  • 8/8/2019 MBP Presentation Revision 1

    1/26

    Gas Detection

    Terry Marshall [Manufacturing Technical]

    Bournville/Birmingham. UK

  • 8/8/2019 MBP Presentation Revision 1

    2/26

    Leak Management Strategy

    CTB strategy is to identify system components which are about tomalfunction before they do and minimise the loss of hazardous,environmentally damaging substances.

    CTB aims to improve the safety, reliability, productivity, andenvironmental impact of our process plants and building services

    through predictive maintenance programmes leading to:

    Better planned maintenance

    Reduced machine downtime

    Better use of in-house manpower

    Lower overall maintenance costs

    Enhanced quality of processed product and reduced waste

    Potential lower insurance costs

  • 8/8/2019 MBP Presentation Revision 1

    3/26

  • 8/8/2019 MBP Presentation Revision 1

    4/26

    Gas Detection Equipment Refrigerant Detectors

    Bespoke Design [CFC/HCFC Dependant]

    Unsuitable for Air, Nitrogen and other Fluids

    Non Quantifiable Detection

    Poor Sensitivity Detection Levels

    Manual Data Collection

    Manual Cost Analysis/Loss Levels

    Dated Technology

  • 8/8/2019 MBP Presentation Revision 1

    5/26

  • 8/8/2019 MBP Presentation Revision 1

    6/26

    SonicMan Leak Detector

  • 8/8/2019 MBP Presentation Revision 1

    7/26

    Gas Detection- Instrument Diagnosis

    Capability

    Refrigeration/Air Conditioning Systems

    Steam Compressed Air

    Gas

    Other Fluids [Ultrasonic Wave Generation Capability].

  • 8/8/2019 MBP Presentation Revision 1

    8/26

    Gas Detection- Instrument Diagnosis

    Capability

    Refrigeration/Air Conditioning Systems

    Steam

    Compressed Air

    Gas

    Other Fluids [Ultrasonic Wave Generation Capability].

  • 8/8/2019 MBP Presentation Revision 1

    9/26

    Case Studies

    U Block [Manufacturing]

    Bournville Birmingham.

    United Kingdom

  • 8/8/2019 MBP Presentation Revision 1

    10/26

    Refrigeration Systems

  • 8/8/2019 MBP Presentation Revision 1

    11/26

    U1W No. 8 & 9 Refrigeration System

    Isolation Valve [Condenser/Receiver]

    Fluid: HFC-134A

    Loss Rate 0.3m3/Hr Cost/Annum [2,500]

  • 8/8/2019 MBP Presentation Revision 1

    12/26

    U1E Packing Refrigeration System

    TEV Inlet Pipework

    Fluid: HCFC-69L

    Loss Rate 0.3m3/Hr Cost/Annum [2,500]

  • 8/8/2019 MBP Presentation Revision 1

    13/26

    U2WChilled Water Refrigeration System

    Compressor HP Gauge Line

    Fluid: HCFC-22

    Loss Rate 0.3m3/Hr Cost/Annum [1,500]

  • 8/8/2019 MBP Presentation Revision 1

    14/26

    U2WChilled Water Refrigeration System

    TEV Equalisation Pipework

    Fluid: HCFC-22

    Loss Rate 0.5m3/Hr Cost/Annum [1,800]

  • 8/8/2019 MBP Presentation Revision 1

    15/26

    U3WChilled Water Refrigeration System

    Air Cooled Condenser

    Fluid: HFC-134a

    Loss Rate 0.5m3/Hr Cost/Annum [2,800]

  • 8/8/2019 MBP Presentation Revision 1

    16/26

    U4W Intense Process Cooling Refrigeration System

    Oil Separator Flanged Connection

    Fluid: HCFC-22

    Loss Rate 0.3m3/Hr Cost/Annum [2,500]

  • 8/8/2019 MBP Presentation Revision 1

    17/26

    U5EChilled Water Refrigeration System

    Oil SeparatorLeak

    Fluid: HFC-134a

    Loss Rate 0.3m3/Hr Cost/Annum [2,500]

  • 8/8/2019 MBP Presentation Revision 1

    18/26

    Compressed Air Systems

  • 8/8/2019 MBP Presentation Revision 1

    19/26

    U3E Refrigeration System

    Cooling Water Hydronic Control Valve [PM]

    Fluid: Compressed Air

    Loss Rate 1.0m3/Hr Cost/Annum [1,000]

  • 8/8/2019 MBP Presentation Revision 1

    20/26

  • 8/8/2019 MBP Presentation Revision 1

    21/26

    Manufacturing Wrapping Machinery

    [Compressed AirLeaks]

  • 8/8/2019 MBP Presentation Revision 1

    22/26

    Manufacturing Equipment Services

    [Compressed AirLeaks]

  • 8/8/2019 MBP Presentation Revision 1

    23/26

    Manufacturing Services [Steam Leaks]

  • 8/8/2019 MBP Presentation Revision 1

    24/26

    Operational Cost Savings

    35-40,000 PER ANNUM!!!

  • 8/8/2019 MBP Presentation Revision 1

    25/26

    Product Literature

  • 8/8/2019 MBP Presentation Revision 1

    26/26

    Assistance/Further Information

    Contact:

    Paul Jobin [Manufacturing Technical]

    Linden 1

    BournvilleBirmingham

    B302LU

    Telephone: 0121458 2000Ext.

    Facsimile: 01214514375Email: [email protected]