Measure Square Commercial Edition User Guide 1/5/2016 Contents 1. About Measure Square Corp. ........................................................................................................ 4 2. What Can MeasureSquare Do? ..................................................................................................... 4 3. How to Evaluate 30-Day Trial ........................................................................................................ 4 4. Contact us...................................................................................................................................... 5 5. Getting Started .............................................................................................................................. 5 5.1. Download and install MeasureSquare .................................................................................. 5 5.2. Register MeasureSquare ID................................................................................................... 6 5.3. Four steps to estimating a project ........................................................................................ 7 5.4. User interface introduction ................................................................................................... 8 6. Plan Import and Trace Rooms ....................................................................................................... 9 6.1. Import a plan ......................................................................................................................... 9 6.2. Set plan scale ....................................................................................................................... 10 6.3. Add multiple floors .............................................................................................................. 11 7. Plan Takeoff (Room Drawing) ..................................................................................................... 12 7.1. Freedraw a room ................................................................................................................. 12 7.2. Draw a rectangular room .................................................................................................... 13 7.3. Create rooms based on existing walls ................................................................................. 14 7.4. Add a doorway and a window............................................................................................. 15 7.5. Add a staircase .................................................................................................................... 16 7.6. Add an elevation ................................................................................................................. 18 7.7. Creating border dividers ..................................................................................................... 19 7.8. Creating internal wall .......................................................................................................... 20 7.9. Creating curved walls .......................................................................................................... 23 7.10. Divide floor in to regions to receive different products.................................................. 23

Upload: others

Post on 06-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

Measure Square Commercial Edition

User Guide

1/5/2016

Contents 1. About Measure Square Corp. ........................................................................................................ 4

2. What Can MeasureSquare Do? ..................................................................................................... 4

3. How to Evaluate 30-Day Trial ........................................................................................................ 4

4. Contact us ...................................................................................................................................... 5

5. Getting Started .............................................................................................................................. 5

5.1. Download and install MeasureSquare .................................................................................. 5

5.2. Register MeasureSquare ID ................................................................................................... 6

5.3. Four steps to estimating a project ........................................................................................ 7

5.4. User interface introduction ................................................................................................... 8

6. Plan Import and Trace Rooms ....................................................................................................... 9

6.1. Import a plan ......................................................................................................................... 9

6.2. Set plan scale ....................................................................................................................... 10

6.3. Add multiple floors .............................................................................................................. 11

7. Plan Takeoff (Room Drawing) ..................................................................................................... 12

7.1. Freedraw a room ................................................................................................................. 12

7.2. Draw a rectangular room .................................................................................................... 13

7.3. Create rooms based on existing walls ................................................................................. 14

7.4. Add a doorway and a window. ............................................................................................ 15

7.5. Add a staircase .................................................................................................................... 16

7.6. Add an elevation ................................................................................................................. 18

7.7. Creating border dividers ..................................................................................................... 19

7.8. Creating internal wall .......................................................................................................... 20

7.9. Creating curved walls .......................................................................................................... 23

7.10. Divide floor in to regions to receive different products.................................................. 23

Page 2: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

7.11. Bath room takeoff using divide floor and split room command ..................................... 26

7.12. Crop rooms inside another room to create an open floor plan ...................................... 29

7.13. Merge selected rooms .................................................................................................... 30

7.14. Insert holes on floors....................................................................................................... 31

7.15. Add a note and handwritings .......................................................................................... 32

7.16. Add a line segment .......................................................................................................... 33

7.17. Review and modify properties of rooms, doorways, elevation etc. ............................... 34

7.18. Search a room on diagram .............................................................................................. 35

7.19. 3D view ............................................................................................................................ 35

7.20. Export plan as AutoCAD file ............................................................................................ 36

7.21. View Options and Edit Tools ........................................................................................... 36

8. Product Assignment .................................................................................................................... 37

8.1. Manage master product database ...................................................................................... 38

8.1.1. Manage product database structure .......................................................................... 38

8.1.2. Add or delete products in master product database .................................................. 40

8.1.3. Relocate a product to another folder ......................................................................... 43

8.1.4. Create multiple product databases ............................................................................. 43

8.2. Create project-level product list ......................................................................................... 44

8.3. Applying flooring products (carpet, vinyl, tile, hardwood, laminate, etc. ) to rooms by

drag-and-drop method ................................................................................................................... 45

8.4. Apply a linear base product to room perimeter and single wall segment .......................... 46

8.5. Apply transition on doors or on border of different products ............................................ 48

8.6. Apply subfloor underlayment ............................................................................................. 50

8.7. Associate product with add-on items ................................................................................. 50

8.8. Apply heat welding rod on borders of sheet vinyl and swim lanes .................................... 53

8.9. Remove product assignment .............................................................................................. 54

8.10. Room view ....................................................................................................................... 55

8.11. Wall stack design ............................................................................................................. 56

8.12. Wall profile ...................................................................................................................... 61

8.13. Room Profile .................................................................................................................... 63

8.14 Tile Pattern Editor ................................................................................................................... 65

9. Seam Layout and Estimation ....................................................................................................... 69

9.1. Review estimation data ....................................................................................................... 69

Page 3: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

9.2. Estimate by floor ................................................................................................................. 70

9.3. Change layout direction for roll goods ................................................................................ 71

9.4. Seam manipulation ............................................................................................................. 73

9.5. Cut sheet manipulation ....................................................................................................... 76

9.6. Pattern carpet layout setting .............................................................................................. 77

9.7. Control estimation settings for roll goods .......................................................................... 79

9.7.1. Set Project-level estimation criteria ............................................................................ 79

9.7.2. Set System-level estimation criteria............................................................................ 81

10. Export Estimation Data to Worksheet .................................................................................... 83

11. Project Printout and Report .................................................................................................... 85

12. Synchronize to M2 Cloud ........................................................................................................ 87

13. License Control ........................................................................................................................ 88

14. System Setting ......................................................................................................................... 89

Page 4: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

1. About Measure Square Corp.

Measure Square Corp. was founded in 2001 with a mission to create the best measure estimating

software on the best computer platforms available. Over the years, generations of its products have

shaped the way that measuring estimating is being done, with efficiency, accuracy, and professional

results.

Since the company’s inception, the customer base grew from zero to 3000+ businesses. Customers

range from national firms such as Sherwin Williams, Redi Carpet, and FCI to regional multi-location

operations like RiteRug, R.C.Wiley, B.T.Mancini, Acousti Engineering Corp. and installers for Home

Depot and Lowe’s to small retail stores in the United States, Canada, the United Kingdom, Australia,

New Zealand, and South Africa.

2. What Can MeasureSquare Do?

Designed for commercial flooring contractors, M2 commercial handles takeoff, estimating and

layout on blueprint plans for carpet, tile, vinyl, wood, laminate, and add-on items such as pad, base,

transition, welding, labor items for multi-family and large commercial jobs.

