mca e-news - amritsar · iv) mtp department :-total number of building plans submitted and...

27
Municipal Corporation Amritsar e-News MCA e-News Municipal Corporation, Amritsar. June, 2016 Clean City Green City Municipal Corporation, Amritsar Publication of E-newsletter

Upload: others

Post on 21-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MCA e-News - Amritsar · IV) MTP DEPARTMENT :-Total number of Building Plans submitted and sanctioned in the MTP Department during the Month of May, 2016:- Sr. No. Detail Nos. 1

1 Municipal Corporation Amritsar e-News

MCA e-News

Municipal Corporation, Amritsar.

June, 2016

Clean City Green City

Municipal Corporation,

Amritsar

Publication of E-newsletter

Page 2: MCA e-News - Amritsar · IV) MTP DEPARTMENT :-Total number of Building Plans submitted and sanctioned in the MTP Department during the Month of May, 2016:- Sr. No. Detail Nos. 1

2 Municipal Corporation Amritsar e-News

Sh. Bakshi Ram Arora,

Hon’ble Mayor,

Municipal Corporation, Amritsar. Mrs. Sonali Giri, I.A.S.

Commissioner,

Municipal Corporation, Amritsar.

Releasing of monthly E-news letter is an

endeavour of the Municipal Corporation,

Amritsar to make the people of Amritsar City

aware about the activities being undertaken by it.

It will increase their familiarity with the

administration of the Municipal Corporation,

Amritsar.

Page 3: MCA e-News - Amritsar · IV) MTP DEPARTMENT :-Total number of Building Plans submitted and sanctioned in the MTP Department during the Month of May, 2016:- Sr. No. Detail Nos. 1

3 Municipal Corporation Amritsar e-News

Activities of Municipal Corporation, Amritsar during the

month of May, 2016 and in the coming near future.

I) CIVIL ENGINEERING DEPTT. :-

nzfwqs;o Pfjo d/ ftek; bJh (100% Development works) bZrGr Amt.Rs.212.00 Cr.

d/ sywhBhnK d/ N?Avo brk fdZs/ ;B, pRwpq hoey tYNfrW iv`co 27 kMmW dy toe

nkovo ( Amt. Rs. 38.62 Cr) ikoh eo fdZs/ gey hn ns/ pkeh rihMdy tYNfrW dw kMm

cMfIgV qoN vYitMg leI pRgqI ADIn c`l irhw hY[vYitMg hox auprMq bwkI

vrk Awrfr vI jwrI kr id`qy jwxgy Aqy bkwieAw kMmW d/ N?Avo brk fdZs/

jwxgy.

;wkoN f;Nh gqi?eN nXhB d{i/ uoB d/ Competition tk;s/? suJwv Byjx leI

vtsAYp nM.80549-55463 jwrI kIqw igAw hY, ijs iv`c imqI 31.05.16 q`k

l`gBg 1790 mYsj vI pRwpq hoey hn sK I' d{i/ uoB ftZu nfwqs;o Pfjo B{z

;wkoN f;Nh u?bAi bJh u[fDnk ik ;e/ .

Sihr dy v`K-v`K ih`isAW iv`c Cleanliness, Removal of Malba & Garbage and

Wild Growth dw kMm pRgqI ADIn c`l irhw hY, ijvy ik AwaUtr srkulr

rof, lwhorI gyt tU KzwnW gyt, njdIk iSvpUrI, hwl gyt, jI.tI rof dw

Awlw-duAwlw, myn rof hrIpurw jvwlw Astyt vwrf nM.53, mihqw rof Pokl

puAwieNt dIAW myn sVkW, vwrf nM.53 iSv ngr klonI, Fwb vsqI rwm

bjwr, Jbwl rof, DobI Gwt, sulqwnivMf gyt purwxI l`kVmMfI, hkImW gyt,

hukm isMG rof, iclfrn vwrf rof, njdIk tYNkI vwlw pwrk, iqkonI

pwrk, njdIk AwirAw smwj skUl k`trw moqI rwm, vwl istI dy AMdr,

cwtIivMf rof, GI mMfI coNk, njdIk Por AYs skUl Awid[

Page 4: MCA e-News - Amritsar · IV) MTP DEPARTMENT :-Total number of Building Plans submitted and sanctioned in the MTP Department during the Month of May, 2016:- Sr. No. Detail Nos. 1

