WELL COMPLETION
-
7/27/2019 ME4105 NUS Offshore Oil and Gas Technology Lecture 7
3/32
Well Completion Once the well is drilled to the desired depth, the
formation must be tested and evaluated to determine
whether the well will be completed for production, orplugged and abandoned.
If the decision is made to go ahead to complete the well,the production casingis run by the drilling crew, usingthe drilling rig for the purpose.
A well is always cased(set pipe) to complete the well.Casingis relatively thin-walled, steel pipe. Numerous
joints of the same size casing are screwed together toform a long length of casing, called a casing string. Thecasing has an outer diameter of at least 2 less then the
wellbore diameter. The casing string is run into the welland cemented to the sides of the well in a cement job.
Casing stabilizes the well and prevents the sides fromcaving into the well. It protects fresh water reservoir fromthe oil, gas and salt water brought up the well duringproduction. Casing also prevents the production frombeing diluted by waters from other formations in the well.
-
7/27/2019 ME4105 NUS Offshore Oil and Gas Technology Lecture 7
4/32
Many wells requires four concentric strings of large pipe:
Conductor pipe Surface casing,
Intermediate casing(s)
Production casing (often call the oil stringor long stringin the
oil patch)
The production casing is the last and deepest string of casing run in
the well. Size of the production casing, which provides a conduit from
the surface to the producing formation, is determined principally by
subsurface considerations, such as:
Subsurface artificial lift equipment required
Multiple-zone completions requiring several different strings of
rubing isolated from each other by packers.
Types of completion method to be used: open hole, perforated
casing, screened open hole, or screened perforated casing.
Prospects of deepening the well at a later date.
Well Completion
-
7/27/2019 ME4105 NUS Offshore Oil and Gas Technology Lecture 7
5/32
Conductor, surface, intermediate & production casing cemented in the well
Source: Gerding, Fundamentals of Petroleum, 3rdEd.
-
7/27/2019 ME4105 NUS Offshore Oil and Gas Technology Lecture 7
6/32
Relationship of
strings of casing
Source: Berger, Anderson, Modern Petroleum - A Basic Primer of the industry, 3 rdEd.
-
7/27/2019 ME4105 NUS Offshore Oil and Gas Technology Lecture 7
7/32
Another type of string/pipe that is not common in wells over 10,000 ft is
called a liner. Liners are sometimes set in a hole as a protective string,serving the same function as an intermediate string. A liner is usually
run only from the bottom of the previous string to the bottom of the open
hole. Liners are suspended from a previous string with a hanger. They
may suspendin the well either with our without cementing.
The final string of pipe usually run in a producing well is thetubing. Tubing is nearly freely suspended in the well from
the tubing head. In a flowing well, its small diameter
production more efficient results than casing. Also, tubing is
considerably easier to remove than casing when it
becomes plugged or damaged. Tubing, when used in
conjunction with a packer, keeps well fluids away from the
casing because the packer seals the space between the
tubing and the casing. Well fluids corrode the casing and
thus cause costly repair job later.
Well Completion
-
7/27/2019 ME4105 NUS Offshore Oil and Gas Technology Lecture 7
8/32
The packer consists of a pipe-like device through which
well fluids can flow, a rubber sealing element that forms
a fluid-tight seal, and gripping elements (called slips)
that hold the packer in the tubing-casing annulus just
above the producing zone. Since the packer seals off the
space between the tubing and the casing, formationfluids flowing into the well are forced into and up the
tubing.
Another device frequently installed in the tubing string
near the surface is a subsurface safety valve. Thevalve remains open as long as fluid flow is normal. When
the valve senses something amiss with the surface
equipment of the well, it closes, preventing the flow of
fluids.
Well Completion
-
7/27/2019 ME4105 NUS Offshore Oil and Gas Technology Lecture 7
9/32
Completedwell
Source: Dawe, Modern Petroleum Technology, Vol 1, Upstream
-
7/27/2019 ME4105 NUS Offshore Oil and Gas Technology Lecture 7
10/32
Well ready to produce
Source: Berger, Anderson, Modern Petroleum - A Basic Primer of the industry, 3 rdEd.
-
7/27/2019 ME4105 NUS Offshore Oil and Gas Technology Lecture 7
11/32
Tubing and packer
in completed well
Source: Gerding, Fundamentals of Petroleum, 3rdEd.
-
7/27/2019 ME4105 NUS Offshore Oil and Gas Technology Lecture 7
12/32
Cementing Primary cementingpertains to the initial cementing jobs
performed in conjunction with setting the various casingstrings. It also afford additional support for the casing, andhelp retard corrosion.
Secondary cementingis done after primary cementing,most often because of some functional failure of the
primary cement job. It may be used to squeeze cementthrough perforations, to plug a dry hole, or it may be usedto plug an open zone. Secondary cementing normallyinvolves the injection under pressure of a slurry into theporous formation. Secondary cementing is used for: Supplement of repair a primary job
Repair defective casing or improperly place perforations
Abandon a permanent nonproductive or depleted zone
Reduce the danger of lost circulation in open hole while drilling deeper
Isolate a zone before perforating
Fracture the formation
-
7/27/2019 ME4105 NUS Offshore Oil and Gas Technology Lecture 7
13/32
Casing cementing job
Source: Gerding, Fundamentals of Petroleum, 3rdEd.