Key features:

o Batch import and scale blueprints from PDF,CAD and other formats

o Takeoff floors, regions, walls and ceilings with product assignments

o Specify flooring products, add-on line and labor items by drag and drop

o Estimate product quantities and seam layout with optimize cut waste and seam locations

o Generate a clean cut sheet and seam diagram for installers

o Print to blueprint scale with details, email or export report in Excel, PDF.

3. How to Evaluate 30-Day Trial

Follow the instructions below to deploy Measure Square program

o Step 1: Verify system requirements

o Windows 7,8, or 10 (32/64 bit)

o Step 2: Download program and register 30-day trial account

o Download 30-day Trial here

o Register M2 ID and trial account

Page 5: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

o Step 3: Watch video tutorials and sign-up for a Demo

o Sign up for a free webinar with live Q& A by calling or emailing us.

o Watch our self-learning video tutorials

o Step 4: Subscribe

o Monthly payment, no contract

o Updates and support included

o Onsite and web training available: http://www.measuresquare.com/training

4. Contact us

5. Getting Started

5.1. Download and install MeasureSquare

Follow instructions below to download and install MeasureSquare on your PC

Download a 30-day Trial from here

North America:

Australia, New Zealand, United Kingdom:

-Customer support hotline: 1-626-683-9188 M-F 8am-5pm Pacific Time

-Submit your questions from the web: http://www.measuresquare.com/support.html -Email support staff: [email protected]

MeasureSquare

221 E Walnut St, Suite #110 Pasadena, CA 91101

Australia Office (Australia, New Zealand)

PO Pox 2144, Woorim, Bribie Island, QLD, 4507, Australia

AU: +61 7-3166-9128 [email protected]

NZ: +64 9-889-1965 [email protected]

www.measuresquare.com.au www.measuresquare.co.nz UK Office (Great Britain)

Unit 13b Brindley Court, Dalewood Road Lymedale Business Park, Newcastle Under Lyme Staffordshire, ST5 9QH, UK

+44 0125-491-6139, 0161-298-1965

[email protected]

www.measuresquare.co.uk

Page 6: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

After the download is complete, double-click the MeasureSquare installation file to start

installation wizard. Click Next to start installation. Follow instructions to finish installation.

After installation is completed, double-click icon on your desktop to launch

MeasureSquare program

5.2. Register MeasureSquare ID

When launching MeasureSquare for the first time, you are prompted to register a MeasureSquare

ID.

Why you need to create a MeasureSquare ID (M2 ID)

M2 ID works like an Apple ID that you use it to identify yourself and sync diagrams with other iOS

devices, such as iPad and iPhone, as it enables you to store data on M2 cloud when using sync

function of M2 program.

M2 ID also enables you to use network features such as

synchronizing projects and product database to M2 cloud

sharing projects and product catalog

How to register M2 ID?

Open Measure Square program and click Register for free trial to create a M2 ID and

password

Page 7: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

Enter a valid email address and contact information. Click Register.

After signing up, check your email and proceed to activate your M2 ID by clicking the

activation link from the confirmation email sent to your registered email address.

After activation is completed, open MeasureSquare program again, sign in with your M2 ID

(email used to register) and password, and click Login button.

5.3. Four steps to estimating a project

Step 1: Import Plans and Trace Rooms

Import PDF plans and establish scale (PDF, TIF, GIF, JPG, CAD files are supported)

Set up product schedule with color coding for surface products (carpet, sheet vinyl, ceramic,

VCT, wood, laminate), with add-on line items

Trace room areas, perimeters, walls/ceilings

Step 2: Assign products and Add-on Details

Visually drag and drop products and add-ons to room area, walls including pad, base,

transition, welding, labor charges, etc.

Add details such as borders, doors, stairways, island, cabinet, tile patterns, flash cove

Use multiplier for multiple units or floors

Verify product assignments in 2D and 3D on floor and walls.

Step 3: Layout/Estimate

Page 8: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

Calculate product and add-on item quantities, linear length, waste ratio, in seconds

Optimize seam location, layout direction, cut waste, and match pattern carpet across rooms

Re-estimate instantly with product changes

Step 4: Generate a Quote and Report

Print estimation report, cut sheet, seam diagram, and floor plan with product color coding

for clients and installers.

Create quotation, work order and invoice forms

Export estimation to PDF and Excel

5.4. User interface introduction

MeasureSquare contains several key components:

1. Start Icon (TOP)-allows to start a new estimate, open an existing project, save an existing

project, print reports, change settings, and synchronize to M2 Cloud in MeasureSquare.

2. Quick Access Tool Bar (TOP) – the most frequently used tools can be placed in this toolbar,

providing the user with easy and constant access to those tools.

3. Workflow Tabs (TOP MIDDLE) –organizes a set of tabs representing estimating workflow

from Project Info, Takeoff, and Worksheet. Some of these tabs appear only when a certain

type of object is selected, providing specific tools for items such as the Freedraw Tool tab.

4. The Ribbon(TOP MIDDLE) – contains groups of toolbars namely Job Info preparation tools,

Takeoff Tools, Estimating tools, Zoom In/Out and so on.

5. Product/Services List and Project Item List Panel (LEFT) shared with Estimating Panel – is

on the left hand side and contains main product and services list, project item list and some

tab functions.

6. Drawing and Layout Area (Middle) – area window for drawing room and material layout,

seam cut layout, cut sheet at lower section.

7. Viewer (Right) – is located on the right of the screen automatically indicates the

room/door/window/stair properties, estimation results, and room list.

Page 9: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

6. Plan Import and Trace Rooms

Often builders, architects and designers send floor plan files electronically in PDF or CAD or image

files, such as jpeg, tiff, etc. The program provides various importing functions to bring these files

into the program and one can then takeoff the areas from the imported image background.

6.1. Import a plan 1. From Takeoff tab, select Import, and select import file types

Supported file formats are:

General image formats: JPG, TIF, GIF, BMP etc.

Dodge plan file: PLN

Master Product

Database

Project Items

Estimation

Tools Bar

Cut Sheet

Viewer

Ribbon

Drawing Area

Quick

Access

Tool Bar

Start icon

Tabs

Page 10: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

Adobe file format: PDF

AutoCAD file: DXF, DWG, DWF

2. At the preview screen, you can:

Crop or rotate an image

Select a desired scale from Blueprint Scale pull-down list

Verify the scale by measuring a known wall segment using the Ruler command to add a

dimension next to a known size and check the scale on the plan.

Select one or multiple pages to import from the right panel

Select desired resolution by dragging the DPI bar.

