers, etc. in addition to Base Build-ing house panels for Base Buidling Area. XAllocations of bus power for Tenant use (w/USF):• Office Lighting: 1.5w / SF• Office Power: 5 w / SF

X

FIRE ALARM

Base Building fire alarm system with devices within Base Building areas. XFire alarms sub panels and devices for Tenant Premises with integration into Base Building system. XAlteration to fire alarm system to facilitate Tenant program. XTELEPHONE/DATA

Underground local exchange carrier service to primary demarcation room. XService from primary demarcation room to secondary demarcation room. XTel/data riser closet. X

DESCRIPTIONRESPONSIBILITY

LANDLORD TENANT

TELEPHONE/DATA

Tenant tel./ data rooms XPathways from demarcation room directly into Tenant tel./data rooms. XTel./Data cabling (demarcations rms. to intermediate distri-bution frame rms.) XTel./Data cabling from demarcation room and/ or intermedi-ate distribution frame rooms to Tenant tel./data room. XFiber optic service for Tenant use. XTel./data infrastructure including, but not limited to, serv-ers, computers, phone systems, switches, routers, MUX panels, equipment racks, ladder racks, etc.

X

Provisioning of circuits and service from service providers. XAudio visual systems and support. XStation cabling from Tenant tel./data room to all Tenant locations, within the suite and exterior to the suite, if needed.

X

SECURITY

Card access at Building entries. XCard access into or within Tenant Premises on separate Tenant installed and managed system. XVideo camera coverage of Tenant Premises on separate Tenant installed and managed system. X

LANDLORD | TENANT MATRIX

Page 25:  · 11/8/2016  · wet walls. All other walls surfaces shall be painted drywall. Lavatory counters shall be solid surface with under mount vitreous china sinks, and continuous mirror

35 CAMBRIDGE PARK DRIVE 11.08.16 | 61SGA COMMUNICATING. COLLABORATING. CREATING.

DESCRIPTIONRESPONSIBILITY

LANDLORD TENANT

PLUMBING

Non-potable water risers for lab use including water booster system and reduced pressure backflow preventer XNon-portable water distribution within Tenant Premises. XTwo stage active pH neutralization system. XLab waste and vent pipe risers. XLab waste and vent pipe distribution serving Tenant Premises. XNon-portable hot water generation for Tenant use. XCentral lab air compressor. XCompressed air piping risers. XCompressed air pipe distribution within Tenant Premises for specific points of use. XCentral lab vacuum system XLab vacuum pipe distribution within Tenant Premises for specific points of use. XTepid water pipe distribution and emergency fixtures within Tenant Premises. XRO/DI water generator. XRO/DI water pipe risers. XDI water pipe distribution within Tenant Premises for specific points of use including validation and final filters. XManifolds, piping, and other requirements including cylinders, not specifically mentioned above. X

DESCRIPTIONRESPONSIBILITY

LANDLORD TENANT

HEATING, VENTILATION, AIR CONDITIONING

Central water cooled chilled water plant. X

Boiler Capacity: 150 to 200 BTU/ Lab SF XCooling Tower Capacity: 100 to 150 Lab SF/ Ton X

Chilled water pipe distribution within Tenant Premises. X

Condenser water pipe distribution within Tenant Premises. XLab once-through supply air handling units with prefilters, final filters, chilled water coils, and hot water coils. Units are sized for approximately 1.75 CFm usable SF of lab space based upon a 60% office/ 40% lab program.

X

Exhaust Air handling units with prefilters, heat recovery coils and high plume exhaust fans sized for approximately 1.75 CFM per usable SF of lab space.

XExhaust air duct distribution, exhaust air valves, equipment connections, insulation, air terminals, dampers, hangers, etc. within Tenant Premises.

X

ELECTRICAL

Allocation of bus power for Tenant use (w/USF):• Lab Lighting: 1.5w / SF• Lab Power: 12w / SF

XStandby natural gas generator for Tenant sized for 5 w / SF for tenant lab areas based upon a 60% office/ 40% lab program.

XAutomatic transfer switches and distribution for Tenant optional standby loads. XFIRE PROTECTION

Primary Distribution sized to provide ordinary hazard group 1 in Lab areas. Upright sprinkler heads locations to support light hazard.

