mb 2 consulting manufacturing intelligence mark bacon michael breed pro-bono consultants senior...
TRANSCRIPT
![Page 1: MB 2 Consulting Manufacturing Intelligence Mark Bacon Michael Breed Pro-Bono Consultants Senior Design May 7, 2002](https://reader036.vdocuments.us/reader036/viewer/2022083006/56649f385503460f94c54619/html5/thumbnails/1.jpg)
MBMB22 Consulting ConsultingManufacturing Intelligence
Mark BaconMichael Breed
Pro-Bono Consultants
Senior DesignMay 7, 2002
![Page 2: MB 2 Consulting Manufacturing Intelligence Mark Bacon Michael Breed Pro-Bono Consultants Senior Design May 7, 2002](https://reader036.vdocuments.us/reader036/viewer/2022083006/56649f385503460f94c54619/html5/thumbnails/2.jpg)
Optimizing Distribution
Forecasting Capacity for Growth
![Page 3: MB 2 Consulting Manufacturing Intelligence Mark Bacon Michael Breed Pro-Bono Consultants Senior Design May 7, 2002](https://reader036.vdocuments.us/reader036/viewer/2022083006/56649f385503460f94c54619/html5/thumbnails/3.jpg)
Current Situation
Brinker $3 Billion company
Own numerous concepts, hundreds of stores• mom-and-pop store mentality
• business operations of various concepts vary
Plans for growth of several concepts
![Page 4: MB 2 Consulting Manufacturing Intelligence Mark Bacon Michael Breed Pro-Bono Consultants Senior Design May 7, 2002](https://reader036.vdocuments.us/reader036/viewer/2022083006/56649f385503460f94c54619/html5/thumbnails/4.jpg)
Problems/Concerns with Current Situation
Need to Optimize Production and Distribution
Do they have the production capacity for the projected growth
![Page 5: MB 2 Consulting Manufacturing Intelligence Mark Bacon Michael Breed Pro-Bono Consultants Senior Design May 7, 2002](https://reader036.vdocuments.us/reader036/viewer/2022083006/56649f385503460f94c54619/html5/thumbnails/5.jpg)
Objectives
•Optimize distribution in attempt to utilize maximum existing capacities and meet projected growth
•Analyze potential scenarios to increase capacities
•Cost benefit analysis of scenarios
![Page 6: MB 2 Consulting Manufacturing Intelligence Mark Bacon Michael Breed Pro-Bono Consultants Senior Design May 7, 2002](https://reader036.vdocuments.us/reader036/viewer/2022083006/56649f385503460f94c54619/html5/thumbnails/6.jpg)
Problem Formulation
•Collecting of Data
•Network Sketch• arcs, varying distribution costs
• production costs of plants
•Integer Program, AMPL model
•Three year projections for three concepts
![Page 7: MB 2 Consulting Manufacturing Intelligence Mark Bacon Michael Breed Pro-Bono Consultants Senior Design May 7, 2002](https://reader036.vdocuments.us/reader036/viewer/2022083006/56649f385503460f94c54619/html5/thumbnails/7.jpg)
Scenarios Run on AMPL Model
1. Current Conditions
2. Increase Production Schedule• increase work week form 5-20hr days to 6-20 hr days
• requires additional freezers in Santa Ana and Chicago
3. Equipment Investment
4. Increase Production Schedule and Equipment Investment
![Page 8: MB 2 Consulting Manufacturing Intelligence Mark Bacon Michael Breed Pro-Bono Consultants Senior Design May 7, 2002](https://reader036.vdocuments.us/reader036/viewer/2022083006/56649f385503460f94c54619/html5/thumbnails/8.jpg)
Results
1 2 3 43,758 4,342 7,519 8,643
104 92 56 37142 154 190 209
26.46479 28.19481 39.57368 41.35407
48.66667 88.25 59.15789
Unserviced Stores
Cost per Add'l Store Serviced
Scenario Comparisons
Cost (thousands)
Cost per Serviced Store
Serviced Stores
Cost per Serviced Store
20
25
30
35
40
45
1 2 3 4
Scenario
Co
st (
tho
usa
nd
s)
Stores Serviced
100120140160180200220
1 2 3 4
Scenario
Num
ber o
f Sto
res
![Page 9: MB 2 Consulting Manufacturing Intelligence Mark Bacon Michael Breed Pro-Bono Consultants Senior Design May 7, 2002](https://reader036.vdocuments.us/reader036/viewer/2022083006/56649f385503460f94c54619/html5/thumbnails/9.jpg)
Conclusions/Recommendations
1. Stretch current fixed assets• Implement increase in production schedule to 6-20hr days
• Streamline current production process to reduce waste
2. Research Substantial Facility and Equipment Investment
3. Facilitate initial growth with distribution that utilizes capacity capabilities