Project NameInternational Manufacturing Plant– Fractionation Facility
Project LocationCovington, Georgia
Project Team
Specializations
Pipe Shop PrefabSheet Metal Shop Prefab
MarketsCorporate Campuses
Owner: Biopharmaceuticals ManufacturerGeneral Contractor: Fluor CorporationArchitect: Flad ArchitectsEngineers: AEI Corporation,CRB Consulting EngineersSubcontractor: McKenney’s, Inc.
Building Information ModelingPlumbing Shop Prefab
IndustrialScience & Technology
McKenney’s completed a massive mechanical systems installationproject at a leading pharmaceutical manufacturing plant in Covington, Georgia.
The ChallengeThere was no room for missteps with 278 mechanical systems to install and strict engineering and FDA quality regulations to meet. Facing an extremely fast-paced schedule, McKenney’s had to manage coordination and construction activities along with more than 300 formal design changes and a complicated change management process.
The SolutionTo manage design and field changes, McKenney’s assembled a change management team and developed a change management process while tasking our on-site resources and BIM team with identifying design inconsistencies. To keep construction on schedule, we established a formal progress-tracking tool and manpower loading plans—and regularly held short interval “look ahead” meetings. We also developed a robust quality assurance quality control method and team for system turnover through a four-level walkdown process.
The content of this document is not intended as an endorsement.
The ResultsThe team met very high quality standards and hit the originally scheduled startup date.