Page 1: Mechanical biological treatment  - solution or hype?

MECHANICAL BIOLOGICAL TREATMENTSolution or Hype?

A world leadingenergy and climatechange consultancy

Dr. Adam Read – Practice DirectorWaste Management & Resource Efficiency, AEA

AWMA 201219th – 22nd JuneSan Antonio, Texas

Page 2: Mechanical biological treatment  - solution or hype?

Overview ….. In 20 minutes ….

+ Personal Welcome

+ UK Waste Situation- Drivers, Legislation, Targets….

+ What is Mechanical Biological Treatment (MBT)?

+ The role of MBT?

+ MBT development in UK

+ MBT Composts and Digestates

+ Waste Composition changes?

+ Conclusions …

2

Page 3: Mechanical biological treatment  - solution or hype?

A personal welcome

+ Adam Read- Practice Director @ AEA - 17 years of operational expertise in waste technology appraisal, design

and procurement- Staff of 75 plus consultants (UK and US)- Leading MBT procurement for a number of UK authorities- Specialise in waste infrastructure siting and community liaison

+ Role on the project- Project Director and lead policy advisor to the Essex Waste

Partnership, North London Waste Authority & West Sussex County

+ Acknowledgements- Andy Godley as lead author and UK leading specialist on MBT

technologies, their application and monitoring- Chris Hoy as co-author and lead modeller

3

Page 4: Mechanical biological treatment  - solution or hype?

My sponsors …. www.aeat.co.uk

Page 5: Mechanical biological treatment  - solution or hype?

5

Our US sponsors

+ We are here exhibiting with ERG

- we acquired them in 2010+ Come and see us on Booth #118

- ERG and AEA Technology Group+ Franklin Associates (ERG division)

- extensive experience in all aspects of solid waste management (over 30 years of practice)- integrated solid waste master plans- full life cycle analyses of solid waste- waste stream evaluations for local,

regional, state, and national agencies

Page 6: Mechanical biological treatment  - solution or hype?

The UK Waste situation

6

Page 7: Mechanical biological treatment  - solution or hype?

The EU Landfill Directive

+ EU Landfill Directive – mitigating landfill’s environmental impacts- BMW reductions required to mitigate fugitive CH4 emissions- Pre-treatment of landfilled materials- Landfill waste acceptance criteria (WACs)- Landfill design, operation, completion and closure requirements

+ BMW includes commercial and industrial wastes and municipal waste streams

+ BMW Landfill targets for the UK- 75% of 1995 level by 2010- 50% of 1995 level by 2013- 35% of 1995 level by 2020

+ Significant driver for innovation in technology solutions7

Page 8: Mechanical biological treatment  - solution or hype?

The Need For Change in the UK (MSW)

0

10

20

30

40

50

60

20

03

20

04

20

05

20

06

20

07

20

08

20

09

20

10

20

11

20

12

20

13

20

14

20

15

20

16

20

17

20

18

20

19

20

20

Mil

lio

ns

to

nn

es

pe

r a

nn

um

Non-biodegradable Municipal Waste

Biodegradable Municipal Waste Requiring Diversion

Biodegradable Municipal Waste Allowed to Landfill

Page 9: Mechanical biological treatment  - solution or hype?

Government ‘Waste’ Objective

Annual reduction in GHG emissions of 9.3 million tonnes of CO2 equivalent per year

Equivalent to annual use of 3 million cars!

Closure of most of the 8,000 licensed facilities

Procure, design & build a suite of new treatment facilities!!

Need to identify bankable solutions / technologies

Page 10: Mechanical biological treatment  - solution or hype?

The UK Recycling Agenda

+ UK Policy- Derived from EU Directives - Encourage Recycling and Recovery including

EfW- Discourage Landfill

+ UK Recycling targets- Revised Waste Framework Directive

(2008/98/EC)- 50% by 2020 - Set nationally at 60% in Scotland, Wales and

Northern Ireland- Currently recycling 42% (2010-11)- Need to increase diversion

o@ curbside or @ treatment facility ?10

Page 11: Mechanical biological treatment  - solution or hype?

11

The Energy situation in the UK

+ Commitment to CO2 Reduction

+ Commitment to Renewable Energy

+ Ageing Nuclear Capacity

+ High gas and oil prices (security risks)

+ Dwindling home production of oil and gas

+ Rising population ~20m by 2070

+ Equates to a potential Energy Crisis- Extracting energy from waste seen to be a positive contribution!- But EfW (capped at 20% of MSW)- Looking at expansion of Biogas & Solid Recovered Fuel production

Page 12: Mechanical biological treatment  - solution or hype?

