PJOE Page 1 of 12 Mechanical Structures Experience PJOE yard 28-05-2012 From the start of the yard in May 2006 following projects have been realized: Client Project Description incl weight and year Frigstad Frigstad Oslo SSDR bracings Fabrication of 4 pontoon bracings for Yantai Raffles yard, 800T Awilco WilPioneer SSDR sponsoon tanks Fabrication of sponsoon blocks for Yantai Raffles yard, 1,200T CNOOC Bozhong field, Bohai Bay, China Yoke Mooring System, refurbishment, 300T, 2008 GustoMSC Aramco ARB- 3 jack-up, 550 T crane, Saudi Arabia Fabrication of tub, column and boom, 500T total with 690 material Nov, 2008 – Apr, 2009 Saipem Overhead cranes assembly for CastorONE Assembly and completion of cargo hold overhead cranes from Navalimpianti, March, 2009 May,2009

Upload: others

Post on 03-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Mechanical Structures PJOE · BMA(BHP Billiton & Mitsubishi Alliance) Hay Point Expansion Stage 3, Australia Procurement, fabrication and assembly of 262 Conveyor Gallery Modules,

PJOE

Page 1 of 12

Mechanical Structures Experience PJOE yard 28-05-2012 From the start of the yard in May 2006 following projects have been realized: Client

Project Description incl weight and year

Frigstad Frigstad Oslo

SSDR bracings

Fabrication of 4 pontoon bracings for Yantai Raffles yard, 800T

Awilco WilPioneer

SSDR sponsoon tanks

Fabrication of sponsoon blocks for Yantai Raffles yard, 1,200T

CNOOC Bozhong

field, Bohai Bay, China

Yoke Mooring System, refurbishment, 300T, 2008

GustoMSC Aramco ARB-

3 jack-up, 550 T crane, Saudi Arabia

Fabrication of tub, column and boom, 500T total with 690 material Nov, 2008 – Apr, 2009

Saipem Overhead

cranes assembly for CastorONE

Assembly and completion of cargo hold overhead cranes from Navalimpianti,March, 2009 May,2009

Page 2: Mechanical Structures PJOE · BMA(BHP Billiton & Mitsubishi Alliance) Hay Point Expansion Stage 3, Australia Procurement, fabrication and assembly of 262 Conveyor Gallery Modules,

PJOE

Page 2 of 12

Mechanical Structures Client

Project Description incl weight and year

Bluewater CALM buoys

07 and 08 CALM buoys, combined 500T, Nov, 2007 – Oct, 2008

Hydralift/ AmClyde

Swiber M60 Offshore Crane

Offshore crane, model M60, 640T, 2009

Hydralift/ AmClyde

Global PC-37 Offshore Mast Cranes Global 1200

Offshore crane, model PC-37, 1,400T, 2009

Hydralift/ AmClyde

GSP Bigfoot 1, KP-87 King Post crane

Offshore crane, model KP-87, 400T, 2009

Swiber LDB Swiber

Chai vessel Part engineering, fabrication of tub, counter weight, stinger, boom rest and installation of M60 AmClyde crane and engine room, 1,500 T, June, 2009 – Dec, 2009

Page 3: Mechanical Structures PJOE · BMA(BHP Billiton & Mitsubishi Alliance) Hay Point Expansion Stage 3, Australia Procurement, fabrication and assembly of 262 Conveyor Gallery Modules,

PJOE

Page 3 of 12

Mechanical Structures Client

Project Description incl weight and year

Swiber LDB Swiber

Chai vessel Part engineering, fabrication of tub, counter weight, stinger, boom rest and installation of M60 AmClyde crane and engine room, 1,500 T, June, 2009 – Dec, 2009

Aker Solutions

Tupi SRU modules, Brazil

Exotic piping for Tupi modules, 150 kg, May, 2009 – Sep, 2009

CITIC Pacific Mining

Cape Preston Iron Ore project, Desalination Plant, Australia

Fabrication of 7 marine harbour caisson structures 2,450 Ton, July, 2009 – Oct, 2010

CITIC Pacific Mining

Cape Preston Iron Ore project, Desalination Plant, Australia

Fabrication of Brine Tank out fall structure 1,000 Ton, July, 2009 – Oct, 2010

Saipem Completion

work on Pipe joint Hatches CastorONE

Assembly and completion of pipe joint cargo holds hatches from Navalimpianti, 2009

Hyundai Moon

Heat exchangers assembly for power plant Bahrain

Providing of facilities and assistance for heat exchanger assembly, 20, 300T each, 2009

