mcnaughton-mckay corporate overview · in 2012, mcnaughton-mckay was brought an opportunity by one...

24
Lighting Portfolio Please Note: McNaughton-McKay Electric Company provides lighting specifications and photometric studies for manufacturers represented by our firm. We do not provide lighting design or electrical engineering services. These professional services are the responsibility of the architect or owner’s representative.

Upload: others

Post on 03-Jun-2020

11 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: McNaughton-McKay Corporate Overview · In 2012, McNaughton-McKay was brought an opportunity by one of our loyal contractors to suggest an LED lighting solution for a parking lot addition

Lighting Portfolio

Please Note: McNaughton-McKay Electric Company provides lighting specifications and photometric studies for manufacturers represented by our firm. We do not provide lighting design or electrical engineering services. These professional services are the responsibility of the architect or owner’s representative.

Page 2: McNaughton-McKay Corporate Overview · In 2012, McNaughton-McKay was brought an opportunity by one of our loyal contractors to suggest an LED lighting solution for a parking lot addition

University of Michigan Walgreen Drama Center, 2007

Page 3: McNaughton-McKay Corporate Overview · In 2012, McNaughton-McKay was brought an opportunity by one of our loyal contractors to suggest an LED lighting solution for a parking lot addition

University of Michigan Walgreen Drama Center, 2007

Page 4: McNaughton-McKay Corporate Overview · In 2012, McNaughton-McKay was brought an opportunity by one of our loyal contractors to suggest an LED lighting solution for a parking lot addition

Working directly with the United States Environmental Protection Agency NVFEL, McNaughton-McKay provided photometric studies and lighting suggestions for both interior applications and site lighting. Interior upgrades consisted of new T5 and T5HO fluorescent volumetric-style fixtures, a significant technology improvement from the existing near-obsolete T12 parabolic style. Exterior upgrades consisted of new LED light fixtures mounted to existing poles, replacing the existing, less efficient 400W MH HID fixtures.

National Vehicle & Fuel Emissions Lab, 2010 NVFEL in Ann Arbor, MI is the primary EPA research laboratory used for fuel and emissions testing. Work carried out in this laboratory supports the efforts of the Office of Air and Radiation (OAR) and the Office of Transportation and Air Quality (OTAQ) to establish and enforce emission standards for motor vehicles, engines, and fuels, as well as the development of automotive technology.

Page 5: McNaughton-McKay Corporate Overview · In 2012, McNaughton-McKay was brought an opportunity by one of our loyal contractors to suggest an LED lighting solution for a parking lot addition

National Vehicle & Fuel Emissions Lab, 2010

Page 6: McNaughton-McKay Corporate Overview · In 2012, McNaughton-McKay was brought an opportunity by one of our loyal contractors to suggest an LED lighting solution for a parking lot addition

The Cedars of Dexter Clubhouse, a new construction project completed in 2010, McNaughton-McKay worked directly with the interior designer and was instrumental in all of the fixture selections for the multi-use space. The project included fine and casual dining spaces, fitness center and pool, as well as gathering & entrances, entertainment rooms, and auxiliary spaces.

Page 7: McNaughton-McKay Corporate Overview · In 2012, McNaughton-McKay was brought an opportunity by one of our loyal contractors to suggest an LED lighting solution for a parking lot addition
Page 8: McNaughton-McKay Corporate Overview · In 2012, McNaughton-McKay was brought an opportunity by one of our loyal contractors to suggest an LED lighting solution for a parking lot addition

The Barbara Ann Karmanos Cancer Institute has signed a lease to consolidate some of its office workers into a 17,500 square foot space in the MidMed Plaza building. The Detroit-based cancer center will use the new space at 4265 John R St. for administrative office space, said Media Relations Manager Patricia Ellis. The cancer center will be across the street from Detroit Medical Center. (2003)

The Barbara Ann Karmanos Cancer Center is a tenant space fit-out located across the street from Detroit Medical Center. The project was completed in 2010. McNaughton-McKay worked on the single-story Design/Build project with the electrical contractor to select lighting fixtures and wireless sensors to utilize newest technology and optimize energy savings.

Page 9: McNaughton-McKay Corporate Overview · In 2012, McNaughton-McKay was brought an opportunity by one of our loyal contractors to suggest an LED lighting solution for a parking lot addition
Page 10: McNaughton-McKay Corporate Overview · In 2012, McNaughton-McKay was brought an opportunity by one of our loyal contractors to suggest an LED lighting solution for a parking lot addition

Ford Motor Company is making a $1.3 billion investment in its Hermosillo stamping and assembly plant in Sonora, Mexico. The investment will create 1,000 new jobs directly at Ford. They will manufacturer the Fusion and Lincoln MKZ midsize sedans for the North American market. (April 2003)

Completed in 2012, McNaughton-McKay brought together a Tier 1 industrial supplier and industry-leading lighting manufacturer in a collaborative effort to conceptualize and specify a custom solution for inspection lighting stations at their manufacturing facility in Sonora, Mexico.