12

The growth of AD solutions

+ AD has historically been used in sewage treatment

+ Use of biogas is a major bonus

+ Now recognised as an option for generating ‘value’- recognised and actively promoted

oUK Government AD Road Map & Action Plano ROCs incentive for electricity generation (x2)o Renewable Heat Incentives (feed in tariffs)

+ Feedstocks- Food waste & farm wastes- Residual wastes (yes but poorer quality)

+ Commonly being linked with fuel preparation technologies- Like MBT!

Page 13: Mechanical biological treatment  - solution or hype?

13

Revised Waste Framework Directive

+ 2008/98/EC

+ Waste Hierarchy

+ Recycling Targets – 50% by 2020

+ End of waste status – CLO from MBT not applicable- Drives greater quality in collection & processing ….

Page 14: Mechanical biological treatment  - solution or hype?

14

The ‘residual waste’ debate

+ EfW v MBT – only realistic options currently out there!

+ EfW - Incineration has bad public image and planning permission difficult- Involves combustion of all waste with limited recovery- Combustion is single use- Only exploits energy content of waste- Low cost but irreversible

+ MBT- Greener image and planning is easier- High recycling and exploits carbon chemical value as well as energy- High flexibility to offer best value- Can preserve other nutrients in CLO (N, P, S)- High cost but more flexible

MBT is gaining popularity in the UK!

Page 15: Mechanical biological treatment  - solution or hype?

15

Scale of MBT application in Europe

+ MBT has provided a substantial contribution to EU waste management practices since 1990

+ 330 major MBT facilities in EU

- mainly Spain, Italy, Germany+ 450 major MBT facilities in EU by 2016 (expected)

+ UK

- About 20 major facilities (<50,000 tpa) are operational- More than 20 planned or under construction- Combined capacity ~ 4,000,000 tpa- Selected as more politically acceptable and reduces the

need for a thermal facility by 50%

Page 16: Mechanical biological treatment  - solution or hype?

What is MBT?

16

Page 17: Mechanical biological treatment  - solution or hype?

17

MBT is ….

+ Combination of Mechanical separation and Biological Treatment (composting and/or anaerobic digestion)

+ Processes may include multiple steps in any order and produce a variety of outputs dependent on the MBT design

+ Possible outputs:- Metal recyclables- Glass recyclables- Plastic recyclables- Compost like output (CLO)- Biogas energy- Solid fuel (SRF or RDF)- Biostabilised waste- Residues

Page 18: Mechanical biological treatment  - solution or hype?

MBT solutions

18

Page 19: Mechanical biological treatment  - solution or hype?

MBT – design can hide all process types

19

Page 20: Mechanical biological treatment  - solution or hype?

More MBT

20

Page 21: Mechanical biological treatment  - solution or hype?

MBT outputs

21

Page 22: Mechanical biological treatment  - solution or hype?

The role of MBT?

22

Page 23: Mechanical biological treatment  - solution or hype?

23

Role of MBT

+ Landfill and Recycling Targets are being achieved through

- Composting garden waste- Collection recyclables (e.g. plastics, glass, metals) as source

segregated or co-mingled and separated in MRF- Promotion of food waste collections and AD

+ This leaves residual “black bag waste” ~40 - 50% of MSW

+ Simple choice

- Thermal Treatment (Energy from Waste) or MBT+ MBT often seen as more acceptable to public

- Not a burner & reduces tonnage going to thermal treatment- No chimney!

Page 24: Mechanical biological treatment  - solution or hype?

MBT solutions in the UK

24

Page 25: Mechanical biological treatment  - solution or hype?

25

UK MBT Development (options)

+ MBT with Biodrying and SRF Production- several established and in construction/procurement

+ MBT with RDF and AD- many in procurement

+ MBT with Biostabilisation- a few in construction and procurement

+ MBT with rapid composting and recyclate production- a few in operation

+ MBT with AD and recyclate recovery- one in construction

+ MBT with RDF and composting- None

Page 26: Mechanical biological treatment  - solution or hype?

26

Biodrying MBT

Biological step: Short composting

2-4 weeks. Drying limits degradation

Mechanical step: Refining

SRF and recyclate recovery

CO2, Moisture

O2

MetalsGlass/Aggregates

SRF (has BMW)

Optional Re-wetting and composting

residue

Residue (has BMW)

Biostabilised Residue

Page 27: Mechanical biological treatment  - solution or hype?