-
7/27/2019 ME4105 NUS Offshore Oil and Gas Technology Lecture 7
14/32
Completion Methods Open-hole completion An open-hole, or barefoot,
completion has no production casing or liner set oppositethe production formation. Instead, reservoir fluids flow
unrestricted into the open wellbore. This type of
completion, which is rarely used and is generally
restricted to limestone reservoirs, is useful where only
one production zone and low-pressure formations exist.
In an open-hole completion, casing is set just above the
pay zone, and drilling proceeds into the production zone
as far as necessary to complete the well. Open-hole
completed wells are usually stimulated by Hydraulic oracid fracturing.
-
7/27/2019 ME4105 NUS Offshore Oil and Gas Technology Lecture 7
15/32
Open-hole completion
Source: Gerding, Fundamentals of Petroleum, 3rdEd.
-
7/27/2019 ME4105 NUS Offshore Oil and Gas Technology Lecture 7
16/32
Perforated completion The perforated completion, by
the most popular method of completing a well, required agood cementing job and proper perforating method.Perforation is the process of piercing the casing wall andthe cement to provide openings through which formationfluids may enter the wellbore. Perforating is accomplished
by lowering a perforating gun down the production casingof the tubing until it is opposite the zone to be produced.The gun is fired to shoot bulletsor, more often, to set offspecial explosive charges known as shaped charges. Ashaped charge is designed so that an intense, directionalexplosion is formed. Because the explosion is actually a
jet of high-energy gases or particles, it is calledjetperforating. If a production liner is used rather thanproduction casing, the liner is perforated to complete the
well.
Completion Methods
f f
-
7/27/2019 ME4105 NUS Offshore Oil and Gas Technology Lecture 7
17/32
A perforating gun creates holes or perforation in the casing cement
and producing formation and allows fluids to enter the well.
Source: Gerding, Fundamentals of Petroleum, 3rdEd.
-
7/27/2019 ME4105 NUS Offshore Oil and Gas Technology Lecture 7
18/32
Another type of completion involves a wire-wrapped
screen, which is a short length of pipe that has openingsin its sides and is wrapped with a specially shaped wire.
One method involves attaching the screen to the bottom
of the tubing string and lowering it into a well that has
been perforated. Usually wire-wrapped screens are run
in conjunction with a gravel pack, i.e. gravel is placed inthe hole outside the screen. Well fluids flow through the
gravel pack, through the wire-wrapped screen, and into
the tubing. Wire-wrapped screen completion are most
often utilised in cases where the producing zone orzones are likely to produce sand as well as oil and gas.
The screen and gravel pack minimise the entry of sand
into the wellbore, thus preventing problems caused by
sand.
Completion Methods
Wire wrapped screen completion run with a gravel pack
-
7/27/2019 ME4105 NUS Offshore Oil and Gas Technology Lecture 7
19/32
Wire-wrapped screen completion run with a gravel pack
inside the perforated casing
Source: Gerding, Fundamentals of Petroleum, 3rdEd.
-
7/27/2019 ME4105 NUS Offshore Oil and Gas Technology Lecture 7
20/32
Tubeless completion Although most wells are
completed with a tubing, a small-diameter well that usessmall-diameter casing may be completed without the
tubing. The small casing is cemented and perforated
opposite the producing zones. Tubeless completions are
used mostly in small gas reservoirs that produce few, ifany, liquid and are low in pressure.
Multiple completions Multiple completions are be
used when one wellbore penetrates two or more
producing zones. Usually, a separate tubing string inwith packers is run inside the production casing for each
producing zone. For example, in a triple completion,
three tubing strings and three packers can be utilized in
a single production string.
Completion Methods
T bi l l ti ith i t bi t i
-
7/27/2019 ME4105 NUS Offshore Oil and Gas Technology Lecture 7
21/32
Tubingless completion with no inner tubing string
Source: Gerding, Fundamentals of Petroleum, 3rdEd.
-
7/27/2019 ME4105 NUS Offshore Oil and Gas Technology Lecture 7
22/32
Multiple completion
Source: Gerding, Fundamentals of Petroleum, 3rdEd.
-
7/27/2019 ME4105 NUS Offshore Oil and Gas Technology Lecture 7
23/32
Wellhead The wellheadis the equipment used to confine and
control the flow of fluids from the well. It forms a seal to
prevent well fluids from blowing out or leaking at the
surface. The conditions expected to be encountered in
the individual well determine the type of wellhead that is
needed. Sometimes, all that is required is a simpleassembly to support the weight of the tubing in the well.
In other cases, the control formation pressure is
necessary, and a high-pressure wellhead is required.
Pressures greater than 20,000 psi have been found insome fields.