X

LANDLORD | TENANT MATRIX

Page 26:  · 11/8/2016  · wet walls. All other walls surfaces shall be painted drywall. Lavatory counters shall be solid surface with under mount vitreous china sinks, and continuous mirror

35 CAMBRIDGE PARK DRIVE 11.08.16 | 62SGA COMMUNICATING. COLLABORATING. CREATING.

BOMA DIAGRAMS

UP

Legend

Building Common AreaFloor Common AreaMajor Vertical PenetrationOffice/Lab AreaRetail Area

9305 SFOffice Tenant

7039 SFOffice Tenant

4625 SFOffice Tenant

187 SFElec. Cl.

931 SFFloor Common

7038 SFRetail Tenant

5829 SFBldg Common

277 SFCorridor

123 SFVestibule

209 SF

Fire PumpRoom

261 SF

PH NeutralizationRoom

160 SF

WaterRoom

210 SF

FireCommand

1233 SFFloor Common

268 SFStair 3

512 SFArea

445 SFArea

169 SFTelcom

Men

Women

Elev.

Elev.Jan

Elec.Cl.

ITRiser

LifeSafetyElec.

ShaftAbove

ShaftAbove

ShaftAbove

Lobby

Lobby

1st Floor DATE: 06.01.201635 CAMBRIDGE PARK DRIVE

451 SF

MAINELECTRICAL

222 SF

FUEL OILSTORAGE

3375 SFTRUCK BAY

FreightElevator

7039 SF

Office / LabTenant

24331 SF

Office / LabTenant

935 SFFloor Common

2154 SFFloor Common

1296 SFFloor Common

512 SFArea

619 SFArea

212 SFArea

268 SFStair 3

256 SFArea

173 SF

Elec.Cl.

1730 SFArea

Men

Women

Elev.

Elev.

ExhaustShaft

SupplyShaft

ExhaustShaft

SupplyShaft

Elec.Cl.

ITRiser

LifeSafetyElec.

PlumbingRiser

ExhaustShaft

2nd Floor DATE: 06.01.201635 CAMBRIDGE PARK DRIVE

1350 SFElectric Room

FreightElevator

24310 SF

Office / LabTenant

1677 SFFloor Common

1296 SFFloor Common 212 SF

Area

619 SFArea

268 SFStair 3

512 SFArea

11702 SFBuilding Common

Men

Women

Elev.

Elev.

ExhaustShaft

SupplyShaft

Elec.Cl.

LiveSafetyElec.

PlumbingRiser

ExhaustShaft

ITRiser

5th Floor DATE: 06.01.201635 CAMBRIDGE PARK DRIVE

FreightElevator

35098 SF

Office / LabTenant

931 SFFloor Common

1512 SFFloor Common

1296 SFFloor Common

619 SFArea

212 SFArea

173 SF

Elec.Cl.256 SF

Area

268 SFStair 3

Men

Women

Elev.

Elev.

ExhaustShaft

SupplyShaft

PlumbingRiser

ExhaustShaft

ExhaustShaft

SupplyShaft

Elec.Cl.

ITRiser

LifeSafetyElec.512 SF

Area

3er Floor DATE: 06.01.201635 CAMBRIDGE PARK DRIVE

FreightElevator

24885 SFBldg Common

181 SF

Life SafetyElec.

512 SFStair 2 224 SF

Area619 SFStair 1

PlumbingRiser

ExhaustShaft

Mechanical Penthouse DATE: 06.01.201635 CAMBRIDGE PARK DRIVE

FreightElevator

268 SFStair 3

35084 SF

Office / LabTenant

944 SFFloor Common

1512 SFFloor Common

1296 SFCommon Floor

619 SFArea

212 SFArea

512 SFArea

173 SF

Elec.Cl.

256 SFArea

268 SFStair 3

Men

Women

Elev.

Elev.

ExhaustShaft

SupplyShaft

PlumbingRiser

ExhaustShaft

PlumbingRiser

ExhaustShaft

ExhaustShaft

SupplyShaft

Elec.Cl.

ITRiser

LifeSafetyElec.