27

MBT with RDF and AD

Biological step: Anaerobic Digestion

Mechanical step: Refining

RDF and recyclate recovery

Biogas/energy

MetalsGlass/AggregatesPlastics

RDF (has raw BMW)

Digestate(partially biostabilised)

Page 28: Mechanical biological treatment  - solution or hype?

28

MBT for Bio-stabilisation

Biological step: Extended

composting 6-12 weeks

Mechanical step: Refining and

recyclate recovery

CO2, Moisture

O2

MetalsGlass/AggregatesPlasticsPaperCLOResidue

Page 29: Mechanical biological treatment  - solution or hype?

29

MBT for Rapid composting and recyclate

Biological step: Rapid high rate composting 1-2

weeks

Mechanical step: Refining and recyclate

recovery

CO2, Moisture

O2

MetalsGlass/AggregatesPlasticsPaperPartially biostabilised CLOResidues

Page 30: Mechanical biological treatment  - solution or hype?

30

MBT with AD and recyclate

Biological step: Anaerobic Digestion

Wet Mechanical step:

Biogas/energy

MetalsGlass/AggregatesPlastics

Digestate(partially biostabilised)

(Paper included in AD feed as well as food waste)

Page 31: Mechanical biological treatment  - solution or hype?

31

MBT with RDF and Composting

Biological step: Composting4-8 weeks.

Mechanical step: Refining

RDF and recyclate recovery

CO2, Moisture

O2

MetalsGlass/AggregatesCLO

RDF (has raw BMW)

Biostabilised Residue

MetalsPlastics

Page 32: Mechanical biological treatment  - solution or hype?

MBT compost and digestate

32

Page 33: Mechanical biological treatment  - solution or hype?

33

MBT compost like outputs (CLO)

+ Potential MBT outputs - CLO has significant potential for recycling to land/land reclamation (but

an uncertain market)- Many MBT designs could produce CLO if market was available- Stabilised compost CLO also counted

+ Previously in UK this could contribute to recycling targets under NI192 (recently abolished)- New definition of recycling is coming (CLO wont count)

+ Significant tonnage of CLO produced in UK but rationale no longer pertinent- Could see a switch in MBT design ….- Less CLO production and increase in MBT with AD because of the energy

agenda….

Page 34: Mechanical biological treatment  - solution or hype?

34

MBT compost like outputs (CLO)

+ Revised Waste Framework Directive (2008/98/EC)- Likely that CLO will not attain “End of Waste Status” as from mixed source

oCLO then would not count towards recyclingoRecent selling point for MBT with AD of digestate recycling invalidoWhat happens to digestate from existing MBT with AD facilities?o Potential increase in source segregation of organic waste to obtain

end of waste status of digestate, e.g. food waste removal for separate AD

- Impact on UK MBT facilities? oThose with AD? – loss of good food waste feedstockoThose with composting? – loss of feedstock for biostabilisation and

biodrying- Takes the B out of MBT and MBT concept redundant

oPotential concern that significant investment in MBT infrastructure in UK to be undermined!

Page 35: Mechanical biological treatment  - solution or hype?

The global recession

+ Has also had a significant impact on UK waste management

+ Reduced need / feedstock for residual treatment- 5% reduction in waste arisings year on year (2008 – 2011)- Some authorities have reported 10% reductions in some years

+ End markets for SRF are under threat - Cement kilns are taking less waste derived feedstock- Postponement of developments with integrated SRF & CHP- Postponement of merchant SRF-EfW developments- Increasing competition for SRF outlets (insufficient SRF utilising capacity)

+ Solutions:- Procure your own SRF using facility (as in West Sussex)- Export SRF - possible but stringent consent condition (Shanks to Germany)- Landfill the SRF!! (seems at odds with the rationale for MBT!)

35

Page 36: Mechanical biological treatment  - solution or hype?

36

Export the SRF

+ Export Consent required from Environment Agency

+ High quality of SRF required - must be free of hazardous contamination- but definition of contamination is not specific

+ Any export batch may be inspected

+ High risk of adverse publicity and fines if batch rejected

+ Also subject to economic recession

+ UK currently exports 300,000 tpa- Over 1 M tpa is licensed (Holland, Germany, Denmark etc.)

+ Recent permits for Sita to export to Rotterdam / Amsterdam- To fill up the spare capacity in their EfW facilities- Lose of UK resources and energy potential – seems nuts!

Page 37: Mechanical biological treatment  - solution or hype?

37

The Essex Waste Partnership

+ Residual Waste Treatment for ~380,000 tpa

+ Preferred technology MBT – No Waste Incineration Policy!