Basically the wellhead is made up of combination of
parts called casinghead(s), tubing head, and
Christmas tree.
-
7/27/2019 ME4105 NUS Offshore Oil and Gas Technology Lecture 7
24/32
Wellhead
Source: Gerding, Fundamentals of Petroleum, 3rdEd.
A Ch i t t ith l t t l th fl f fl id f th ll
-
7/27/2019 ME4105 NUS Offshore Oil and Gas Technology Lecture 7
25/32
A Christmas tree with valves to control the flow of fluids from the well
Source: Gerding, Fundamentals of Petroleum, 3rdEd.
-
7/27/2019 ME4105 NUS Offshore Oil and Gas Technology Lecture 7
26/32
Casinghead The casinghead is a heavy steel fitting at
the surface to which the casing is attached. Duringdrilling and workover operations, the casinghead is used
as an anchor for the pressure control equipment that may
be necessary. If several strings of casing are used in the
well, more than one casinghead may be used on awellhead assemble.
Tubing head Similar in design and use to the
casinghead, the tubing head supports the tubing string,
seals off pressure between the casing and the inside oftubing, and provides connections at the surface with
which the flowing liquid or gas can be controlled. The
tubing head is supported by the casinghead if a
casinghead is used on the well.
Wellhead
-
7/27/2019 ME4105 NUS Offshore Oil and Gas Technology Lecture 7
27/32
Christmas Tree The assembly of control valves,
pressure gauges and chokes located at the top of a well
is known as the Christmas tree, so named because of its
treelike shape, with a large number of fitting branching
out above the wellhead. The valves are opened and
closed to control the flow of oil and gas from the wellafter it has been completed. The master valve can shut
off the flow entirely. Also in the Christmas tree is a
choke, or restriction in the line, that control the amount
of fluids flowing from the well. The pressure gaugesreveal casing and tubing pressure. By knowing these
pressures under various operating condition better well
control is possible.
Wellhead
-
7/27/2019 ME4105 NUS Offshore Oil and Gas Technology Lecture 7
28/32
Swabbing Swabbingis an operation that temporarily lowers the
fluid level in the well so that it can begin to produce. It is
sometimes necessary if the well does not flow afterperforating.
The purpose of swabbing is to swab, or lift, enough fluids
out of the tubing so that the hydrostatic pressure is
reduced to a value below that of the formation pressure.If it is successful, formation fluid will start to flow
immediately. Swabbing is done with a swab cup, which
picks up fluid in the tubing and raises it to the surface by
means of continuous pull on a cable attached to ahoisting winch.
If the well does not begin to produce, it may need to be
stimulated, or a pump may have to be installed as a
permanent lifting device to bring the oil to the surface.
-
7/27/2019 ME4105 NUS Offshore Oil and Gas Technology Lecture 7
29/32
Offshore Completions A well completed offshore is much like one on land,
except that a different technique is used to control thefluids as they grow from the top of the well. The wellhead
valves and fittings may be placed above the surface of
the water (surface completion), or they may be
installed on the seafloor (subsea completion).
A well drilled from a platform is usually completed with a
Christmas tree on the deck of the platform, while a
subsea completion, the wellhead is located on the
seafloor.
A wetsubsea installation is one installed on thewellhead, exposed to the surrounding water.
A drysubsea installation is one housed in a protective
dome.
-
7/27/2019 ME4105 NUS Offshore Oil and Gas Technology Lecture 7
30/32
Subsea completion
Source: Gerding, Fundamentals of Petroleum, 3rdEd.
-
7/27/2019 ME4105 NUS Offshore Oil and Gas Technology Lecture 7
31/32
Well Testing
A variety of well test are conducted to determine
production rates for oil and gas wells. Each test reveals
certain information about a particular well and the
reservoir in which it is completed. Accuracy is, of course,
very important, and these test data form the case history
of a well. Potential test It is a measurement of the largest
amount of oil and gas that a well will produce in a 24-
hour period under certain fixed conditions. This test is
made on each newly completed well and at other timesduring the wells producing life. Potential test information
is generally required by the state regulatory group, which
uses it to establish the producing allowable for the well.
W ll T ti
-
7/27/2019 ME4105 NUS Offshore Oil and Gas Technology Lecture 7
32/32
Bottomhole pressure test It measures the reservoirpressure of the well at a point opposite the producingformation. The test is usually conducted after the well hasbeen shut for 24 to 48 hours. When this test is conducted atscheduled intervals, valuable information about the declineor depletion of the zone in which the well is producing will begathered.
Productivity test It is conducted to determine the effectsof different flow rates on the pressure within the producingzone of the well. This reveals certain physical characteristicsof the reservoir, and the maximum potential rate of flow canbe calculated without risking the damage that might occur if
the well were produced at its maximum possible flow rate.The closed-in bottomhole pressure of the well is firstmeasured. Next the flowing bottomhole pressure at severalstabilised flowrates were measured. This type of testing isdone on both oil and gas wells, and is the most widely
accepted method of determining the capacity of gas wells
Well Testing