mechanical qc (aramco approved)
TRANSCRIPT
7/26/2019 Mechanical QC (Aramco Approved)
http://slidepdf.com/reader/full/mechanical-qc-aramco-approved 1/5
Muhammad Ameer Ahsan |Phone: +92-0332-7785086 |Email: am ee ra h s a n 74 8 @ g m ail.c o m
Mechanical QC Engineer
Career Objective:
To be a part of an organization where I can fully utilize my skills and make a
significant contribution to the success of the employer and at the same time my
individual growth.
Wor E!"erience:
#e$"on$ibilitie$:
• I participated in the T&I (Testing and Inspection) and on-stream inspection of equipment and
piping in the production facility, to assure they are within tolerances, grade and quality
specied, to assure that they are properly stored and handled and that they have not beendamaged in any way
• I have prepared draft inspection reports, pre and post T&I reports, wor! sheets, non-
compliance reports, and made log boo! entries of on-site inspection ndings, and
maintained"updated the databases and hardcopies for inspection records and
correspondence les
• #nother duty was to supervise the $%T inspection team, issue the necessary wor! permits,
inspect each ob site for unsafe conditions that could cause inuries, death or nancial loss to
the company and to report ndings to the appropriate parties
• I was also responsible to assist in the development and training of less qualied inspectors
and complete the Inspector Training 'rogram as prescribed by the supervisor• I have scheduled and selected welds due for inspection by nondestructive eaminations and
trac!ed the welders performances
• I was responsible for determine the corrosion rates and remaining life of the equipment in the
corrosive"erosive service #nother duty was to monitor the heat treatments of piping, vessels
and associated equipment
I had to witness or monitor tests required for welder certication and welding procedure
qualications and also routine hydrostatic tests on piping and service tests on utility piping as
authori*ed by +audi #ramco and industry standards
%ob &e$i'nation: (echanical Qc (Aramco Approved
Com"an) name: !"terran #elleli !nergy $saProject: Yanbu south Terminal DDFR TANKS
*ration: %ne 20,5 to (arch 20,6
7/26/2019 Mechanical QC (Aramco Approved)
http://slidepdf.com/reader/full/mechanical-qc-aramco-approved 2/5
%ob #e$"on$ibilitie$:
• %reparation of Inspection and Test %lan& checklist& procedures and review of construction
drawing.
• 'aterial eceiving inspection of all T%)*% %ipes and fittings& +asket& valves& flanges& bolts
, nuts in compliance to material list& mill certificates& test reports and correct material
specification.
• -ontrol of uality for piping fabrication such as fit/up& visual and dimensional inspection
conforming to approved for construction drawings.
• esponsible for issuance of 0on 1 -onformance eport if any violation and out of standard for
piping works.
• -onducts uality co/ordination meeting and initiate corrective and preventive action.
• Inspection of 2+ T piping spools fabrication& installation and testing.• Assign as hydro test engineer for all piping and thermoplastic piping& shop fabrication.
• 3ine flushing& air blowing4 pressure testing& piping lay/up inspection& relief valve installation& re/
instatement and final inspection for mechanical completion.
• esponsible for inspection of pipe spools for shop and fabrication such as fit/up& dimensional
and visual inspection
• %repare euest for Inspection(*I to %ro5ect 'anagement Team(%'T and %ro5ect Inspection
6ivision through Quality 'anagement Information system(Q'I7
• 8itnessed& checked& monitor and inspect of hydro test pressure as per 7A!7/99:(+eneral
euirements for %ressure Testing
•%repare 0on/ -onformance eport (0-& %reventive Action euest (%A and initiatecorrective Action for every violation and out of 7tandard of -onstruction activities.
• -lose log book entry or surveillance violation.
• Assigned as Q-/%iping Inspector for *iber +lass einforced %lastic %iping (*% of installation
and spool fabrication for ;:< *ire water line and =;< cooling water line/Adhesive bonded 5ointand 3amination 5oints.
• 8itnessed and inspection of *% piping system for Adhesive bonded 5oints& 3amination 5oint&
#arcol hardness as per A7T' 6 ;>?@.
• 'aintaining the storage conditioning of all fiber glass woven roving ;=9&@9&>?9 g Adhesive
kits& chemicals such as !po"y resin& Bardener& vinyl !ster esin etc.
E!"erience in tatic e.i"ment
%ob &e$i'nation: Planning Coordinator ('echanical Q-
Com"an) name: %ubail chevron Phillips (%CP/ a&i ChevronPhillips (CP
Project: 1urn round ;9C>
7/26/2019 Mechanical QC (Aramco Approved)
http://slidepdf.com/reader/full/mechanical-qc-aramco-approved 3/5
-ollecting daily work updates (about column& 6rums& %ressure vessel& !"changer& fin fan heat
e"changer from site and submitting to 7enior %lanner.
7tacking the valves , %6D7 as per standard and delivering to the relevant workshops
To Identify %6D7 and -ontrol valves on Isometric and %,I6D7 for removing.
• 7upervision of fabrication , erection of euipments and piping
• Assure the work is carried out as per % , I6Ds& layouts drawings , isometrics
7electing -rane or fork lift or telehandler or #oom Truck as reuired for lifting by calculations
, correct estimation& depends on load and shape
• eviewing stamped and finalized drawings (including piping plans and sections& pipingisometrics& piping supports& tank and vessel layouts and details& etc.
7upervising during loading and unloading the %6D7& -ontrol Ealves by -rane , *ork lift.
eceiving Ealves from the workshop and delivering to the site area.