Page 4: Mechanical Structures PJOE · BMA(BHP Billiton & Mitsubishi Alliance) Hay Point Expansion Stage 3, Australia Procurement, fabrication and assembly of 262 Conveyor Gallery Modules,

PJOE

Page 4 of 12

Mechanical Structures Client

Project Description incl weight and year

CITIC Pacific Mining

Cape Preston Iron Ore project, Desalination Plant, Australia

Fabrication of 7,600T pre-cast elements for Desalination Plant, July, 2009 – Oct, 2010

CITIC Pacific Mining

Cape Preston Iron Ore project, Desalination Plant, Australia

Part design and fabrication of SR-1 E-House, 780T, July, 2009 – Aug, 2010

CITIC Pacific Mining

Cape Preston Iron Ore project, Desalination Plant, Australia

Part design and fabrication of SR-2 and SR-3 E-Houses, 50 and 45T, July, 2009 – May, 2010

CITIC Pacific Mining

Cape Preston Iron Ore project, Desalination Plant, Australia

Part design and fabrication of control room, 80T, July, 2009 – May, 2010

CITIC Pacific Mining

Cape Preston Iron Ore project, Desalination Plant, Australia

Part design and fabrication of equipment skids, up to 1,200T total, Sep, 2009 – Dec, 2009

Page 5: Mechanical Structures PJOE · BMA(BHP Billiton & Mitsubishi Alliance) Hay Point Expansion Stage 3, Australia Procurement, fabrication and assembly of 262 Conveyor Gallery Modules,

PJOE

Page 5 of 12

Mechanical Structures Client

Project Description incl weight and year

CITIC Pacific Mining

Cape Preston Iron Ore project, Desalination Plant, Australia

Part design and fabrication of Reverse Osmosis East and West module, 2 x 3,000 T, each shipped in 2 parts, July, 2009 – May, 2010

CITIC Pacific Mining

Cape Preston Iron Ore project, Desalination Plant, Australia

Part design and fabrication of Pump module East and West, 700T and 600T, July, 2009 – Oct, 2010

CITIC Pacific Mining

Cape Preston Iron Ore project, Desalination Plant, Australia

Part design and fabrication of Pre-treatment modules East and West, 3,600T each, shipped in 4 parts each, July, 2009 – Oct, 2010

Page 6: Mechanical Structures PJOE · BMA(BHP Billiton & Mitsubishi Alliance) Hay Point Expansion Stage 3, Australia Procurement, fabrication and assembly of 262 Conveyor Gallery Modules,

PJOE

Page 6 of 12

Mechanical Structures Client

Project Description incl weight and year

Hydralift AmClyde

M52 crane for Bumi Armada

Offshore crane model M52 suitable for Caspian Sea transport, 410T, 2010

Conoco Phillips

Penglai helicopter base, China

Aluminum helicopter maintenance platform, 3T, 2010

CITIC Pacific Mining

Cape Preston Iron Ore project, Desalination Plant, Australia

Part design and fabrication of pipe racks and supports, total 600T, 2010

CNOOC Spooling

Reels Fabrication of 2 cable reels, 35T each, July, 2009

Hydralift/ AmClyde

Global PC-37 Offshore Mast Cranes Global 1201

Offshore crane, model PC-37, 1,200T capacity, 1,400T, Oct, 2009 – Sep, 2010

Page 7: Mechanical Structures PJOE · BMA(BHP Billiton & Mitsubishi Alliance) Hay Point Expansion Stage 3, Australia Procurement, fabrication and assembly of 262 Conveyor Gallery Modules,

PJOE

Page 7 of 12

Mechanical Structures Client

Project Description incl weight and year

Hydralift AmClyde

PC-37 crane for Saipem FDS II

Offshore crane model PC-37 1,000T capacity for Saipem, 720T, Nov, 2009 – July, 2010

CITIC Pacific Mining

Cape Preston Iron Ore project, Desalination Plant, Australia

Design and fabrication of 2 barge loading dolphins, ~ 750T, delivery 2010

CITIC Pacific Mining

Cape Preston Iron Ore project, Desalination Plant, Australia

In-take caisson for desalination plant, 3,600T, delivery October 2010

Hyundai Moon

Sabiya HRSG power plant, Kuwait,

Assembly and part fabrication of 92 heat exchanger modules including load-out, ~ 400T/each, Dec, 2010 – Aug, 2011

Page 8: Mechanical Structures PJOE · BMA(BHP Billiton & Mitsubishi Alliance) Hay Point Expansion Stage 3, Australia Procurement, fabrication and assembly of 262 Conveyor Gallery Modules,

