mcmillan zc 13 14b post hearing submission 2016 03 24

6

Upload: scott-roberts

Post on 07-Jul-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: McMillan ZC 13 14B Post Hearing Submission 2016 03 24

8/19/2019 McMillan ZC 13 14B Post Hearing Submission 2016 03 24

http://slidepdf.com/reader/full/mcmillan-zc-13-14b-post-hearing-submission-2016-03-24 1/6

Page 2: McMillan ZC 13 14B Post Hearing Submission 2016 03 24

8/19/2019 McMillan ZC 13 14B Post Hearing Submission 2016 03 24

http://slidepdf.com/reader/full/mcmillan-zc-13-14b-post-hearing-submission-2016-03-24 2/6

Page 3: McMillan ZC 13 14B Post Hearing Submission 2016 03 24

8/19/2019 McMillan ZC 13 14B Post Hearing Submission 2016 03 24

http://slidepdf.com/reader/full/mcmillan-zc-13-14b-post-hearing-submission-2016-03-24 3/6

Page 4: McMillan ZC 13 14B Post Hearing Submission 2016 03 24

8/19/2019 McMillan ZC 13 14B Post Hearing Submission 2016 03 24

http://slidepdf.com/reader/full/mcmillan-zc-13-14b-post-hearing-submission-2016-03-24 4/6

ATTACHMENT

UPDATED PERSPECTIVE RENDERING OF PARCEL 4 BUILDING

SHOWING TWO-WAY STOP CONTROLLED INTERSECTION AT EVARTS STREET

AND QUARTER STREET

Page 5: McMillan ZC 13 14B Post Hearing Submission 2016 03 24

8/19/2019 McMillan ZC 13 14B Post Hearing Submission 2016 03 24

http://slidepdf.com/reader/full/mcmillan-zc-13-14b-post-hearing-submission-2016-03-24 5/6

MM – S T C PUD

   E   X   E   C   U   T   I   V   E

   S   U   M

   M

   A   R   I   E   S

   M         -   U       M                       B              

Item Below 

M ,

 V IEW  FROM CORNER  OF ONE QUARTER  STREET & E VARTS STREET 

Page 6: McMillan ZC 13 14B Post Hearing Submission 2016 03 24

8/19/2019 McMillan ZC 13 14B Post Hearing Submission 2016 03 24

http://slidepdf.com/reader/full/mcmillan-zc-13-14b-post-hearing-submission-2016-03-24 6/6

MM – S T C PUD A

Item Belo

M

PROPOSED DE

PREVIOUSLY

SUBMITTED

DESIGN

 V IEW  FROM CORNER  OF ONE QUARTER  STREET & E VARTS STR