6.2. Set plan scale

MeasureSquare provides two methods to set up blueprint scale:

Method 1: Select blueprint scale

1. From Takeoff tab, select Import, and select import file types

2. At the preview screen, find Blueprint Scale pull-down list->select desired scale

Crop image Rotate image Ruler

Select scale

Adjust resolution Select

page(s) to

import

Page 11: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

3. Select which pages to import from right panel->click Import to Current Layer

4. Verify the scale with Ruler

Method 2: Use two points to scale a plan

1. From Takeoff tab, find Scale icon -> left-click to start measuring a known size on the

plan such as the doorway or the longest wall-> enter actual size->OK.

2. Verify the scale with Ruler

6.3. Add multiple floors

Residential houses, apartments and commercial buildings may be constructed in multiple floors, the

program provides the function to add and edit multiple floors.

Add a new floor: click green + icon next to main floor tab and enter floor name. Click OK.

Page 12: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

Delete layer: click “x” icon to select delete a floor.

Switch among layers: Triangle icon to pop-up a list of floors, select a floor to switch to that floor.

The highlighted one denotes current floor.

7. Plan Takeoff (Room Drawing)

MeasureSquare provides variable methods to takeoff a plan.

7.1. Freedraw a room To capture irregular shaped rooms and open areas such as hallways and corridors, use the Freedraw

tool to trace around perimeter of the area.

Click Draw icon and left click any corner of a room area to start room tracing.

Click room corners clockwise or counter clockwise to trace perimeter of a room

Right-click to close a room shape

Freedraw runs in continuous mode to capture multiple numbers of room areas until cancelled by a

right-click.

Page 13: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

7.2. Draw a rectangular room

Method 1: Use Rectangular Room command to capture rectangular shaped rooms or area, it

runs on continuous mode until cancelled by a right-click.

Left-click a corner of rectangular area, move to the opposite corner of the rectangular area,

left-click again to finish.

Page 14: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

Method 2: Use Room by size command is for inserting a rectangular shaped room or area by

entering length, width and room label, and it runs on continuous mode until cancelled by right-click.

7.3. Create rooms based on existing walls

MeasureSquare allows users to create a room based on existing walls of connected rooms. As the

example shows below, if the user starts from a corner point, traces the room counterclockwise,

then the green line intersects with existing walls that can form a closed shape, MeasureSquare will

automatically predict the room shape based on existing walls and create a pink contour. Right-click

to convert the pink contour to regular walls. If the pink contour does not look correct, ignore it and

continue to draw.

Page 15: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

7.4. Add a doorway and a window.

From Takeoff tab left-click Door command , mouse over walls with door signs, and left-click

Continue on adding same sized door and with same transitions to all similar door locations in a

batch

Page 16: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

Likewise, one can apply same methodology to add a window to a room by clicking on Window

command and dropping a window to desired location.

7.5. Add a staircase

MeasureSquare supports standard staircases, pie-shaped staircases, spiral staircases and landings.

Users can customize unique staircases by combining different styles of stairways and landings.

To add a standard staircase, click Stairway and click drawing area to drop a staircase.

To configure details of the staircase, left-click to highlight stairway and change its property

on the right hand panel.

Page 17: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

To design L-shaped, U-shaped, winder stairs, or spiral stairs, one can select different style of

landing such as 90 degree turn or 180 degree turn from the submenu .

To connect landing with staircase, user should drag staircase over a landing and allow the

program to automatically “dock” them together.

Left-click stairways and select 3D view to review stairways in 3D.

Page 18: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

7.6. Add an elevation

When doing a takeoff of a plan, users may come across fixtures such as stand-alone walls, counter

tops, shower thresholds, stages and so on, which can be accommodated by the Elevation function.

To add an elevation, click the Elevation command ; trace its contour in a room.

Highlight the elevation by clicking it and change its height in the property panel on the right.

Page 19: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

7.7. Creating border dividers

Many flooring projects have border designs and material specs on those border areas.

Create a Single Border on Room Floor:

Left-click on a room to highlight its boundary.

Click submenu under Floor Divider ->select Create Border Dividers command and enter border Width in the field

2. Click an elevation to

modify its properties, such

as, name and dimensions

Page 20: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

Mark proper checkboxes on Cut Style and Border Type (default recommended).

To apply products to borders, simply drag and drop a product from database to the border.

To remove a Border, select the border and click on Delete command on the ribbon.

7.8. Creating internal wall

To takeoff/draw internal walls from existing base wall,

Left-click on the desired room, go to Takeoff tab and click on Room Option-

>internal wall

Move cursor on the desired wall to locate start point, left click to start drawing, continue on for multiple wall segments

Page 21: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

Here is an example of internal wall takeoff and its 3D view.

Page 22: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow
Page 23: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

7.9. Creating curved walls

To design a curved wall, left-click a room to highlight it and select the Set Arc command. Drag red

diamond handle in the middle of a wall to turn a straight wall into an arc as shown below.

7.10. Divide floor in to regions to receive different products

Page 24: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

It is common in commercial floor design that an open area is designed with patterns and different

colored products. In such a case, a floor area is divided into connected regions using Divide Floor

command from Takeoff tab.

First capture whole area with Freedraw on its inside wall perimeter, then use Divide Floor command to

place floor dividers along each of the border lines of products or patterns.

If there are curves on a dividing line, simply connect two ends of an arc with straight line. Several arcs

may be used to simulate a spline curve), and complete the dividing line.

Page 25: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

To turn segments of dividing line into an arc, select the dividing line that needs to match the curves,

Click Set Arc command, and then pick each middle handle of a segment to convert it into arc.

Page 26: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

Continue on creating the second set of border lines, and turn them into curves. With divided regions,

different colored products can be applied to the regions (as in this flower region case)

7.11. Bath room takeoff using divide floor and split room command

Often commercial flooring involves floor plans with rooms and open areas connect to each other and share walls. Individual takeoff on each room is inefficient and aligning them with shared walls is tedious as well.

Using Floor Divide and Split commands substantially speeds up the process:

Use Freedraw to capture inside perimeter of floor area with batch of rooms connected to each other with shared walls

Click on Room Option->Floor Divide

Connect shared walls (longest walls first, it may cross several rooms), this process divides whole area into divided rooms and open areas regions

Click on Room Option->Split Room , it converts divided regions into individual rooms with shared walls properly aligned automatically

The steps using above example are shown below:

(1) Trace whole floor area with multiple rooms on their inside wall perimeter. Zoom in close to details while drawing.

Page 27: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

(2) Click on Room Option->Floor Divide command Divide longer shared walls first (that crosses multiple rooms), then continue on dividing individual rooms.

Place floor divider on middle section of walls.

Page 28: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

Here is the completed office area with dividing lines.

(3) Click on Room Option ->Split Room command. Then divided regions turn into individual rooms which are aligned on their shared walls and can be independently operated.

Page 29: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

7.12. Crop rooms inside another room to create an open floor plan

There can be “nested rooms” or kiosks inside a bigger open area where these room areas need to be

taken out of the bigger area. Placing rooms inside another room does not automatically deduct the area

underneath, the Crop Rooms command is used to specify the nested room so that the program deducts

the nested area during the estimating process.