4th Floor DATE: 06.01.201635 CAMBRIDGE PARK DRIVE

FreightElevator

LEVEL 1 LEVEL 4

LEVEL 2 LEVEL 5

LEVEL 3 MECHANICAL PENTHOUSE

KEY

TENANT AREA

BUILDING COMMON AREA

FLOOR COMMON AREA

MAJOR VERTICAL PENETRATION

OFFICE/LAB AREA

RETAIL AREA

LEVEL 1: 20,969 SF

LEVEL 2: 31,370 SF

LEVEL 3: 35,098 SF

LEVEL 4: 35,098 SF

LEVEL 5: 24,310 SF

MECH. PENT.: 0 SF

TOTAL: 146,845 SF

Page 27:  · 11/8/2016  · wet walls. All other walls surfaces shall be painted drywall. Lavatory counters shall be solid surface with under mount vitreous china sinks, and continuous mirror

35 CAMBRIDGE PARK DRIVE 11.08.16 | 63SGA COMMUNICATING. COLLABORATING. CREATING.

BOMA MATRIX

MULTI-TENANT SCENARIO Preliminary Area Calculations 35 Cambridge Park Drive | Cambridge, MA DRAFT - Based on 6/1/16 Conceptual Plans Project No. 3932.00Standard BOMA Method Vertical Expansion Date: 1 June 2016

1 2 3 3A 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20(3-4) (7+8+9) (5-10) (5/10) (7x12) (8x12) (9x12) 13+14+15 (16/(16-15)) (13x17) (14x17) (18+19)=5 =10 =11 =12 =13 =14 =15 =16 =17 =18 =19 =20

USABLE AREA BASIC RENTABLE AREA RENTABLE AREAGROSS GROSS GROSS MAJOR FLOOR SPACE OFFICE STORE BUILDING FLOOR FLOOR FLOOR OFFICE STORE BUILDING BUILDING BUILDING OFFICE STORE TOTAL

FLOOR BUILDING MEASURED ZONING VERTICAL RENTABLE I.D. AREA AREA COMMON USABLE COMMON R/U AREA AREA COMMON RENTABLE R/U AREA AREA RENTABLEAREA AREA AREA PENETRATION AREA AREA AREA AREA RATIO AREA AREA RATIO AREA

9,125 9,90222,207 24,098 31,417 31,417

1 7,038 7,637 9,957 9,957

43,809 42,863 37,990 1,225 41,638 29,245 9,125 38,370 3,268 1.09 31,736 9,902 1.30 41,374 41,37432,981 37,285 48,609 48,609

2

41,203 40,882 38,646 3,597 37,285 32,981 32,981 4,304 1.13 37,285 1.30 48,609 48,60935,354 39,015 50,864 50,864

3

41,203 40,882 40,006 1,867 39,015 35,354 35,354 3,661 1.10 39,015 1.30 50,864 50,86435,354 39,015 50,864 50,864

4

41,203 40,882 40,006 1,867 39,015 35,354 35,354 3,661 1.10 39,015 1.30 50,864 50,86414,669 15,806

21,778 23,465 30,592 30,5925

41,203 40,882 28,167 1,611 39,271 21,778 14,669 36,447 2,824 1.08 23,465 15,806 1.30 30,592 30,59225,004 26,080

R *

28,020 27,703 1,623 26,080 25,004 25,004 1,076 1.04 26,080 1.30PROJECT

TOTAL 236,641 234,094 184,815 11,790 222,304 154,712 48,798 203,510 18,794 170,516 51,788 222,304 1.30 222,304 222,304

Gross Building Area = Outside Face of BuildingGross Measured Area = Inside Face of Dominant PortionMajor Vertical Penetrations = Elevator, Stair Shafts, AtriumFloor Rentable Area = Gross Measured Area - Major Verical PenetrationsFloor Usable Area = Office Area + Store Area + Building Common AreaFloor Common Area = Floor Rentable Area - Floor Usable AreaFloor R/U Ratio = Floor Rentable Area / Floor Usable AreaBasic Rentable Area = Usable Area x Floor R/U RatioBuilding R/U Ratio = Building Rentable Area / (Building Rentable Area - Basic Rentable Area of Building Common Area)Building Rentable Area = Basic Rentable Area x Building R/U Ratio

* Estimated Mechanical Penthouse Area

Page 28:  · 11/8/2016  · wet walls. All other walls surfaces shall be painted drywall. Lavatory counters shall be solid surface with under mount vitreous china sinks, and continuous mirror