4 Municipal Corporation Amritsar e-News

II) OPERATION & MAINTENANCE CELL :-

1. Under JICA (Japan International Cooperation Agency) assisted Amritsar

Sewerage Project amounting to Rs. 600.60 Cr., the work for the construction of

Interceptor/Trunk and lateral sewer in South & North Zone is in progress. In South

zone area against the scope of work for laying lateral sewer 101.04 Km., Trunk

sewer(RCC NP3) 25.48 Km., CIS/RCC HDPE 6.34 Km & house connection

17500 nos. Approx. 97.37 Km. lateral sewer, 24.91 Km. Trunk sewer(RCC NP3),

CIS/RCC HDPE 6.34 Km. sewer has been laid and 9250 nos. houses are connected

with the sewer. The remaining work of South zone shall be completed upto

June,2016. Similarly in North zone area against the scope of work for laying lateral

sewer 270.02 Km., Trunk sewer(RCC NP3) 22.53 Km., Cast in situ 16.66 Km. and

house connection 27500 nos. Approx. 147.90 Km. lateral sewer, 24.53 Km. Trunk

sewer(RCC NP3), 7.47 Km. Cast in situ sewer has been laid and 4047 nos. houses

are connected with the sewer. The remaining work of North zone shall be

completed upto October,2016.

2. Under JICA (Japan International Cooperation Agency) assisted Amritsar Sewerage

Project, the work for the construction of 2 No.s STPs & MPS of 95 MLD each

(Sewage Treatment Plant, Main Pumping Station) at Basarke Bhaini near Khapper

Kheri in South zone amounting to Rs. 80.30 Cr. and at Wadala Bhittewad near

Village Gausabad in North amounting to Rs. 84.70 Cr. has been allotted and the

work is in progress. In the South Zone, 74% of Civil Work completed. Work of

Aeration Tank, Primary Clarifier & Security Guard Room is completed.

Construction of units such as MPS, Secondary Clarifier, Digester, Sludge Thickener

& Staff Quarters, Primary Sludge Pump, Biological Sludge Pump is in progress.

Excavation & RCC of Supernatant Sump & Air Blower is in progress. At present in

North zone 76% of Civil Work completed. Work of Secondary, Primary & Aeration

Tank is in completed. Construction of units such as MPS, Digester, Sludge

Thickener & Staff Quarters, Primary Sludge Pump, Biological Sludge Pump is in

progress. Excavation & RCC of Supernatant Sump & Air Blower is in progress. The

work for the construction of STPs & MPS shall be completed upto June,2016.

Page 5: MCA e-News - Amritsar · IV) MTP DEPARTMENT :-Total number of Building Plans submitted and sanctioned in the MTP Department during the Month of May, 2016:- Sr. No. Detail Nos. 1

5 Municipal Corporation Amritsar e-News

3. Rehabilitation of existing Water Scheme in walled city area at Amritsar (Under

JNNURM) with a Project cost of Rs. 12.98 Cr. has been approved by the GoI. As

per the scope of work 65.12 Km. of Water Supply line (G.I./D.I. pipe lines) is to be

laid, 9 No’s. OHSRs (Over Head Service Reservoir) are to be repaired, 39 Nos.

Chlorinator & Flow Meter including 17500 nos. house connections. At present

64.30 Km. Water Supply line G.I./D.I. pipe lines laid and 17000 nos. house

connected with the water supply line and work almost completed.

4. Rehabilitation of existing Sewerage system in walled city area at Amritsar (Under

JNNURM) with a Project cost of Rs. 9.98 Cr. has been approved by the GoI. As

per the scope of work 18.60 Km. lateral sewer,0.42 Km. RCC Pipe Sewer and

6134 nos. house connections are to be made. At present work completed at site.

