mbo6 ship/aircraft time line 14 2128411182518 julyaugustsept point sur new horz sproul wecoma...
TRANSCRIPT
![Page 1: MBO6 Ship/Aircraft Time Line 14 2128411182518 JulyAugustSept POINT SUR NEW HORZ SPROUL WECOMA REVELLE FLIP SHANA RAE ZEPHYR TWIN OTTER Ramp ChavezGirtonRamp/Schmidt/Kunze](https://reader035.vdocuments.us/reader035/viewer/2022070414/5697c0021a28abf838cc2bea/html5/thumbnails/1.jpg)
MBO6 Ship/Aircraft Time Line
14 21 28 4 11 18 25 1 8July August Sept
POINT SUR
NEW HORZ
SPROUL
WECOMA
REVELLE
FLIP
SHANA RAE
ZEPHYR
TWIN OTTERRamp
Chavez GirtonRamp/Schmidt/Kunze
Pinkel/Klymak (tent)
15
Lee/D’Asaro
Stewart
Johnston/Rudnick
THOMPSON Cowles
D’Spain
Davis (when needed)
Gregg/Miller
Chavez
CYPR. SEAHealey
![Page 2: MBO6 Ship/Aircraft Time Line 14 2128411182518 JulyAugustSept POINT SUR NEW HORZ SPROUL WECOMA REVELLE FLIP SHANA RAE ZEPHYR TWIN OTTER Ramp ChavezGirtonRamp/Schmidt/Kunze](https://reader035.vdocuments.us/reader035/viewer/2022070414/5697c0021a28abf838cc2bea/html5/thumbnails/2.jpg)
Sanctuary Boundary
Nominal ASAP Box
Nominal DORADO Line
![Page 3: MBO6 Ship/Aircraft Time Line 14 2128411182518 JulyAugustSept POINT SUR NEW HORZ SPROUL WECOMA REVELLE FLIP SHANA RAE ZEPHYR TWIN OTTER Ramp ChavezGirtonRamp/Schmidt/Kunze](https://reader035.vdocuments.us/reader035/viewer/2022070414/5697c0021a28abf838cc2bea/html5/thumbnails/3.jpg)
Flight Path Comparison
![Page 4: MBO6 Ship/Aircraft Time Line 14 2128411182518 JulyAugustSept POINT SUR NEW HORZ SPROUL WECOMA REVELLE FLIP SHANA RAE ZEPHYR TWIN OTTER Ramp ChavezGirtonRamp/Schmidt/Kunze](https://reader035.vdocuments.us/reader035/viewer/2022070414/5697c0021a28abf838cc2bea/html5/thumbnails/4.jpg)
Issues to ResolveIssues to Resolve What are the dates for the What are the dates for the
experiment?experiment? Ship SurveysShip Surveys
DatesDates Survey AreaSurvey Area What to SampleWhat to Sample Can Rudnick/SeaSoar do final survey?Can Rudnick/SeaSoar do final survey? Demand for a final survey?Demand for a final survey?
Aircraft SurveysAircraft Surveys Large scale/model initializationLarge scale/model initialization Small scale/fluxes/model updatesSmall scale/fluxes/model updates
![Page 5: MBO6 Ship/Aircraft Time Line 14 2128411182518 JulyAugustSept POINT SUR NEW HORZ SPROUL WECOMA REVELLE FLIP SHANA RAE ZEPHYR TWIN OTTER Ramp ChavezGirtonRamp/Schmidt/Kunze](https://reader035.vdocuments.us/reader035/viewer/2022070414/5697c0021a28abf838cc2bea/html5/thumbnails/5.jpg)
Issues to Resolve - 2Issues to Resolve - 2 DORADO SurveysDORADO Surveys
Do from POINT SUR?Do from POINT SUR? Where/What to SurveyWhere/What to Survey Treat all propeller-driven assets as a groupTreat all propeller-driven assets as a group (“surging”)(“surging”)
Northern Line (Half Moon Bay)Northern Line (Half Moon Bay) For model initializationFor model initialization How to coverHow to cover
SpaceSpace At the MBARI Control RoomAt the MBARI Control Room Who needs to be in control room this time?Who needs to be in control room this time? On board ships at seaOn board ships at sea
![Page 6: MBO6 Ship/Aircraft Time Line 14 2128411182518 JulyAugustSept POINT SUR NEW HORZ SPROUL WECOMA REVELLE FLIP SHANA RAE ZEPHYR TWIN OTTER Ramp ChavezGirtonRamp/Schmidt/Kunze](https://reader035.vdocuments.us/reader035/viewer/2022070414/5697c0021a28abf838cc2bea/html5/thumbnails/6.jpg)
Issues to Resolve - 3Issues to Resolve - 3 CommunicationsCommunications
Ship to ShipShip to Ship Ships to ShoreShips to Shore
Coordination with other programsCoordination with other programs AESOPAESOP PLUSPLUS AWACSAWACS LOCOLOCO Optics (HES/OS?)Optics (HES/OS?)
Hyperspectral FlightsHyperspectral Flights Scofield AUVScofield AUV
![Page 7: MBO6 Ship/Aircraft Time Line 14 2128411182518 JulyAugustSept POINT SUR NEW HORZ SPROUL WECOMA REVELLE FLIP SHANA RAE ZEPHYR TWIN OTTER Ramp ChavezGirtonRamp/Schmidt/Kunze](https://reader035.vdocuments.us/reader035/viewer/2022070414/5697c0021a28abf838cc2bea/html5/thumbnails/7.jpg)
Issues to Resolve - 4Issues to Resolve - 4 Acoustic IssuesAcoustic Issues
Need to be up frontNeed to be up front Do Assessment, hopefully not full EISDo Assessment, hopefully not full EIS PLUSnet vs. SeaWeb “integration” PLUSnet vs. SeaWeb “integration” (or at least not interference!)(or at least not interference!)
Public RelationsPublic Relations Generate excitement at all levelsGenerate excitement at all levels
K-12K-12 General PublicGeneral Public Science CommunityScience Community
Need to work this in advanceNeed to work this in advance Coordinate between institutionsCoordinate between institutions Don’t miss big opportunityDon’t miss big opportunity
![Page 8: MBO6 Ship/Aircraft Time Line 14 2128411182518 JulyAugustSept POINT SUR NEW HORZ SPROUL WECOMA REVELLE FLIP SHANA RAE ZEPHYR TWIN OTTER Ramp ChavezGirtonRamp/Schmidt/Kunze](https://reader035.vdocuments.us/reader035/viewer/2022070414/5697c0021a28abf838cc2bea/html5/thumbnails/8.jpg)
Issues to Resolve - 5Issues to Resolve - 5 GlidersGliders
Number availableNumber available SPRAY - 4SPRAY - 4 SLOCUM – minimum 6SLOCUM – minimum 6 Seaglider (PLUSnet) – 5Seaglider (PLUSnet) – 5 The SeahorseThe Seahorse
Ralf Coming?Ralf Coming? Initial Deployment PatternInitial Deployment Pattern Etc.Etc.
![Page 9: MBO6 Ship/Aircraft Time Line 14 2128411182518 JulyAugustSept POINT SUR NEW HORZ SPROUL WECOMA REVELLE FLIP SHANA RAE ZEPHYR TWIN OTTER Ramp ChavezGirtonRamp/Schmidt/Kunze](https://reader035.vdocuments.us/reader035/viewer/2022070414/5697c0021a28abf838cc2bea/html5/thumbnails/9.jpg)
Issues to Resolve - 6Issues to Resolve - 6