PJOE

Page 8 of 12

Mechanical Structures Client

Project Description incl weight and year

Sofec Oil Search,

Papua New Guinea LNG

Fabrication of CALM buoy and PLEM for export, Dec, 2010 – Sep, 2011

EMAS Offshore

Oil Search, Kumul terminal, Papua New Guinea

Fabrication of various components for pipeline installation, 87 Ton including load-out and seafastening of CALM buoy system, Dec, 2010 – Nov, 2011

Hyundai Moon

Power plant, Saudi Arabia

Assembly and part fabrication of 62 heat exchanger modules including load-out, ~ 300T/each, delivery 2011

Page 9: Mechanical Structures PJOE · BMA(BHP Billiton & Mitsubishi Alliance) Hay Point Expansion Stage 3, Australia Procurement, fabrication and assembly of 262 Conveyor Gallery Modules,

PJOE

Page 9 of 12

Mechanical Structures Client

Project Description incl weight and year

Seajacks Zaratan jack-up plfm, 800 ton crane

Fabrication of Leg Crane, 860T, Dec, 2010 – Nov, 2011

GustoMSC A2SEA Sea

Installer jack-up plfm, 800 ton crane

Fabrication of Leg Crane, 860T, March, 2011 – Feb, 2012

Karara Mining Ltd

Karara Iron Ore Mine, EPCM Worley Parsons, West Australia

Fabrication of chute platework for inland assembly including installation of liners, 1,315T Nov, 2011 – Apr, 2012

Page 10: Mechanical Structures PJOE · BMA(BHP Billiton & Mitsubishi Alliance) Hay Point Expansion Stage 3, Australia Procurement, fabrication and assembly of 262 Conveyor Gallery Modules,

PJOE

Page 10 of 12

Mechanical Structures Ongoing projects PJOE yard The following projects are presently ongoing in the PJOE yard: Client

Project Description incl weight and year

Sandvik Rio Tinto,

Cape Lambert port B, Ship Loader 11, Australia

Fabrication, final assembly and disassembly of ship-loader, June, 2011 – Nov, 2012

Sandvik Rio Tinto,

Hope Down, two Stackers and one reclaimer, Australia

Fabrication, final assembly and disassembly of two stackers, 590T/each and one reclaimer 1,530T, June, 2011 – Aug, 2012

BMA(BHP Billiton & Mitsubishi Alliance)

Hay Point Expansion Stage 3, Australia

Procurement, fabrication and assembly of 262 Conveyor Gallery Modules, ~9,500T and fabrication of 176T welded frames for conveyor galleries drives, July, 2011 – Oct, 2012

COSCO ATP, Cheviot

filed, Octobuoy topsides

Rolling of tubulars for deck structure, 1,255T Oct, 2011 – June, 2012

Page 11: Mechanical Structures PJOE · BMA(BHP Billiton & Mitsubishi Alliance) Hay Point Expansion Stage 3, Australia Procurement, fabrication and assembly of 262 Conveyor Gallery Modules,

PJOE

Page 11 of 12

Mechanical Structures Client

Project Description incl weight and year

BMA(BHP Billiton & Mitsubishi Alliance)

Hay Point Expansion Stage 3, Australia

Procurement, fabrication and assembly of 7 Surge Bins and Transfer Tower modules, 6,600T and fabrication of 212T chutes platwork, July, 2011 – Dec, 2012

Sofec Tesoro

Hawaii, USA Fabrication of CALM buoy, 210T Nov, 2011 – July, 2012

Sofec CNOOC,

LuFeng field, P R of China

Fabrication of spider buoy, 290T Nov, 2011 – June, 2012

Heerema ExxonMobil

Arkutun-Dagi field, Sakhalin, Russia

Fabrication of spools, protection sections and miscellaneous structures, 400T total, Nov, 2011 – July, 2012

Page 12: Mechanical Structures PJOE · BMA(BHP Billiton & Mitsubishi Alliance) Hay Point Expansion Stage 3, Australia Procurement, fabrication and assembly of 262 Conveyor Gallery Modules,

PJOE

Page 12 of 12

Mechanical Structures Client

Project Description incl weight and year

BP BP, Jacobs Engineering EPCM, Bulwer Refinery, Brisbane, Australia

Fabrication of Hydroisom & HF Alkylation modules, 550T, March, 2012 – Aug, 2012

Sandvik Semarco

Brazil Fabrication of shiploader, 1,000T, May, 2012 – Feb, 2013