8.0 PROJECT COSTS

The following are the US‐23 Improvements preliminary engineering and construction costs 

projected in fiscal year 2016 funds: 

Active Traffic Management (ATM), M‐14/US‐23 to south of M‐36:  .......................... $29,540,000  

Intelligent Transportation System (ITS), M‐14/US‐23 to south of M‐36:  ................... $14,000,000  

Bridge replacements at 6 Mile, 8 Mile and N. Territorial Roads:  ............................... $14,017,000 

Bridge replacements of US‐23 bridge over the railroad: ................................................ $4,639,047 

Widening of US‐23 bridge over Barker Road:  .................................................................... $639,483 

Northbound and southbound on‐ramp extensions:  ...................................................... $6,305,000  

US‐23 CPM, M‐14/US‐23 to Silver Lake Road:  ................................................................ $6,440,000  

CPM on the Joy Road and Warren Road bridges:  ............................................................. $602,000