• eviewing and monitoring all material deliverables from materials store.
• esponsible of #olt Toruing , Tensioning of flanged 5oints
'anage all the spare parts
%ob 1itle: Pi"in' "ervi$or
Perio&: 0ov ;9C: 1 'ay ;9C>Com"an): 7hah -onstruction -ompany %vt. 3td
%ob #e$"on$ibilitie$:
• To study the isometric drawing received from the clients and to identify the pipelines carry out the
inspection works.
• -heck flow direction arrows on valves verify that they are properly identified and valves are
installed in accordance with flow direction.
• !nsure that pipe supports& hangers and guides have been installed in accordance with the pipingdrawings and the pipe support details.
• 7upervise and Inspection of cold and hot insulation& cladding on piping and euipment.
• -onduct safety walk through in the site in co/ordination with the safety department on weekly basis.
%ob 1itle: nternee En'ineer 4 2niversity internship
Perio&: Fune ;9C@ 1 August ;9C@& Fuly ;9C:/ Gct ;9C:
Com"an): Beavy 'echanical -omple" %akistan 4'anufacturing -ompany/
(ajor *tie$ an& #e$"on$ibilitie$
'aintained and updated structural drawing register for every pro5ect having details on issued sketches
and drawings.
!nsured correctness of e"clusive drawings& sketches and referred documents.
%rovided drawings and sketches only after sanction.
%repared drafts for structural design drawings.
%ob 1itle: (echanical C En'ineer
Perio&: 0ov ;9C: 1 'ay ;9C>Com"an): +ulfababeel
%ob 1itle: nternee (echanical En'ineer
Perio&: Fune ;9C; 1 August ;9C;& Fune ;9C@ 1 August ;9C@& Fuly ;9C:/ Gct ;9C:
Com"an):Beavy 'echanical -omple" %akistan
4'anufacturing -ompany
/
7/26/2019 Mechanical QC (Aramco Approved)
http://slidepdf.com/reader/full/mechanical-qc-aramco-approved 4/5
!nsured all drawings comprise of reuired design details.
-reated barge anchor design arrangements in compliance with guidelines from company
-ollected e"isting euipment measurements and other necessary data essential for preparing drawings.
nternee (echanical En'ineer:
7upervising After -asting and forging& heavy weight products (+ears& 7haft etc. replace to machine
shop by +antry crane 7upervising during product manufacturing in machine shop& -hecking of all production like different
material for different companies.
3oading and unloading heavy products by +antry -rane or by fork lifter
7upervising during the fabrication& 06T (2T& 'T& %T and impact& tensile& compressive& Bardness
(ockwell& #rinell& Eicker tests 'achining pro5ects.
%ob 1itle: nterne iel& En'ineer 4*or 2niversity *inal Hear %ro5ect/
Perio&: 7ep ;9C@ 1 Fune ;9C:
Com"an): %akistan %etroleum 3imited (%%3& 'andra *ield& %akistan 4Gil , +as 7ectorProject: &hi 42,-22/ # 4Achievement of 8ell Tra5ectory by using 6irectional 6rilling
Techniues/
#e$"on$ibilitie$:
• Identifies the work that is to be completed
• !nsures that all potentially hazardous work is controlled and properly authorized4
• !nsures that all hazards associated with the work have been identified
• !nsures that all necessary safety procedures for controlling the risks are properly implemented while
the work is being completed4 and&• !nsures that the worksite is left in a safe condition when the work is completed or suspended.
Wor a$ *e$i'n En'ineer a$ a reelancer
Com"ter ill$
En'ineerin' ""lication otare:
• 'atlab
• %ro/!ngineer 8ildfire :.9/>.9&
• Auto-A6• Abacus
• 7ankey Tool
(i$cellaneo$:
!"cellent computer using and internet searching 7kill '7 Gffice& 8indows
J%)K?& 8indows =& and 8indows ?. 'any more
Per$onnel ill$:
• 3eadership
%ob 1itle: nterne iel& En'ineer 4*or 2niversity *inal Hear %ro5ect/
Perio&: 7ep ;9C@ 1 Fune ;9C:
Com"an): Thermal %ower %lant& 'uzaffargarh
7/26/2019 Mechanical QC (Aramco Approved)
http://slidepdf.com/reader/full/mechanical-qc-aramco-approved 5/5
• !"cellent communication and interpersonal skills.
• Ability to solve problems
• !"cellent leadership ualities and keenly interested to work in a team.
• 7elf/motivated& %ersistent& -reative& 6edicated& and Adaptable.
E&cational ac'ron&:
(; in (echanical En'ineer Contine
2niversity of !ngineering ,Technology (<E1 Ta"ila %akistan
;c (echanical En'ineerin':
2niversity of !ngineering ,Technology (<E1 Ta"ila %akistan P: 3;=5>=;00
;c Pre-En'ineerin':
+overnment 7cience -ollege 'ultan %un5ab %akistan 88;,8?
(atriclation:
+overnment %ilot Bigh 7chool 'ultan %un5ab %akistan 88?
@obbie$ A@ealth) ctivitie$
• #adminton
• Athletic 7ports
• 7pending time with friends
Per$onal Proile
• *atherDs 0ame 'ian 7aeed Ahmed
• 'arital 7tatus 7ingle• 6ate of #irth =th 7eptember& CKKC
• 0ationality %akistani
• %hone +92-0332-7785086
• !mail am ee ra h s a n 74 8 @ g m ail.c o m