Copyright 2008-10@SAPTOPJOBS All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form, or by any means electronic or mechanical including photocopying, recording or any information storage and retrieval system without permission in writing from SAPTOPJOBS
-
Copy Simulative stock to Inventory controlling
Definition:- With LTP process, future planning is done and final total activity requirement, expected procurement details are calculated through LTP MRP run. To analyze further on procurement details i.e to know how much of specific Raw material or packing materials are to be procured, it is required to transfer those details to inventory module. Objective :- LTP run is completed and it is required to transfer the data to inventory module. One will be in a position to transfer the data to inventory module with this document. Prerequisites:- Completed LTP MRP run Planning version Menu path :- Logistics Production Production Planning Long-Term Planning Inv. Controlling MCB& - Evaluation
-
1. Press twice MCB& - Set up data. Inventory Controlling: Stock/Requirements Analysis
-
2. Maintain the following data
Field Name Values Plant Enter Plant From month
Enter value in To...month.
To...month Enter value in To...month.
3. Press Generate data f. long-t.plng ? . 4. Maintain the following data
Field Name Values Planning scenario
Enter value in Planning scenario.
5. Press ICO version . 6. Maintain the following data
-
Field Name Values ICO version Enter value in ICO
version. 7. Press Execute Button . Inventory Controlling: Stock/Requirements Analysis
8. Press Execute Button . Message appear as Click Information
-
9. Press Copy Enter Button . 10. Press Back F3 to run the Information System report of projected receipts, issues, and stocks. SAP Easy Access
-
11. Select Menu Path: Logistics Production Production Planning Long-Term Planning Inv. Controlling MCB) - Evaluation
-
12. Press twice MCB) - Evaluation. Long-Term Planning: Selection
-
13. Maintain the following data
Field Name Values Planning scenario
Enter value in Planning scenario.
Plant Enter Plant Month Enter duration
Press Execute Button .
-
Press Switch drilldown... Button . Switch drilldown
14. Press Month 15. Press Long-Term Planning: Drilldown
-
Press Switch drilldown... Button . Press Material . Press . Long-Term Planning: Drilldown
-
SAP PP/QM User manual
Published by Team of
SAP Consultants at
SAPTOPJOBS
Visit us at www.sap-topjobs.com
Copyright 2008-10@SAPTOPJOBS All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form, or by any means electronic or mechanical including photocopying, recording or any information storage and retrieval system without permission in writing from SAPTOPJOBS