Page 11: McNaughton-McKay Corporate Overview · In 2012, McNaughton-McKay was brought an opportunity by one of our loyal contractors to suggest an LED lighting solution for a parking lot addition
Page 12: McNaughton-McKay Corporate Overview · In 2012, McNaughton-McKay was brought an opportunity by one of our loyal contractors to suggest an LED lighting solution for a parking lot addition

Comau Innovation Center, 2012 The Comau Innovation Center in Southfield, Michigan was an upgrade effort completed in 2012 in which McNaughton-McKay worked directly with the end user. Existing 1000W HID fixtures were replaced with 10-lamp T5HO fluorescent highbays, providing a significant energy savings and light quality improvement.

Page 13: McNaughton-McKay Corporate Overview · In 2012, McNaughton-McKay was brought an opportunity by one of our loyal contractors to suggest an LED lighting solution for a parking lot addition

Comau Innovation Center, 2012

Page 14: McNaughton-McKay Corporate Overview · In 2012, McNaughton-McKay was brought an opportunity by one of our loyal contractors to suggest an LED lighting solution for a parking lot addition

DMC Auditorium Remodel, 2009

McNaughton-McKay worked with the Detroit Medical Center’s Construction Service Company to suggest lighting solutions for their auditorium remodel in 2009. Of primary concern was lighting the stage and seating spaces, which was achieved using high-performance compact fluorescent recessed can fixtures.

Page 15: McNaughton-McKay Corporate Overview · In 2012, McNaughton-McKay was brought an opportunity by one of our loyal contractors to suggest an LED lighting solution for a parking lot addition

DMC Auditorium Remodel, 2009

Page 16: McNaughton-McKay Corporate Overview · In 2012, McNaughton-McKay was brought an opportunity by one of our loyal contractors to suggest an LED lighting solution for a parking lot addition

Russell Video Parking Lot Addition, 2011 After attending our 100-Year Anniversary party, Russell Video, a video production & development company, and neighbor to McNaughton-McKay, approached us to suggest exterior LED wall-packs to replace their existing HID units, as well as incorporate into a building & parking lot addition they were doing. We provided multiple options, photometrics, installation instructions, and cut sheets.

Page 17: McNaughton-McKay Corporate Overview · In 2012, McNaughton-McKay was brought an opportunity by one of our loyal contractors to suggest an LED lighting solution for a parking lot addition

Russell Video Parking Lot Addition, 2011

Page 18: McNaughton-McKay Corporate Overview · In 2012, McNaughton-McKay was brought an opportunity by one of our loyal contractors to suggest an LED lighting solution for a parking lot addition

Genesis The Church, 2010

During the course of a project we were running in-house, we came in contact with the architect regarding the exterior walkway area. His goal was to replace the value-engineered bollards with something more aesthetically appealing, but maintain adequate light levels. We recommended options with their respective cut sheets, photometrics, and price impact to the job, and developed a positive relationship in the process.

Page 19: McNaughton-McKay Corporate Overview · In 2012, McNaughton-McKay was brought an opportunity by one of our loyal contractors to suggest an LED lighting solution for a parking lot addition

Genesis The Church, 2010

Page 20: McNaughton-McKay Corporate Overview · In 2012, McNaughton-McKay was brought an opportunity by one of our loyal contractors to suggest an LED lighting solution for a parking lot addition

Adams & Associates Landscape Architect came to us in 2013 to design a small parking lot in Midland, MI with new LED site lighting. Adams included McMc’s photometric unaltered in their proposal.

Page 21: McNaughton-McKay Corporate Overview · In 2012, McNaughton-McKay was brought an opportunity by one of our loyal contractors to suggest an LED lighting solution for a parking lot addition
Page 22: McNaughton-McKay Corporate Overview · In 2012, McNaughton-McKay was brought an opportunity by one of our loyal contractors to suggest an LED lighting solution for a parking lot addition

In 2012, McNaughton-McKay was brought an opportunity by one of our loyal contractors to suggest an LED lighting solution for a parking lot addition to the Oakdale Recovery Center in Canton, MI. Using AGi32 3D rendering photometric software, we offered a solution that met the township ordinance requirements, provided adequate light levels, and fell within the end user’s budget.

Page 23: McNaughton-McKay Corporate Overview · In 2012, McNaughton-McKay was brought an opportunity by one of our loyal contractors to suggest an LED lighting solution for a parking lot addition
Page 24: McNaughton-McKay Corporate Overview · In 2012, McNaughton-McKay was brought an opportunity by one of our loyal contractors to suggest an LED lighting solution for a parking lot addition

Lighting Team Members

Ray Smith MI Region Lighting Supervisor _ Direct: 734-327-6208 cell: 313-820-4675 , [email protected] BS – Business Administration – University of Detroit Mercy MBA – Management/Marketing – Wayne State University Has (25+) years’ experience in the electrical distribution and manufacturing sectors. Experience in following areas: Logistics, Purchasing & Inventory control, Inside Sales and Management Dave Volker Sr. Lighting Account Development Specialist_ Direct: 734-327-6262, [email protected] Has (25+) years in Electrical Distribution Industry focusing on Power Distribution and Lighting, (18) years specializing in lighting systems and controls and Project Management functions. Jessica Skelton Lighting Specialist_ Direct: 734-327-6234, [email protected] BS – Architecture – University of Michigan College of Architecture & Urban Planning Erik Jongeward Lighting Specialist _Direct: 734-327-6255, [email protected] BS – Architecture – Lawrence Technological University BS – Civil Engineering – Lawrence Technological University