Time : Three hours Maximum: 100marksAnswer ALLquestions.
PARTA- (10 x 2 = 20marks)1. What are the components ofmanufacturing system?2. A total of 800 shafts must be produced in the lathe section of the machine shop
during a particular week. Each shaft is identical and requires a machine cycletime 11.5 minutes. All of the lathes in the department are equivalent in termsof their capability to produce the shaft in the specified cycle time. How manylathes must be devoted to shaft production during the given week, if there are40 hours of available time on each lathe?
3. Bywhom and when was Group technology first documented?4. What is meant by rout sheet?5. Classify FMS according to the king of operations performed.6. What are the technologies used for automatic data collection?7. Write short notes on 'CIMOSA'.8. Differentiate LANfromMAN(networks).9. What is Engineering Change Control?10. List the features ofRDBMS.
-