To takeoff inside rooms,

Hold down Ctrl key and left-click to select multiple rooms

select Room Option -> Crop Rooms command on Takeoff Tab

Page 30: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

7.13. Merge selected rooms

There are situations that several connected rooms need to be merged into a single room. This can be

done by selecting rooms to be merged, and click on Merge command on Room Tool tab to

complete.

Page 31: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

Below is the merged area after application. All shared walls and internal walls of each merged room are

removed after merging.

7.14. Insert holes on floors

Another tool to create holes or takeout areas is to use one of hole inserting command.

Click on one of command, then directly trace hole area shape within an existing room area. Three types

of hole shapes are available:

Insert Hole: draw a free-shaped hole

Page 32: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

To relocate or remove holes:

Select Move Hole command and drag and move the hole, drop it to relocate.

If dropped right within room boundary and intersected with another hole, the hole merges with the other hole to form a new shape.

Select Delete Hole command and left-click on a hole to remove it

Comparison of Hole Insertion commands with Add Insert command. Both deduct area from underlying floor area or wall. The differences are

Product items cannot be applied to holes and their perimeter

Holes cannot intersect or touch with room boundary

7.15. Add a note and handwritings

To add a note to the plan, click Note command, enter a brief description and drop the note to the

desired location.

Page 33: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

By clicking on Handwriting option, user can insert handwriting into diagram area

7.16. Add a line segment

In many commercial flooring designs, there are straight or curved lines where the linear length needs to

be accounted for. The Segment tool can be used to capture such a linear footage. Linear length

products can be drag-and-dropped to such a line or curved segments.

Page 34: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

For a curved line, use straight line segments to capture each curved segment that can be modeled by an

arc, click to highlight the segments, and then use Arc tool to convert the corresponding segments

into arcs. See example below.

7.17. Review and modify properties of rooms, doorways, elevation etc.

The Property panel retains properties of objects in the drawing area. It displays the object name,

dimension of object, product assignment etc.

Click on Properties icon to open property of highlighted object in the drawing area, such as room, doorway, staircase, elevation, line segment and so on. In addition to reviewing the properties of

selected objects, user can also:

Change dimension/size of selected object such as room size or width of doorway

Change product assignment of selected object

Page 35: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

7.18. Search a room on diagram

Click on icon or use Ctrl-F to pop up a dialog window, and enter full or partial room name to find any matched rooms with highlight color.

7.19. 3D view Product design and assignments on floor are easy to inspect and verify with a 2D layout. As products can

be applied to walls, the 3D visualization feature enables viewing and rotating of floor and wall

assignments in 3D to help verify and communicate this information with customers.

Select any number of rooms on floor to show in 3D (if no room is selected, the whole floor will be

displayed). Click the View 3D command on the Takeoff Tab to enter 3D mode,

Click Properties

icon to review or

modify selected

object in drawing

area

Page 36: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

Left-click Exit to return back to the 2D mode

7.20. Export plan as AutoCAD file

Users can export project file as AutoCAD file by using Export to CAD file command . However, only

the room shaped will be converted. Other details such as product assignments, staircases, doorways,

and windows cannot be converted.

7.21. View Options and Edit Tools

Zoom to fit: zoom to fit all drawings and plan image into current window view

Zoom in: increase the zoom level

Zoom out: reduce the zoom level

View Option: select and configure room drawing and product assignment display options

Grid: show grid lines in drawing area. The grid size can be set in Start menu->system settings-

>measurement tab.

Pan: turn on pan mode, left click and hold to shift drawing objects in current view

Page 37: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

3D View: open room drawing in 3D view; allow rotating and panning drawing in 3D.

Show Wall: Display wall and ceilings in expanded view

Pattern Start Position: Select pattern or tile grid starting point by clicking on a room corner or any

point inside a room/region.

Rotate: Rotate selected object such as rooms, staircases, and elevations.

Undo: undo last action

Redo: redo last action

Copy: copy selected drawing object(s) such as room, segment, count item, plan image and so on

Cut: Cut drawing object(s) such as room, segment, count item, plan image and so on

Paste: Paste copied drawings or image.

Delete: delete selected object(s).

Seam Lock: Lock seams in selected rooms.

Plan Lock: Lock locations rooms in current floor.

Image Lock: Lock blueprint image.

8. Product Assignment

Page 38: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

After the rooms on the floor plan are captured from the takeoff process, the next step is to apply proper

products and related installation add-on items to these room areas as specified by material schedule list,

so they can be calculated by program.

This chapter covers all of the different ways of assigning different types of products and add-on items to

floors, walls and ceiling areas, on their area, perimeter lengths, or vertical walls.

8.1. Manage master product database

The Product and services database is where the user can create products, installation add-ons, and labor

service charge items that are to be applied in takeoff and product assignments process, and then later to

be laid out and estimated. This database should be set up properly before starting any real project that

is to be bid.

8.1.1. Manage product database structure

Default Product/ Services database organizes products with a two-level folder structure:

First level folders, second level folders

Any specific product item must be placed under a second-level folder

User can create third or more levels of folders if needed

Users have the flexibility to organize their product items in many ways based on their takeoff estimating

practice. For example, use first-level folders for major product types, and second-level folders for sub

product types and installation add-on types. See a sample setup below.

Page 39: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

Add first-level folder: Right-click to select Product/Services folder (root folder), select New Folder, and

enter folder name

Add second-level folder: Right-click to select first-level folder, select New Folder, and enter folder name

Page 40: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

To create the third level folder, right-click to select a secondary level folder, select New Folder, and

enter folder name

8.1.2. Add or delete products in master product database

Measuresquare provides a standard product database with generic products, such as broadloom carpet,

pattern carpet, ceramic tile, vinyl sheets, hardwood, laminate and installation materials & labor charges.

User can then modify existing items or add new items to the database.

To access master product database, find Product/Service panel and click “+” to expand

subfolders and contents.

Page 41: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

To modify product database, right-click Product/Services folder and select View/Modify details.

To modify a specific product, right-click a product to review and modify its properties

Page 42: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

To add a new product, first right-click Product/Services folder and select View/Modify details.

Then right-click a target folder and select New Product.

At pop-up window, enter product name and select a product type. Click OK.

To delete a product from master database, right-click a product->select Delete

Page 43: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

8.1.3. Relocate a product to another folder

Users may want to re-organize existing products by re-locating a product to another folder. The easiest

way to do this is to re-name the path of the product.

While in master database->left-click a product->enter correct path. For example, change

“carpet\broadloom” to “carpet\pattern match”. Click Save.

The product will be moved to pattern match folder.

8.1.4. Create multiple product databases

Commercial users may create and maintain multiple databases for different manufactures. Retailers

who have multiple locations may want to maintain products databases based on different regions. To

handle such situations, MeasureSquare allows users to create and maintain multiple product databases.