5. A project amounting to Rs. 202.34 Cr. in South-East zone of Amritsar Sewerage

Project with a scope for providing Water Supply, Sewerage, Sewage Treatment

Plants, Roads, Street Light, O&M for 10 years has been approved and the funding

agency of this project is JNNURM/GoP/ULBs. The work has been allotted to the

M/s. Shapoorji Pallonji & Co. Pvt. Ltd, SP Centre,41/44,Minoo Desai

Marg,Colaba,Mumbai agency for Rs. 183.59 Cr. and the scope of work includes

47 Km. Water Supply line, 4 Nos. T/wells, 4 Nos. OHSRs, 7500 nos. house

connection, 107.30 Km. Lateral sewer,17.50 Km. main sewer,20000 nos. house

connection,1 No. MPS (90 MLD), 1 No. IPS (15 MLD),1 No. STPs (27.50 MLD),

173970 Sq.mtr CC. road, 218750 Sq. mtr metalled road and 3520 nos. street light

points with O&M for 10 years. Presently, 1 No. T/well & 3 Nos. OHSRs in

Progress and 4 Km water supply laid, 39 Km lateral sedwer,9 km main sewer laid

and 1250 house connection connected with sewer line and 80 Km Sewer cleaned

and further in progress.

6. To transform service delivery of potable water supply system based on Surface

Water in Amritsar City, the Govt. of Punjab requested the World Bank for

providing Non-Lending Technical Assistance (NLTA). The World Bank awarded

this feasibility study to consultancy agency M/s. Royal Haskoning DHV Company

Pvt. Ltd. The Consulting agency finalized the feasibility report with an estimated

Page 6: MCA e-News - Amritsar · IV) MTP DEPARTMENT :-Total number of Building Plans submitted and sanctioned in the MTP Department during the Month of May, 2016:- Sr. No. Detail Nos. 1

6 Municipal Corporation Amritsar e-News

cost Rs.1358 Cr. which is submitted to the Govt. of Punjab of its final decision and

approval.

Primary clarifier

AERATION TANK

Page 7: MCA e-News - Amritsar · IV) MTP DEPARTMENT :-Total number of Building Plans submitted and sanctioned in the MTP Department during the Month of May, 2016:- Sr. No. Detail Nos. 1

7 Municipal Corporation Amritsar e-News

MAIN PUMPING STATION

SECONDARY CLARIFIER

Page 8: MCA e-News - Amritsar · IV) MTP DEPARTMENT :-Total number of Building Plans submitted and sanctioned in the MTP Department during the Month of May, 2016:- Sr. No. Detail Nos. 1

8 Municipal Corporation Amritsar e-News

ANAEROBIC SLUDGE DIGESTER

GRAVITY SLUDGE THICKENER

Page 9: MCA e-News - Amritsar · IV) MTP DEPARTMENT :-Total number of Building Plans submitted and sanctioned in the MTP Department during the Month of May, 2016:- Sr. No. Detail Nos. 1

9 Municipal Corporation Amritsar e-News

PRIMARY SLUDGE PUMP HOUSE

BIOLOGICAL SLUDGE SUMP

Page 10: MCA e-News - Amritsar · IV) MTP DEPARTMENT :-Total number of Building Plans submitted and sanctioned in the MTP Department during the Month of May, 2016:- Sr. No. Detail Nos. 1

10 Municipal Corporation Amritsar e-News

AIR BLOWER ROOM

THICKENED SLUDGE TRANSFER PUMP HOUSE AND SUPERNATANT SUMP

Page 11: MCA e-News - Amritsar · IV) MTP DEPARTMENT :-Total number of Building Plans submitted and sanctioned in the MTP Department during the Month of May, 2016:- Sr. No. Detail Nos. 1

11 Municipal Corporation Amritsar e-News

STAFF QUARTER

BOUNDARY WALL

MECHANICAL ITEMS

Page 12: MCA e-News - Amritsar · IV) MTP DEPARTMENT :-Total number of Building Plans submitted and sanctioned in the MTP Department during the Month of May, 2016:- Sr. No. Detail Nos. 1

12 Municipal Corporation Amritsar e-News

Page 13: MCA e-News - Amritsar · IV) MTP DEPARTMENT :-Total number of Building Plans submitted and sanctioned in the MTP Department during the Month of May, 2016:- Sr. No. Detail Nos. 1

13 Municipal Corporation Amritsar e-News

Page 14: MCA e-News - Amritsar · IV) MTP DEPARTMENT :-Total number of Building Plans submitted and sanctioned in the MTP Department during the Month of May, 2016:- Sr. No. Detail Nos. 1

14 Municipal Corporation Amritsar e-News

Name of Project:Design and Construction of 95 MLD STP and Main Pumping Station in South Zone at BasarkeBhaini on Trunkey basis (JICA- ASP-001)

