Shooting Schedule This is the shooting schedule for our day. We planned that the filming would take a maximum of two days (one weekend). However, we did not include the likes of reshoots.

Upload: dylanrhayes1

Post on 25-Jul-2015

17 views

Category:

Art & Photos


0 download

TRANSCRIPT

Page 1: Media pics

Shooting Schedule

• This is the shooting schedule for our day. We planned that the filming would take a maximum of two days (one weekend). However, we did not include the likes of reshoots.

Page 2: Media pics

First Page of Storyboard• This is the illustrated version of

out storyboard, looking back we can obviously see that the setting has changed. However, most of the shots and concepts have stayed the same. Except we completely cut out the chase scene as we did not feel that it added anything to the scene. The biggest disappointment of this whole process is that we did not include the hill that we wanted; but we worked around it and made the best result possible

Page 3: Media pics

Second Page of Storyboard

Page 4: Media pics

First Draft of Script• This is a very early version of the

script. This also includes the chase scene and hill. But as I said the chase scene wouldn’t have added anything to the opening. I also feel that the scene would have been messy and we wouldn’t have been able to make the best quality of it. None of our group had had experience of filming or working with action scenes previously. Consequently I didn’t feel comfortable filming a full on chase scene through forests and grassy terrains.