To create a new product database, left-click triangle icon -> select New Product Database->

enter product database name and click OK. It will create an empty product database.

To switch among different databases, left-click tab with product database name.

Page 44: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

8.2. Create project-level product list

For commercial projects, users often create project-level products based on finished schedule instead of

using existing products in a master database. In this case, users can right-click project item folder->select

View/Modify Details to open a project-level product list.

Similar to setting up a master database, users can create project-level products by right-click Project

Item folder->select New Product and specifying the product type and product name on pop-up dialog.

Page 45: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

Please note that project-level products are saved per project.

8.3. Applying flooring products (carpet, vinyl, tile, hardwood, laminate, etc. )

to rooms by drag-and-drop method

On left product services panel or project item list panel,

Navigate and open any folder to locate product item

Press left mouse key to drag an item, and move it over to room drawing window and over room

to be assigned to (observe mouse cursor turn into apply material icon) show the icon here

While cursor is over the room, the border of the room is highlighted (indicating it is selected and

ready to be applied), left click anywhere inside the room to apply

Dragged item can be repeatedly applied to any other rooms by left clicking in additional rooms

or areas

Right click to cancel product assignment mode (so that apply material cursor disappears)

Page 46: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

Major flooring products (carpet, vinyl, tile, wood, laminates) can be dragged and dropped to the same

room area once, and it will be replaced automatically if another major product is applied over it.

However, underlayment material items can be applied to the same room area multiple times (for

example, pad, adhesive, etc. can be applied to the same floor)

8.4. Apply a linear base product to room perimeter and single wall segment

Some add-on installation products (such as cove base, moldings, transitions, quarter-round, etc.) are

length-based and applied to wall base or room perimeters. In product specification, these items have LF

(or MR in metric) as unit of measurement and their layout type is Add-on Item in product database.

Assign LF (MR) add-ons to wall base:

All wall perimeter: Drag and drop to highlighted perimeter of a room (when mouse over the

room)

Page 47: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

Single wall segment: Drag and drop to ONE highlighted wall segment (when mouse over the wall

segment)

Page 48: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

8.5. Apply transition on doors or on border of different products

Transition items are linear-based products with Unit of Measure (UOM) LF (MR in metric) and Layout

Type as Transitions Item in material spec, are often applied at these situations:

Drag-and-drop on doorways (or, from Properties window of doorway, click on Add)

Drag-and-drop on any dividing line of same room area (so divided areas may transit from one

product to another product

Drag-and-drop to any wall segment next to another room area

Page 49: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

Transitions can be drag and dropped to the door. Or one can add the transition from Properties window

of a doorway.

Transition items are graphically displayed with dashed lines on wall segments being applied. See

example below with red transition applied around perimeter of the countertop and on wall base of the

large open space.

Page 50: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

8.6. Apply subfloor underlayment

Underlayment is a vital factor to the success of the flooring on top of it. A sturdy and smooth surface

underneath every finished flooring material is a must. Without smooth and solid subflooring, the

finished flooring can fail or look very bad in a short span of time. However, some underlayment is

merely used for sound proofing or as a moisture barrier.

Underlayment products are specified with area-based Unit of Measurement SF or SY (SM in metric) and

Layout Type as Underlayment Item in estimating spec part of product database.

Assigning underlayment item is the same as applying other area-based add-on products by drag-

and-drop to any room area.

Multiple different area-based items can be applied to the same area on top of each other

Note: Underlayment items can be associated with a major flooring product under its add-on list in

product database, and get automatically applied when that major flooring product is applied.

8.7. Associate product with add-on items

Page 51: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

In flooring estimating, installing major covering materials requires installation add-on items as well as

labor costs to get the job done. This can be accomplished by associating add-on items and labor items

with major covering product.

Steps to Associate Product Add-ons:

Select the add-on item, check Is Add-on check box in product detail window

Select the primary item, and then click green “+” button (as depicted below)

Page 52: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

Pick up the required add-on item, and specify add-on method. Click OK to save selections.

Selected add-on item then shows under Product Add-ons section

Page 53: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

8.8. Apply heat welding rod on borders of sheet vinyl and swim lanes

Heat welding rod is measured by linear length and is normally applied under border lines of different

color sheet vinyl (by drag-and-drop manually, see screen below)

Swim lanes of sheet vinyl cuts in same floor area. It must be set with sheet vinyl item as an associated

add-on item by seam length method. Refer to section in product database setup chapter.

Page 54: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

When properly assigned, linear length usage of heat welding rod is calculated automatically in later

layout estimating stage

8.9. Remove product assignment

Remove area item from floor or walls: Drag and drop area eraser to highlight area with product

assignment.

Remove LF item from wall perimeter or wall segment: Drag and drop Linear Eraser to

highlighted room perimeter or segment from lower section of product list panel.

Remove EA item: Drag and drop EA eraser to target object to remove all count items.

Page 55: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

8.10. Room view Rooms view retains expansion status at the room and floor level. It displays Room labels Attachment

labels, line segments alphabetically under Room View.

Select Room View command on right panel to open list of rooms.

Page 56: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

To select multiple rooms in the Room View by holding down on the CTRL key on the keyboard and

clicking on the desired rooms. The corresponding rooms in the floor plan will be selected. Conversely,

rooms selected in the floor plan will also be selected in the Room View.

To switch among layers in Room View, click on folder with layer’s name

8.11. Wall stack design

Advanced wall design with details can be achieved from wall stack design commands.

Step1: Display expanded walls in drawing area by turning on View Wall command on Takeoff tab. To

display walls on right, select Show walls on right side in view options menu

Page 57: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

Step2: Make wall selection. Select a single wall from wall by left-click on a wall in expanded view.

Selected wall will be highlighted in blue in the 2D diagram.

Page 58: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

Step3: Divide wall into stacks for selected wall(s).

To add a wall stack, select Wall->Add Horizontal Stack or Add Vertical Stack->place dividers on

the wall to create stacks.

To remove a wall stack, select Wall->Delete Wall Stack and left-click a divider.

To adjust size of a stack, left-click any wall stack and drag divider to adjust its size (section

height), or enter wall stack height in right property panel.

Page 59: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

Step 4: Select main covering product for selected section. Select item from Primary products from pull-

down list in property panel on the right.

Page 60: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

Step 4: Apply finishing trim, décor or bullnose to edges. Drag and drop linear product such as finishing

trim to edges of wall stacks.

Page 61: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

Step 5 Set product layout direction and alignment options for selected stack.

8.12. Wall profile There are situations that wall design and product assignments are shared among other walls of the same

room or walls of other rooms. This feature allows wall section and assignments be copied from one wall

and be pasted to other walls.

Copy and paste wall profile

Copy Wall Profile. Left-click to select a wall of expanded room view, and select Copy Room

Profile.

Apply Wall Profile. From expanded wall view of target room, left-click to select one empty wall,

select Apply Wall Profile command.