Page 15: MCA e-News - Amritsar · IV) MTP DEPARTMENT :-Total number of Building Plans submitted and sanctioned in the MTP Department during the Month of May, 2016:- Sr. No. Detail Nos. 1

15 Municipal Corporation Amritsar e-News

Name of Project: Design and Construction of 95 MLD STP and Main Pumping Station in South Zone at BasarkeBhaini on Trunkey basis (JICA- ASP-001)

Page 16: MCA e-News - Amritsar · IV) MTP DEPARTMENT :-Total number of Building Plans submitted and sanctioned in the MTP Department during the Month of May, 2016:- Sr. No. Detail Nos. 1

16 Municipal Corporation Amritsar e-News

Name of Project:Design and Construction of 95 MLD STP and Main Pumping Station in South Zone at BasarkeBhaini on Trunkey basis (JICA- ASP-001)

Page 17: MCA e-News - Amritsar · IV) MTP DEPARTMENT :-Total number of Building Plans submitted and sanctioned in the MTP Department during the Month of May, 2016:- Sr. No. Detail Nos. 1

17 Municipal Corporation Amritsar e-News

Name of Project: Design and Construction of 95 MLD STP and Main Pumping Station in South Zone at BasarkeBhaini on Trunkey basis (JICA- ASP-001)

Page 18: MCA e-News - Amritsar · IV) MTP DEPARTMENT :-Total number of Building Plans submitted and sanctioned in the MTP Department during the Month of May, 2016:- Sr. No. Detail Nos. 1

18 Municipal Corporation Amritsar e-News

Name of Project: Design and Construction of 95 MLD STP and Main Pumping Station in South Zone at BasarkeBhaini on Trunkey basis (JICA- ASP-001)

Name of Project: Design and Construction of 95 MLD STP and Main Pumping Station in South Zone at BasarkeBhaini on Trunkey basis (JICA- ASP-001)

Page 19: MCA e-News - Amritsar · IV) MTP DEPARTMENT :-Total number of Building Plans submitted and sanctioned in the MTP Department during the Month of May, 2016:- Sr. No. Detail Nos. 1

19 Municipal Corporation Amritsar e-News

Name of Project: Design and Construction of 95 MLD STP and Main Pumping Station in South Zone at BasarkeBhaini on Trunkey basis (JICA- ASP-001)

Page 20: MCA e-News - Amritsar · IV) MTP DEPARTMENT :-Total number of Building Plans submitted and sanctioned in the MTP Department during the Month of May, 2016:- Sr. No. Detail Nos. 1

20 Municipal Corporation Amritsar e-News

Name of Project: Design and Construction of 95 MLD STP and Main Pumping Station in South Zone at BasarkeBhaini on Trunkey basis (JICA- ASP-001)

Page 21: MCA e-News - Amritsar · IV) MTP DEPARTMENT :-Total number of Building Plans submitted and sanctioned in the MTP Department during the Month of May, 2016:- Sr. No. Detail Nos. 1

21 Municipal Corporation Amritsar e-News

Name of Project: Design and Construction of 95 MLD STP and Main Pumping Station in South Zone at BasarkeBhaini on Trunkey basis (JICA- ASP-001)

Page 22: MCA e-News - Amritsar · IV) MTP DEPARTMENT :-Total number of Building Plans submitted and sanctioned in the MTP Department during the Month of May, 2016:- Sr. No. Detail Nos. 1

22 Municipal Corporation Amritsar e-News

Page 23: MCA e-News - Amritsar · IV) MTP DEPARTMENT :-Total number of Building Plans submitted and sanctioned in the MTP Department during the Month of May, 2016:- Sr. No. Detail Nos. 1

23 Municipal Corporation Amritsar e-News

Name of Project: Design and Construction of 95 MLD STP and Main Pumping Station in South Zone at BasarkeBhaini on Trunkey basis (JICA- ASP-001)

Page 24: MCA e-News - Amritsar · IV) MTP DEPARTMENT :-Total number of Building Plans submitted and sanctioned in the MTP Department during the Month of May, 2016:- Sr. No. Detail Nos. 1

24 Municipal Corporation Amritsar e-News

III) Health Department

Municipal Corporation, Amritsar organised fort nightly Sanitation week w.e.f. 1st

May to 15th May, 2016 in the factories falling under the jurisdiction of Municipal

Corporation, Amritsar. Inspection of cleanliness in and around the factories situated at

Focal Point, Amritsar & Tran Taran road, Amritsar was carried out. Sanitary facilities

maintained in the factories & to be given to the factory workers were also looked into.