+ Objectives:- - Meet BMW diversion targets & minimise total waste landfilled- Maximise recovery of recyclables- Exploit SRF if markets become available (none currently)

+ MBT biostabilisation system that can switch to produce SRF- Maximise decomposition of biodegradable waste (LOI & biogas reduction)- Maximises moisture loss- Maximises and flexible recyclables – metals, plastics, aggregates, CLO- Flexible to switch operation to produce SRF if markets available

+ Acceptable redundancy of equipment in different operational modes….. A significant investment but retains flexibility!

Page 38: Mechanical biological treatment  - solution or hype?

Essex County @ procurement

+ Predicted contract value of £2.5 billion over 25 years (PFI)

+ Demonstrating savings of £300m (compared to do nothing)

+ Carbon benefits of 2.4 million tonnes of CO2 saved

+ In built switching capability believed to cost an additional £80 million

+ Real costs will be known in July 2012 @ preferred bidder

38

Page 39: Mechanical biological treatment  - solution or hype?

What might it look like?

39

Page 40: Mechanical biological treatment  - solution or hype?

Waste Composition Changes?

40

Page 41: Mechanical biological treatment  - solution or hype?

41

Waste Composition Changes

+ Residual waste composition is variable and will change!- Changes in waste generation (efficient use of products)

o less waste - Changes in consumer products & packaging

o changing type, size, density etc.- Changes in source segregation

o removal of materials from feedstock (food)

+ MBT flexibility comes at a cost!- High level of waste composition detail needed for MBT design

o content and type of components such as plastic film dense plastic, PVC plastic, food waste, metals – to set targets and design equipment

- High flexibility to meet all composition change risko complex and costly plant

- Low flexibility to meet all composition change risko simpler plant, lower cost, but at risk of being made redundant

Page 42: Mechanical biological treatment  - solution or hype?

42

Composition risks

+ MBT plant failure?- Examples known where waste composition has fallen outside MBT

design parameters before the plant has become operationalo From design & contract award to operations can take 3 or 4 years

- Build in redundancy of equipment to accommodate changes in waste composition or retrofit equipment to keep pace with changes in waste composition!o Expensive

+ EfW plant failure?- Waste composition is less important

oOnly concern is calorific value - Less susceptible to residual waste composition changes- Lower risk for investors & decision-makers ….

Page 43: Mechanical biological treatment  - solution or hype?

43

MBT Procurement & composition risk

+ Lengthy discussion on waste composition impacts- Balance of cost vs. flexibility- Need good data @ outset- Need to model impacts of changes and the flexibility of proposed

solutions

+ Transfer waste composition risk to technology provider- Must treat waste provided effectively whatever its composition- Comes @ a cost

+ Control of feedstock quality for residual waste stream- Facility must deal effectively with residual waste whatever its

composition

Page 44: Mechanical biological treatment  - solution or hype?

Conclusions

44

Page 45: Mechanical biological treatment  - solution or hype?

45

Conclusions+ MBT often selected as more acceptable to public (and

politicians) than EfW

+ MBT is playing a significant and growing contribution to UK waste management

+ Various designs of MBT exist with increasing emphasis on MBT with AD (fits UK Renewable Agenda)

+ MBT derived composts and digestates do not qualify as recycling – undermining some of the earlier plans!

+ MBT is sensitive to changes in waste composition

+ MBT flexibility comes at a cost – but needs to be addressed @ outset

+ Potential that many UK plants will prove costly to remain functional to keep pace with future waste situation

Page 46: Mechanical biological treatment  - solution or hype?

Lessons for the US

+ Switching technologies needs careful analysis

+ Solving 1 priority may create problems elsewhere in the system

+ Look @ joining up the agendas (energy, resources, waste etc.)

+ Don’t choose MBT to boost recycling or deliver quality composts!

+ Fuel preparation is a valid role for MBT prior to EfW, Cement Kilns, Advanced Thermal Solutions

+ Learn from the UK’s experiences ….46

Page 47: Mechanical biological treatment  - solution or hype?
Page 48: Mechanical biological treatment  - solution or hype?

48

Thank you!

Page 49: Mechanical biological treatment  - solution or hype?

Come and see us …. Booth #118

Adam Read

Practice Director - AEA

Waste Management & Resource Efficiency

cell: 0044 7968 707 239

email: [email protected]

web: www.aeat.co.uk

Shelly Schneider

Franklin Associates (ERG)

Waste Management & Resource Efficiency

tel: 913-800-8276

email: [email protected]

web: www.aeat.co.uk