Apply Wall Profile with Height. From expanded wall view of target room, select one or multiple

walls (with Ctrl-key), left-click to select one empty wall, select Apply Wall Profile with Height.

Copied wall stack height is maintained on target wall (instead of scaled proportionally as in

Apply Wall Profile)

Page 62: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

Wall profile library

If a wall profile is to be reused for future projects, one can save it to the wall profile library.

Save a wall profile

Display expanded walls by turning on View Wall, left-click a target wall, and open wall profile

library.

Select Add Wall Profile and enter name of the profile.

Page 63: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

Apply a wall profile form the library

Display expanded walls by turning on View Wall.

Similar to product assignment, user can drag and drop a saved wall profile to target wall.

8.13. Room Profile

In commercial flooring projects, many room areas share same floor and wall design and product

assignments across all floor layers. This feature substantially speeds up the product assignment process

when hundreds of similar rooms are in place.

Copy Room Profile Left-click a room -> Room Option->select Copy Room Profile. This command

copies

Room floor product assignments (include tile pattern, layout direction), wall base

assignments, border design and assignments (if exist)

Wall stack design (layer sections), wall product assignments, bull nose, trims, decors

Page 64: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

Paste Room Profile Apply copied room profile to selected room. At pasting, if rooms to be

pasted to are with different wall height, wall section heights are automatically scaled

proportionally.

Paste Room Profile with Height Apply copied room profile to one or any number of selected

rooms. At pasting, if rooms to be pasted to are with different wall height, original wall section

heights are

Room profile library

If a room profile can be reused for future projects, one can save it to the room profile library.

Save a room profile

Left-click a target room, and open room profile library.

Select Add room Profile and enter name of the profile.

Page 65: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

Apply a rooml profile form the library

Similar to product assignment, user can drag and drop a saved room profile to selected rooms.

8.14 Tile Pattern Editor

Commercial users can design their own tile patterns with Tile Pattern Editor.

Step 1: To open Tile Pattern Editor, click triangle icon next to Product/Service Database to open sub-

menu. Select Design Tile Pattern.

Page 66: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

Step 2: Select tiles that form desired tile pattern. Click Add Tile to open product database and select

one.

Step 3: Place tile and adjust its orientation. Left click to drop tile into desired location, use Rotate

command to adjust its orientation.

Step 4: Place more tiles to form desired pattern. Repeat step 2 and 3 to place more tiles into drawing

area. To line up with existing tiles, click tile corner point or edges of existing tiles.

Page 67: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

Step 5: Preview and save the finished design on Pattern Preview Area. If there’re several available

pattern units, select one of them from Available Pattern List to preview the full layout on Pattern

Preview Area. Select desired one and save it to master database or to current project.

Page 68: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

Step 6: Apply Tile pattern to room or walls. Drag and drop a tile pattern to target room or wall. Upon

pop-up, select tiles that fit into the pattern, specify grout product and click OK to confirm selection.

Page 69: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

Use Pattern Start Position to select pattern or tile grid starting point by clicking on a room corner

or any point inside a room/region.

9. Seam Layout and Estimation

With room takeoff and material assignment in place, the next step is layout estimating. This section

introduces the steps on how to generate an accurate estimate on material usage (such as linear length,

square footage, boxes of tiles, etc.), seam layout and cut sheet for roll goods like carpet and vinyl.

9.1. Review estimation data

To review estimation data for entire project, click Estimation Data icon on right panel as shown in the

image below.

Page 70: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

9.2. Estimate by floor

In many cases, there is a need to estimate and quote a job by floor layers so a job can be sold and

installed by floors and at different installation phases. When estimate by layer, it assumes that material

roll and cuts (therefore the waste cuts) are not shared between floors. Normally, the waste factor is

higher.

To enter Estimate by Floor mode, select Estimation Data icon in right panel, check Estimate by layer

Click to review

estimation data in

right panel.

Page 71: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

.

NOTE: If project has been estimated under regular mode (not estimate by layer), entering Estimate by

layer mode will erase existing estimation data, cut sheet and seam diagram.

9.3. Change layout direction for roll goods

It is common practice to compare different layout directions.

To change layout direction of a roll good, click one area with that item (so it is highlighted), then click

Horizontal or Vertical layout button to redo layout with that direction. These two commands apply to all

rooms of the same floor.

Page 72: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

To change layout direction on one selected room, select Layout Direction command on takeoff tab and

drag mouse cursor to desired direction inside a room.

Please note that when using Layout Direction command, user can layout product alone any direction.

Page 73: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

9.4. Seam manipulation

Drag and drop seam on diagram. Seams placed on rooms can be dragged and dropped at any location.

And it can be snapped to any corner points or aligned with any wall segments automatically when that

corner point or wall is highlighted. Seam can be removed or deleted by drag-and-drop off a room.

Switch Seam Side: switch seam layout from one side to another side (for example, from left to right, or from top to bottom, vice versa)

Add T-Seam: place a cross seam against roll layout direction. Use Even T-seam from submenu to

place evenly spaced T-seams to selected cuts.

Page 74: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

Add B-Seam: place section-dividing length-line at roll layout direction (shown in solid line vs.

regular dashed seam line).

Delete Seam: pick and delete seam. Seam can be removed or deleted by drag-and-drop off a

room

Lock Seam: lock seam location of selected room(s)

Reset Seam Location: Reset existing seam locations and re-estimate whole plan

Switch Layout Direction: Switch layout direction of selected regions

Set layout direction: Set material layout direction to any direction. Drag mouse cursor to point

layout direction in a room, the program will lay material along pointed direction.

Change Step Per Break for Stairway: set number of steps per cut for stairway from property panel on

the right.

By default, carpet cuts for stairway are made individually for each step to optimize the cut waste. But it

may not be the best layout. To set a cut per several steps, left-click stairway and select Covering Style or

Step per break.

Page 75: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

What is dividing line (or section dividing line)?

Dividing line is used to divide a floor area into separate sections so that seams within each section can

be placed and edited individually. This feature is helpful in placing seams on complicated shapes such as

long hallways or connected corridors. Below is an example for its usage (dividing seams are in solid color)

Page 76: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

9.5. Cut sheet manipulation

Cut sheet window shows roll stock cuts of selected roll good items from floor diagram.

Stock cut sheet is generated by the program automatically. However, user can manually adjust cuts in

the cut sheet window with these operations, and therefore affect Total Linear Length, Qty and Waste %:

Cross reference cuts on floor and cut sheet. Left-click any cut on cut sheet to cross show

corresponding cut in floor diagram (highlighted)

Zoom in and out in cut sheet window (use mouse wheel)

Drag-and-drop single cut to different locations in cut sheet (even across rolls)

Drag a block of cuts and shift to right (press down SHIFT-key)

Add a new roll by dragging a cut to a blank space

Add T-seam on cut in cut sheet

While using these commands, observe changes in Total Linear Length, Qty, and Waste % to achieve

optimized results.