Municipal Corporation, Amritsar also organised cleanliness drive in and around

Government offices & buildings situated at Court complex, Post offices, Municipal

Offices, Deputy Commissioner's office etc. w.e.f 16 May to 31 May 2016. All the

employees of Government offices took a mass pledge for maintaining cleanliness in &

around the Government Offices.

Micro plan of Integrated Municipal Solid Waste Management Project for Amritsar

cluster was also approved by the Govt. Now the consortium of M/s. Essel Infra projects

limited & M/s Hitachi Zosen India Pvt. Limited, Mumbai will start the work of collection

& transportation of garbage from the 52 wards of Municipal Corporation, Amritsar

w.e.f. 31 July 2016.

Municipal Corporation, Amritsar also issued letter of intent to M/s Lion service

India Limited, New Delhi for Mechanical Sweeping of the roads leading to Sh. Golden

Temple, Shri Durgiana Mandir & other major roads of the city.

Page 25: MCA e-News - Amritsar · IV) MTP DEPARTMENT :-Total number of Building Plans submitted and sanctioned in the MTP Department during the Month of May, 2016:- Sr. No. Detail Nos. 1

25 Municipal Corporation Amritsar e-News

IV) MTP DEPARTMENT :-

Total number of Building Plans submitted and sanctioned in the MTP Department

during the Month of May, 2016:-

Sr.

No.

Detail Nos.

1. Total cases 108

2. Residential 104

3. Commercial 4

4. Sanction cases 88

5. Objection 3

6. Rejected 0

7. Under process 20

V) LAND DEPARTMENT:-

The Land department of Municipal Corporation, Amritsar has constituted two

teams under the supervision of inspectors for the removal of temporary encroachments

from foot paths and roads. Other than dealing with the complaints received in the

department, these teams remove temporary encroachments in the different parts of the

city. Removal of encroachments is an ongoing process and is being under taken on daily

basis. Other than this, Enforcement Monitoring Committees have been constituted which

conduct weekly meetings and are regularly removing permanent encroachments in

different parts of the city at regular intervals.

Also, shopkeepers in the markets are being regularly requested through public

address systems to keep their merchandise/goods within their shops/premises and not to

display them on roads/footpaths. Other than regular removal of temporary encroachments

from roads and footpaths from different parts of the city, major anti encroachments drives

were carried out by the sub-enforcement committee's at O/s Golden Avenue, Majitha

Page 26: MCA e-News - Amritsar · IV) MTP DEPARTMENT :-Total number of Building Plans submitted and sanctioned in the MTP Department during the Month of May, 2016:- Sr. No. Detail Nos. 1

26 Municipal Corporation Amritsar e-News

Road, O/s Circular Road, Old Jail Road & Railway Road. Also Land Department

collected around Rs. 8.03 Lacs against Rent of shops and Rs. 2.12 Lacs against Tehbazari

during the month.

O/S GOLDEN AVENUE, MAJITHA ROAD

O/S CIRCULAR ROAD, OLD JAIL ROAD & RAILWAY ROAD

VI) ADVERTISEMENT DEPARTMENT:-

ivigAwpn ivBwg ngr ingm AMimRqsr v`loN 31 meI 2016

q`k 2 korV 53 l̀K 3 jikr Awmdn pRwpq kIqI Aqy ies smyN dOrwn 369

gYrkwƒnI qOr qy l`gy hoey borf/horifMg auqwr ky ngr ingm dy Ahwqy

ivc jmW krwey gey[

*****

Page 27: MCA e-News - Amritsar · IV) MTP DEPARTMENT :-Total number of Building Plans submitted and sanctioned in the MTP Department during the Month of May, 2016:- Sr. No. Detail Nos. 1

27 Municipal Corporation Amritsar e-News

Phone : 0183-2535499

Fax : 0183-2545155

Email : [email protected]

Website : www.amritsarcorp.com

Complaint Cell : 1800 1802 103

***********