Page 77: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

Drag and shift a single cut

Drag and shift a block of cuts to right section. Press down SHIFT key; drag a cut to shift a block

of cuts to the right.

9.6. Pattern carpet layout setting

Pattern carpet can be specified in product database with pattern repeat parameters:

Page 78: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

Horizontal repeat (carpet width direction)

Vertical repeat (roll length direction)

Pattern drop parameters are used for graphical display and are not used in cut planning and estimating.

They are rarely used.

Horizontal drop (shift in width direction)

Vertical drop (shift in length direction)

Pattern carpet cut algorithm. At layout estimating mode, by default, EXCEPT for the first cut, the

program automatically adds extra repeat margin (Vertical Repeat size) in roll for each additional cut

applied to any room area.

In this example below, first cut (A Cut) is 40’3” without repeat margin added; second cut (B cut) is added

with 18” vertical repeat margin, two fill piece cuts are with repeat margin added as well.

Page 79: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

If cut margin field (for trimming) is specified with the pattern carpet, it is added on top of pattern repeat

margin. In the example, 3” cut margin is added to all cuts including the first cut.

9.7. Control estimation settings for roll goods

MeasureSquare allows the user to set estimation criteria for roll goods at project level or at the system

level. When estimating a project for the first time, the program will apply estimation criteria at system

level to the entire project. If user chooses to specify estimation criteria at project level, project-level

estimation criteria will OVERWRITE system-level criteria and will be applied and saved to current project.

9.7.1. Set Project-level estimation criteria

To set project-level estimation criteria for roll goods, left-click a room with roll good product and select

Estimation Settings on left panel to specify estimation rules.

Page 80: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

Cut margin and margin type.

In this example, below, selecting cut margin option “Both Length and Width”, it adds 3” to both length

and width of the fill piece.

Maximum roll cut length: Its default value is 0.0 (meaning it uses its roll length as maximum cut

length).

Maximum T-seam in a room can control maximum number of auto-generated T-seams in a

single room area

Minimum reusable length can control if an end of roll will be used as a cut, and then pack rest

of cuts and shifts forward.

Roll-cut option can control whether to share roll good waste across all floors/layers

Roll-cut round up can set to control whether to round up roll cut length to nearest 3”,6” or 1’

Note that project-level settings will overwrite system-level settings.

Page 81: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

9.7.2. Set System-level estimation criteria

To set project-level estimation criteria for roll goods, go to main menu->System Settings->Estimation.

Page 82: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

Cut margin and margin type.

In this example, below, selecting cut margin option “Both Length and Width”, it adds 3” to both length

and width of the fill piece.

Maximum roll cut length: Its default value is 0.0 (meaning it uses its roll length as maximum cut

length).

Maximum T-seam in a room can control maximum number of auto-generated T-seams in a

single room area

Page 83: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

Minimum reusable length can control if an end of roll will be used as a cut, and then pack rest

of cuts and shifts forward.

Roll-cut option can control whether to share roll good waste across all floors/layers

Roll-cut round up can set to control whether to round up roll cut length to nearest 3”,6” or 1’

Note that system-level settings will be overwritten by project-level settings.

10. Export Estimation Data to Worksheet

When the layout estimating step is done, move to the next stage on the Worksheet tab.

To create a new worksheet, select Add Worksheet command

Select worksheet type, such as proposal, quotation, work order, purchase order or invoice.

Select group style and check Import from project estimation.

By Material: a full list of project items with usage quantities and sales data without room

and floor layer info is displayed.

By Room: project items assigned are listed under each room labels.

Page 84: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

By Product by Trade: project items marked by that trade are listed.

By Material Break by Room: project items broken down its usage under each assigned

rooms are listed

Below is a sample worksheet that organizes items by product.

To delete a worksheet, left-click to select a tab and select Delete Worksheet command .

To add a new item, left-click Add New Item command .

To cut a selected item, left-click to select one line item and select cut item command.

To delete an item from worksheet, left-click to highlight it and select Delete an Item command .

To export to Excel workbook, select Export to Excel , navigate to target directory, type in file name,

and it saves current presentation of worksheet into Excel format.

Note: Data exported to MS Excel does not include the formula for total calculation. One may

need to build a formula for future recalculation needed with exported Excel file.

Page 85: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

11. Project Printout and Report

Installation diagrams are vital to the quality of an installation job. It is often attached with the work

order and must be followed by installers. Before printing the diagram page, click File menu and go to

Print to preview printouts and set up print options.

After select Print command, preview of printouts will be displayed. On top of preview window, there are

several submenus.

Select Print to choose a physical printer or a virtual printer to print diagrams.

Page 86: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

Select Printer & Paper to choose paper size and layout orientation.

Select Options to configure printout format and content.

Page 87: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

After configuration, select Print PDF to convert diagram and documents into PDF document and

save them to a local computer.

12. Synchronize to M2 Cloud

MeasureSquare program can save and retrieve data from M2 cloud, such as, user data, product

database and print templates. For users who want to use MeasureSquare program on multiple devices,

it is important to sync to M2 Cloud periodically to ensure user data flow consistently on different

devices.

To sync local project files to M2 cloud, go to File menu->click on Import to import project files

that have been saved on local computer to M2 cloud->select project files to be uploaded->click

Open->click Sync.

Page 88: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

To sync product database to M2 cloud, go to Takeoff tab, find Product/Services panel, select

triangle icon and select Sync.

13. License Control

After a user has started subscribing one or more licenses, select Question Mark icon and select

MeasureSquare ID & license to review license status.

Page 89: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

If the program is not activated and if a license is available, select the license and click Activate to

start using it.

If user is done with using the program and wants to transfer the license to another machine,

click Logout & Quit. The license will be returned to M2 cloud and will be available for another

machine to use.

14. System Setting

System Settings is designed to help the user configure general settings and options. It is suggested to

explore this right after one opens the program.

To open System Settings, go to File menu->System Setting.

Page 90: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

To change measurement system or select default unit name, open Measurement Tab and select

desired measurement system and unit name from pull-down list.

Page 91: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

To set default value for drawing, select Model tab to make changes.

To configure system-level estimation criteria, open Estimation tab and specify desired rules.

Page 92: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

To configure desired drawing style, select style tab to modify default colors, thickness of lines, etc.

15. Onsite measure with Disto laser meter MeasureSquare RETAIL and upper-tier editions are integrated to work with several Leica DISTO meter

models that are Bluetooth enabled. The PC or tablet running MeasureSquare must also be Bluetooth

capable to receive measurement data wirelessly transferred from the DISTO.

Key benefits of DISTO drawing include:

Precision and efficiency with laser measurements to prevent human errors resulting from

measuring tapes

Seamlessly measure large areas including rooms with obstructing objects such as furniture or

warehouse stacks

Supported DISTO Models: D330i, E7500i, E7100i, D810

15.1 Pair Disto meter with Windows and MeasureSquare

Step 1 Turn on DISTO

Turn on laser meter by pressing on the Red On button.

Page 93: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

Step 2 Turn on Bluetooth

To turn on Bluetooth on Disto device, find model name and follow instructions below.

For D330i: Press Bluetooth button to switch Bluetooth on or off.

For E7100i: To turn on Bluetooth, press Bluetooth button to switch Bluetooth on or off.

For E7500i: Press Func. ->Top-left Dot button->Press ‘=’ to switch Bluetooth on or off.

Page 94: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

For D810 Touch:

Step 3 Pair Disto with Windows PC

1. Select the Start button, then select Settings > Devices > Bluetooth.

2. Turn on Bluetooth > select the device > Enter paring code: 0000 (Four zeros) ->Pair.

*Previously paired devices will be stored to PC, therefore pairing is only essential for first time DISTO

usage

Step 4 Pair MeasureSquare with Disto meter

1. Open MeasureSquare. Under Takeoff Tab, select Disto icon->Discover->Connect to establish the

software connection with the DISTO.

2. If the connection is successful, Disto device will be highlighted in green.

Page 95: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

Please note that Windows automatically disconnects Disto if the device is idle for 30 seconds. To stay

connected, check Keep Alive box.

15.2 Drawing with the DISTO and MeasureSquare

After the DISTO is successfully paired with MeasureSquare, user can draw with the DISTO and

MeasureSquare by first selecting a starting point and then proceeding to draw via either the Draw

Room or Draw Takeout functions.

Below is a guide to the commands available to the user in the DISTO Start Point Picking Mode

Start Point Picking Mode

To select a starting point,

1. Use arrow keys on the soft keyboard in MeasureSquare to move the blue dot to the desired

start point.

2. Once the desired starting point is located, press on the DISTO start Room Drawing mode.

Page 96: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

Room Drawing Mode

When entering room drawing mode, user can use Disto device and soft keyboard in MeasureSquare to

capture room shapes. This chapter will demonstrate how to capture a rectangular shaped room and a

polygon shaped room.

Draw a Rectangular Room

1. Press on Disto to enter “Drawing Mode”. The blue dot turns to red arrow. Point the red arrow to desired direction using arrow keys in soft keyboard.

2. Press the button again on Disto to capture and transfer first measurement. As soon as the measurement is received, MeasureSquare draws a wall in drawing area.

Note: when measuring a wall, place the end of Disto against one wall and use laser to shoot the oppsite wall as shown in the image below.

Page 97: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

3. Capture and transfer next wall measurement using the button (identical to the first step)

4. Square the room by pressing Close command. (the last two walls do not need to be measured)

Page 98: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

5. As soon as room is closed, it enters Start Point Picking mode.

Draw a Polygon Room

The example below demonstrates steps necessary to create a polygon room with features including a doorway, a missing wall, and an angled wall.

1. Press on Disto to enter “Drawing Mode”. The blue dot turns to a red arrow. Point the red arrow to desired direction using arrow keys in soft keyboard.

Page 99: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

2. Press the button again on Disto to capture and transfer the first measurement. As soon as the measurement is received, MeasureSquare will draw first wall on the drawing area.

3. Capture and transfer the next wall measurement using the button (identical to the first step)

4. To add a door, capture the measurement from door-jamb to jamb by pressing the

button on Disto, then go to MeasureSquare soft keyboard->select Mode->Convert to Door in MeasureSquare.

The program will convert last measurement to a doorway.

Page 100: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

5. To draw an opening, capture the measurement of an opening by pressing the button on Disto, then go to MeasureSquare soft keyboard->select Mode->Convert to missing wall in MeasureSquare.

Page 101: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

6. To draw a 45 degree angled wall, select Rotate to rotate red arrow to desired angle

7. Select Close key to close the room. (the last wall does not need to be measured)

Page 102: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

15.3 Advanced Techniques

MeasureSquare provides user shortcuts to help speed up measuring. It also offers advanced functions to

help user handle situations that involve measuring walls with arbitrary angels, curved walls, outside

corners, etc. Those techniques will be discussed in this chapter.

Room Corner Navigation

Normally a user wants to start measuring from corner point of an existing room. To quickly navigate to

room corner,

Use arrow keys to move blue dot to target room.

When blue dot gets close to a wall, it will snap to nearest two corner points by creating two

more blue dots.

Select desired corner point using Next Point key on soft keyboard. Then press the red ON

button on Disto to enter “Drawing Mode”.

Page 103: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

Size Entry with Keypad

If a measurement is shorter than length of Disto device itself, it is difficult to be captured by Disto.

MeasureSquare allows a user to manually input a measurement while measuring with Disto.

While in Room Drawing mode, use arrow keys to point red arrow to desired direction

Select Input, enter desired measurement, say 6”, and then select Apply. 6” wall will be created

in drawing area.

Continue to measure with Disto

Switch Starting Point

While measuring halfway, if one wants to measure from the other end of drawing, select Mode then

selects Switch Starting Point to measure.

Page 104: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

Create a Room Based on Existing walls

MeasureSquare allow users to create room based on existing walls of connected rooms. As the example

shows below, if user starts from a corner point, measures one wall, then point red arrow to desired

direction, MeasureSquare will automatically predict room shape based on existing walls and create pink

contour. Select Close on soft keyboard, it converts a pink contour to regular walls.

If the pink contour does not look correct, ignore it and continue measure.

Page 105: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

Measure Walls with Outside Corner

When measuring walls with outside corners, one may need to use the Minus function. For example, to

measure the angled wall in the image below, user can

Measure from one corner to a point on a wall to obtain the first measurement, which is

highlighted in blue.

Select Mode->Minus. A pink arrow appears, which is going to deduct next measurement from

the measurement obtained in step 1

Measure from the other corner to the same point in step 1 to obtain second measurement,

which is highlighted in orange.

The length of the angled wall will be computed automatically.

Page 106: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

Measure Arbitrary Angled Wall

To measure an arbitrary angled wall, user can use triangulation function.

Step1: Measure two or more corners of a room and then select Mode->Triangulation.

Step 2 Press the Lower left button to cycle through corners until desired reference point is selected.

Step 3 Capture the distance, shown as a dashed blue line in the image above and transfer via Bluetooth. The angled wall will then be shown in red indicating a successful measure

Page 107: Measure Square Commercial Edition User Guide Square Commercial...o Print to blueprint scale with details, email or export report in Excel, PDF. 3. How to Evaluate 30-Day Trial Follow

Measure Curved Wall

*Arc is drawn by first locating the Apex, and then the endpoint of the arc

Step1: Measure from one end of arc to a point on the arc. Step 2: Measure from the same point on arc to the other end of arc Step 3: select Mode->Convert to Arc. It will convert last two measurements to a curved wall.